Loading…
Loading…
Tender Value
₹26.8 L
EMD Value
₹53,540
Closing Date
30 Jul 2026, 4:00 pm4d left
Executive Engineer Flood Control Division Akhnoor
Executive Engineer Flood Control Division Akhnoor
Construction of Crate Revetment for Protection of Agricultural land and houses in Kharah and Lohaki Nallah at places
2026_IFC_317485_1
e-Nit 14 of 2026-27
Open Tender
Civil Works
Percentage
30 days
Khour
Construction of Crate Revetment for Protection of Agricultural land and houses in Kharah and Lohaki Nallah at places
2 documents required · 2 mandatory
₹500
Executive Engineer Flood Control Division Akhnoor
₹53,540
23 Jul 2026
23 Jul 2026
31 Jul 2026
23 Jul 2026
30 Jul 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earthfor 1 meter from cutting edge and disposal of surplus excavated earth as directed: | 1,126.08 | cum | 187.3 | ₹2,10,914.78 |
| 2 | Hand-packing stones in wire-crates; excluding cost of crates and stones | 1,192.32 | cum | 371.15 | ₹4,42,529.57 |
| 3 | Supply of nallah stones. | 1,013.47 | cum | 700 | ₹7,09,429 |
| 4 | Filling available, excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m and lift upto 1.5m. | 225.22 | cum | 218.4 | ₹49,188.05 |
| 5 | Carriage of Nallah Stones at an Av. Distance 18km by MT. and 50m head load | 1,013.47 | cum | 687.59 | ₹6,96,851.84 |
| 6 | Carriage of material from Jammu to Site of work at an average distance 50Km mech. & 50m head load Qty. of crate and B.A wire | 7.18 | MT | 2,122.56 | ₹15,239.98 |
| 7 | Cost of Crate | 138 | nos | 3,863 | ₹5,33,094 |
| 8 | Add cost of B.A. Wire | 276 | kgs | 71 | ₹19,596 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
BOQ_1040582.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].