Superintending Engineer
65/1 Ramamoorthy Road Virudhunagar
running Works Contract for effecting various works for a period of six months in Kallamanaickenpatty section of Rajapalayam Division
2024_EB_513481_1
SE/VREDC/AEE/MM/ET no 57, Dt 20.12.2024
Open Tender
Electrical Works
Works
180 days
AE / D / KLMNPTY
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹9,000
Yes
9 Jan 2025
23 Dec 2024
9 Jan 2025
23 Dec 2024
8 Jan 2025
23 Dec 2024
Amount
Running Works Contract for effecting various works for a period of six months in Kallamanaickenpatty section of Rajapalayam Division
Loading&Unloading of 8m, PSC poles
Loading&Unloading of 9m, 9.14m RCC poles
Loading&Unloading of RS Joists, tubular & rail poles (above 9.14m)
Transporting of poles from road side to Work spot7.32m, 7.5m, 8m, 8.23m RCC poles/km
Transporting of poles from road side to Work spot9m, 9.14m RCC poles, RS Joists, tubular & rail pole/km
Excavation of pole pit (1.25m * 0.5m*1.5m)in Normal Ground
Erection
Excavation of pole pit (1.25m * 0.6m*1.83m) in Normal Ground
Erection
Excavation of pole pit (1.25m * 0.6m*2.19m) in Normal Ground
Erection
Concreting of poles as per Board Standards (2'*2'*5'). The material such as sand, jelly, etc., have to be supplied by the contractor except Cement supplied by contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.complete.
Coping of poles
Coil earthing per pole & pole earthing
Excavation of stay pit (1.00m * 0.5m*1.5m)
Erection
V cross arm, Channel cross Arm3 1/2'
LT Three phase cross arm
LT single phase cross arm
HT / LT TI fitting
Tapping channel cross arm
Erection of LT Side arm with stud
g.Guarding Cross Arm
For 7/3.35 ACSR or 7/3.15 AAAC
For 7/2.59 ACSR or 7/2.50 AAAC
Below 250 KVA
LT pin point to cut point
Single Phase service connection
Three Phase service connection
7.5Mtr /8Mtr PSC & Pole
9.14Mtr RCC Pole and above
Dismantling of stay with guy shackle complete
Dismantling of TI Fitting
Dismantling of Single phase/ 3 phase cross arm
Pole (Colour washing with emulsion on Labour only) (Double coat)
Transformer structure (Double coat)
For transformer only (Double coat)
Numbering of poles With Paint
Set right of leaning of HT pole / LT pole including X arms, TI fittings
9 mtr long RCC Pole (Square Section) complete
Maintenance of A/B switch
Maintenance of Single Pole Distribution Transformer and Structure complete
Replacement of GI wire in LT cut points replaced with Lt metal parts
Replacement of worn out AB Switch knife, checking of alignment and lubrication
a)Attending H.T jumper cut
b)Attending L.T jumper cut
a)Replacement of H.T Disc
b)Replacement of HT Pin insulator
a) Replacement of L.T shackle with metal parts
b) Replacement of L.T pin insulator
Maintenance of DP Structure complete
ப jumper provision ( including of service wire disconnection & reconnection)
Set right of Tilted X arm
stage.html
html • 0.02 MB
finance_610696.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .