Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-Finance | ₹10.0 L | L1 | Accepted-Finance ADMITTED |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
18 Sept 2026, 12:00 pmClosed
SARPANCH GRAM PANCHAYAT KOLASAR
GRAM PANCHAYAT KOLASAR
RAJKIYA MAHATMA GHANDI ENGLISH MADHYAM ME 1 CLASS ROOM MAY BARAMDA NIRMAN KARY GRAM PANCHAYAT KOLASAR
2026_PRD_596246_1
KOLASAR_2026-27_65-68
Open Tender
Civil Works
Percentage
90 days
KOLASAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
SARPANCH GRAM PANCHAYAT KOLASAR, MDRISL JAIPUR
₹20,000
Yes
19 Sept 2026
9 Sept 2026
18 Sept 2026
9 Sept 2026
18 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation excavation up to 1.5m, ramming bottom, dressing sides, back filling and disposal of surplus soil with in a lead of 50m. | 33.25 | Cum | 178.46 | ₹5,933.88 |
| 2 | Cement concrete in foundation using brick ballast size 40mm including curing and compaction etc in 1:4:8 mix | 5.54 | Cum | 3,518.04 | ₹19,496.1 |
| 3 | Brick work in foundation and plinth using bricks of class designation-75 in CM 1:6 | 31.06 | Cum | 4,932.81 | ₹1,53,204.59 |
| 4 | DPC with RCC Beam 1:1:5:3 mix | 2.18 | Cum | 5,354.51 | ₹11,694.25 |
| 5 | Brick work in super structure using bricks of class designation-75 in CM 1:6 | 38.59 | Cum | 5,181.42 | ₹1,99,970.21 |
| 6 | Reinforced cement concrete work including curing compaction, finishing with rendering in cement sand mortar 1:3 and making good and joints excluding cost of centering, shuttering and reinforcement in 1:1.5:3 (1cement: 1.5course sand: 3-graded stone aggregate 20mm nominal size) | 2.98 | Cum | 5,570.29 | ₹16,573.68 |
| 7 | P & F reinforcement for RCC work including straightening, cutting bending, placing in position and binding (including cost of binding wire) in foundation and super structure up to 4.5M height above plinth level hot rooled deformed (IS : 1139) sold teisted (IS:1786)bars | 450.62 | Kg | 97.94 | ₹44,133.41 |
| 8 | Centering and shuttering with plywood or steel sheets including strutting, propping, bracing both ways with wooden members and removal of from work | 31.62 | Sqm | 319.04 | ₹10,086.77 |
| 9 | S & F Steel grinder including cutting, hoisting and fixing in position up to 4.5 height | 625.6 | Kg | 92.52 | ₹57,880.51 |
| 10 | S & F Stone Sriwan | 2.81 | Sqm | 1,668.6 | ₹4,682.09 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
BOQ_1057464.xls
BOQ • 0.29 MB
kolbid1.pdf
Tender Documents • 11.65 MB
kolasarextend2.pdf
PDF • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .