Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 LAccepted-AOC 54 B BAMONSAI SANGUEM SOUTH GOA 403 704 | SOUTH GOA | GOA | 403704 | L1 | Accepted-AOC Being the 1st lowest | |
| 2 | L2₹12.6 L+₹73,105.50 (6.18%)Rejected-Finance GOA | L2 | Rejected-Finance finacially rejected being 2st lowest |
Tender Value
₹12.0 L
EMD Value
₹23,930
Closing Date
27 Aug 2024, 3:00 pmClosed
Shrikant B Gaonkar
Executive Engineer PWD WD XII Sanguem-Goa
Construction of reinforced cement concrete safety compound wall abutting the 33KV substation at the 160MLD Salauli water treatment plant. L3
2024_PWD_16873_1
48-1/PWD-WD XII-ASW/2024-25/02 L3
Open Tender
Civil Works - Water Works
Percentage
120 days
Executive Engineer PWD WD XII Sanguem-Goa
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
₹23,930
22 Oct 2024
21 Aug 2024
29 Aug 2024
21 Aug 2024
27 Aug 2024
21 Aug 2024
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .