| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹69.4 LAdmitted-Finance | -29.15% | ₹69.4 L | L1 | Admitted-Finance |
| 2 | L2₹70.0 LAdmitted-Finance | -28.52% | ₹70.0 L | L2 | Admitted-Finance |
| 3 | L3₹70.9 LAdmitted-Finance | -27.65% | ₹70.9 L | L3 | Admitted-Finance |
| 4 | L4₹72.3 LAdmitted-Finance | -26.21% | ₹72.3 L | L4 | Admitted-Finance |
| 5 | L5₹87.9 LAdmitted-Finance | -10.20% | ₹87.9 L | L5 | Admitted-Finance |
Tender Value
₹97.9 L
EMD Value
₹2.0 L
Closing Date
18 Mar 2026, 3:00 pmClosed
EXECUTIVE ENGINEER CD IV
EE CD IV IFC LM BUND OFFICE COMPLEX SHASHTRI NAGAR DELHI-31
Providing and Fixing of RCC Post fencing with Medium Blade (RBT) at Kh. No. 172/42 and 173/21-22 in Badarpur Khadar area, under Central Forest Division.
2026_IFC_288480_1
157/EE/CD-IV/IFC/2025-26
Open Tender
Civil Works
120 days
EAST
Please refer to Tender Documents
6 documents required · 6 mandatory
₹0
₹2.0 L
19 Mar 2026
11 Mar 2026
18 Mar 2026
11 Mar 2026
18 Mar 2026
11 Mar 2026
Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Columns, Pillars, Piers, Abutments, Posts and Struts
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level and above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge. Made of G.I. wire of dia 4 mm
Fencing with R.C.C. post placed at required distance, embedded concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines of medium blade (RBT) 8.60 KG weighing per 100 metres (minimum), Zinc Coating- 240 GSM between the two posts fitted and fixed with M.S. Plate on hook G.I. binding wire tied to 6 mm bar round nibs fixed while casting the RCC fencing (cost of R.C.C. struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of medium blade (RBT) used.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm)
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
157TENDERDOCUMENT.pdf
Tender Documents • 0.33 MB
BOQ_382591.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid