Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance BATOTE | KATHUA | JAMMU AND KASHMIR | 184143 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹2,600
Closing Date
27 Feb 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
XEN JAL SHAKTI PHE MECHANICAL DIVISION UDHAMPUR
MH
Replacement of components of 300 KVA voltage stabilizer installed at pumping station Baryal
2023_PHE_205407_1
ENIT NO. 212 OF 2022-23
Open Tender
Repair and Maintenance Works
Item Rate
12 days
XEN JAL SHAKTI PHE MECHANICAL DIVISION UDHAMPUR
Replacement of components of 300 KVA voltage stabilizer installed at pumping station Baryal
7 documents required · 7 mandatory
₹200
XEN JAL SHAKTI PHE MECHANICAL DIVISION UDHAMPUR
₹2,600
Yes
6 Mar 2023
17 Feb 2023
28 Feb 2023
17 Feb 2023
27 Feb 2023
17 Feb 2023
Amount
Replacement of components of 300 KVA voltage stabilizer installed at pumping station Baryal by way of disconnecting all incoming and outgoing electrical connections, dragging of voltage stabilizer outside pump room. Making of temporary arrangement so as to protect the stabilizer from rain / water. Dismantling of voltage stabilizer and extraction of internal assembly from it’s chamber using chain pulley block, tripod stand & other tools and tackles. to draw out damaged rotary switches-2nos (complete). Providing and fitting of new rotary switches-02nos alongwith there regulators. Job also includes Extraction of 01 no. damaged coil and shifting to workshop followed by replacement with 1no., copper wound coil complete with insulation with varnish and shifting back to site. Lowering of internal assembly with all the phase coils inside the chamber. Filling of 200 liters of new transformer oil. Replacement of volt meter 01 no. ampere meter 01 no., phase indicators and internal wiring, closing top cover. Dragging of voltage stabilizer inside pump room and making electrical connection with LT side of electric transformer and with panel & testing on load. Complete job includes cost of material, carriage charges, hire charges of tools and tackles etc. (complete job).
SATYAM CONSTRUCTION & TRADING COMPANY
DINESH KUMAR KHAJURIA
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .