Loading…
Loading…
| Sl No | Description | Qty | Unit | Gomathi L2 | P.Mohana L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation and depositing on bank with
an initial lead of 10m and lift of 2m in the following
classification of soils as directed by Deparment
officers. Hard stiff clay, block cotton, hard red earth
shales, murram, ordinary gravel, stoney eart
First depth of 2m | 57.24 | M3 | 274.15 ₹15,693.72 | 263.7 ₹15,095.51 Lowest |
| 2.00 | 2 nd Depth | 11.45 | M3 | 285.14 ₹3,264.57 | 275.3 ₹3,151.91 Lowest |
| 3.00 | Sand filling for foundation with clear river sand
including cost of sand watering, ramming and
consolidation etc complete as directed by
Department officers. | 4.29 | M3 | 2,091.14 ₹8,977.26 | 2,090.45 ₹8,974.3 Lowest |
| 4.00 | Cement concrete 1:4:8 (one cement four sand and
eight aggregates) using 40mm HBGS for levelling
course for foundation including the cost of mixing
concrete, ramming, curing etc., complete as directed
by Department officers. | 4.29 | M3 | 5,934.15 ₹25,475.31 | 5,933 ₹25,470.37 Lowest |
| 5.00 | RCC in M30 GRADE using graded aggregtes of HBGs
excluding cost of reinforcement, centering, shuttering
strutting, but including cost of mixing concrete,
placing, vibrating with mechanical vibrator, finishing,
curing etc., complete as directed by Department
For footing below G.L. ( 1,50 to 4,50 below GL ) | 13.52 | M3 | 9,047.43 ₹1,22,321.25 Lowest | 9,047.43 ₹1,22,321.25 Lowest |
| 6.00 | For Column and Brace upto G.L ( 0 to1,50 below GL ) | 1.49 | M3 | 8,915 ₹13,256.61 Lowest | 8,915 ₹13,256.61 Lowest |
| 7.00 | For column and brace I 0 to 4.5m from GL | 1.99 | M3 | 9,048.15 ₹18,014.87 | 9,047.4 ₹18,013.37 Lowest |
| 8.00 | For column and brace II 4.5m to 7.32m from GL. | 2.46 | M3 | 9,307.4 ₹22,896.2 Lowest | 9,307.4 ₹22,896.2 Lowest |
| 9.00 | For column and brace III 7.32 to 10.98m from GL | 2.27 | M3 | 9,566.85 ₹21,735.88 Lowest | 9,566.85 ₹21,735.88 Lowest |
| 10.00 | For column beam floor slab side wall from 10.98m to
14.64 m from GL | 11.88 | M3 | 9,826.5 ₹1,16,748.65 Lowest | 9,826.5 ₹1,16,748.65 Lowest |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
31 Dec 2025, 5:00 pmClosed
BDO BP Cuddalore
Block Development office Cuddalore
Construction of OHT (30000 Litre Capacity) with Pump Room at Pazhaya Colony in Thirupanampakkam Panchayat Cuddalore
2025_RDTN_636801_1
A3/3667/2025 PMAGY 2025-26
Open Tender
Civil Works - Others
Item Rate
180 days
Block Development office Cuddalore
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹20,000
Yes
7 Feb 2026
27 Dec 2025
31 Dec 2025
27 Dec 2025
31 Dec 2025
27 Dec 2025
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Deparment officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart First depth of 2m
2 nd Depth
Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by Department officers.
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Department officers.
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by Department For footing below G.L. ( 1,50 to 4,50 below GL )
For Column and Brace upto G.L ( 0 to1,50 below GL )
For column and brace I 0 to 4.5m from GL
For column and brace II 4.5m to 7.32m from GL.
For column and brace III 7.32 to 10.98m from GL
For column beam floor slab side wall from 10.98m to 14.64 m from GL
For side wall, hance and Roof slab from 14.64 m to 18.30 m from GL
For column footing and GL Brace.
For Brace I GL 0 to 3.30 M
For Brace II 5.3. to 6.30 m
6.3. to 7.30 m For Brace II
8.3. to 9.30 m For Brace III
For Floor Beam and Bottm of Floor slab
For column Below GL
For column GL 0 to 3.30M.
For column ( 3.31m to 4.30m ).
For column ( 4.31m to 5.30m).
For Column (5.31m to 6.30m )
For Column (6.31m to 7.30m )
For Column (7.31m to 8.30m )
For Column (8.31m to 9.30m )
For Column (9.31m to 10.30m )
For Column (10.31m to 11.30m )
For Column (11.31m to 11.40m )
CURVED SURFACE For Side Wall, & Floor slab sides and Haunch
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by Deparment officers..
Painting two coats with approved cement paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete and as directed by Deparment officers
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete cur
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete cur
Providing manhole cover of size 1x1 0.75 X 0.75 M in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edges and as directed by Department officers.
Providing GI ventilating arrangements mosquito proof nylon net with 50 mm GI pipes and cowl and as directed by Deparment officers
Painting Department emblem 1 x 1 on the SR with enamel paint as per Board's specification and as directed by Deparment officers
Supply of GI Pipes for OHT Connections 65 mm dia
Supply and Delivery of G.M.Gate valve 65mm size
Supply & Delivery of 65 mm G.I Tee
Supply & Delivery of 65 mm G.I Coupling
Supply & Delivery of 65 mm G.I bend
Supply & Delivery of 90mm T.Coupler PVC
Supply & Delivery of 80mm x 65mm G.I.Reducer
Supply & Delivery of 65mm G.I.flange set
Labour charges for fixing of G.I. Pipes & Specials for OHT pipe connections as directed by the Deparment Officers,
Refilling of the foundation with execavated soil in layers of thick including ramming watering etc., complete as directed by the Department officers
Pump Room Sub Estimate
Pipe Line
Sub estimate for Platform
EB Board Shifting Charges
Provision for Name board
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_762107.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
Thirupanampakkam.pdf
Tender Documents • 0.07 MB
BOQ_762107.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .