Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.6 LAccepted-Finance | ₹14.6 L | L1 | Accepted-Finance L1 |
| 2 | L2₹14.7 LRejected-Finance | ₹14.7 L | L2 | Rejected-Finance L2 |
| 3 | L3₹14.7 LRejected-Finance | ₹14.7 L | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical pre bid not qualify |
| 5 | Rejected-Technical | - | - | Rejected-Technical pre bid not qualify |
Tender Value
Refer Docs
EMD Value
₹35,000
Closing Date
20 May 2026, 9:00 amClosed
EE RED
URMORA SONBHADR
Gram Baghmandava me mahuli ghorpa marge se yadav tola sampark marge and navnirman ka karya
2026_REDUP_1148330_1
33/EE RED/ 2026-27 DATE- 06.04.2026
Open Tender
Civil Works
90 days
baghmandawa
as per nit and t1
2 documents required · 2 mandatory
₹2,704
₹35,000
26 Jun 2026
14 May 2026
20 May 2026
14 May 2026
20 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | 90 | cum | 204.92 | ₹18,442.8 |
| 2 | GSB Grading-1
Construction of granular Sub-base by providing well graded material , spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as perTechincal Specification clause 401 | 60 | cum | 2,397.23 | ₹1,43,833.8 |
| 3 | WBM Grade-3
Providing, laying, spreading and compacting stone aggregates of 53mm to 22.4mm sizes (Crusher broken) to water bound macadam (WBM III) specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.(WBM III) | 45 | cum | 3,225.44 | ₹1,45,144.8 |
| 4 | Construction of Subgrade and earthen shoulders with approoved soil with all the lifts and lead laying in layers ,breaking clods ,dressing to required lines , curves,grade and sections,watering and compaction to meet atleast 100% procter density completeto specification requirements as per technical specification clause 301.5 | 146.25 | cum | 206.06 | ₹30,136.28 |
| 5 | Cement Concrete Pavement: Construction of un-reinforceced ,dowel jointed at expansion and consruction joint only, plai cement concrete pavement, thickness as per design ,over a prepaired sub base withh 43 grade cement or any other type as per clouse 1501 .2.2. M-30 grade corse and fine aggregates confirming to IS:383 maximum size of coarse aggregates not exeding 25 mm mixed in a concrete mixer of not less than 0.2 cum. capacity and apropreate weigh batcher using approoved mix design laid in a approoved fixed site form work (steel chanel ) laying and fixing of 125 micron thick polythene film wedges steel plates including levelling the form work as per drawing ,speading the concrete with shovels rackes, compacted using needle screed and plate vibrators and finished in continuous oparation including provision of contraction and expansion ,construction jointes, applying debonding strips, primer,sealant dowel bars ,near aproches to bridge /culvert and construction joints admixtures as approoved curing of concrete slab for 14 days.using curing compounds(where specified ) and water finishing to lines and grade as per drawing and technical specification clause 1501. | 90 | cum | 6,588.44 | ₹5,92,959.6 |
| 6 | Earthwork in excavationin ordinary soil for structures as Per drawing and techanical specification clause 305 including setting out, construction of shoring and bracing, removal of stumps and other deleterous material and disposal up to a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material. | 55.5 | cum | 381.9 | ₹21,195.45 |
| 7 | Plain Cement Concrete (PCC) M-10(1:3:6 Nominal Mix) in open foundation complete as per drawing and techanical specification Clause 802. | 6.94 | cum | 5,463.83 | ₹37,918.98 |
| 8 | Providing and laying Reinforced Cement Concrete in substructure as per drawing and techanical specification clauses 800 (Excluding cost of Reinforcement). | 39.78 | cum | 6,794.21 | ₹2,70,273.67 |
| 9 | Supply fitting and placing MS bar reinforcement in sub structure complete as per drawing and techanical specificatin Clauses 1002. | 31.22 | qtl | 6,821.29 | ₹2,12,960.67 |
| 10 | Supply and fixing of sign board, including painting, letting etc. complete | 1 | job | 5,700 | ₹5,700 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.15 MB
BOQ_2149396.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid