Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.0 CrAccepted-Finance | ₹7.0 Cr | 1 | Accepted-Finance due to 1st lowest |
| 2 | 2₹7.1 Cr+₹7.1 L (1.01%)Rejected-Finance | ₹7.1 Cr+₹7.1 L (1.01%) | 2 | Rejected-Finance 2 |
| 3 | Rejected-Technical B 52 NIRALA NAGAR LUCKNOW | LUCKNOW | UTTAR PRADESH | - | - | Rejected-Technical Rejected as per Evaluation |
| 4 | Rejected-Technical 4 295 SECTOR NEAR DELHI PUBLIC SCHOOL GOMTI NAGAR LUCKNOW 226010 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226010 | - | - | Rejected-Technical Rejected as per Evaluation |
| 5 | Rejected-Technical GORAKHPUR | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | - | - | Rejected-Technical Rejected as per Evaluation |
| Sl No | Description | Qty | Unit | Ajay Builders Engineers & Construction Pvt Ltd L1 | M/s Nirbhay Constructions L2 |
|---|---|---|---|---|---|
| 1.00 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 1,750 | Cum | 1,392 ₹24,36,000 Lowest | 1,406 ₹24,60,500 |
| 2.00 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits area lead up to 10 Km with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to97% proctor density requirement of table No. 300-2 MORTH specification no. 305 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 500 | Cum | 377 ₹1,88,500 Lowest | 381 ₹1,90,500 |
| 3.00 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 210 | Cum | 4,774 ₹10,02,540 Lowest | 4,823 ₹10,12,830 |
| 4.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 168 | Cum | 5,133 ₹8,62,344 Lowest | 5,185 ₹8,71,080 |
| 5.00 | Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 1,050 | Sqm | 50 ₹52,500 Lowest | 50 ₹52,500 Lowest |
| 6.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-40) @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 105 | Cum | 13,279 ₹13,94,295 Lowest | 13,413 ₹14,08,365 |
| 7.00 | Providing and applying tack coat with bitumen (VG-10) using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 3,937 | Sqm | 14 ₹55,118 Lowest | 14 ₹55,118 Lowest |
| 8.00 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG-40) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 157 | Cum | 15,723 ₹24,68,511 Lowest | 15,882 ₹24,93,474 |
| 9.00 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 967 | Cum | 870 ₹8,41,290 Lowest | 879 ₹8,49,993 |
| 10.00 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 8,075 | Cum | 188 ₹15,18,100 Lowest | 190 ₹15,34,250 |
Tender Value
₹7 Cr
EMD Value
₹14 L
Closing Date
7 Apr 2026, 12:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Gorakhpur Circle PWD Gorakhpur
Construction of RCC Drain From Passport Offine to Khajanchi Chauraha in District Gorakhpur in FY 2025-26 Lot No 1 of 1
2026_CEGKP_1132363_1
2346/135C-Gkp Circle/2026 Dated 25-03-2026
Open Tender
Civil Works
Item Rate
365 days
Gorakhpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹14 L
4 May 2026
1 Apr 2026
7 Apr 2026
1 Apr 2026
7 Apr 2026
1 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | - | Cum | - | - |
| 2 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits area lead up to 10 Km with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to97% proctor density requirement of table No. 300-2 MORTH specification no. 305 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | - | Cum | - | - |
| 3 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | - | Cum | - | - |
| 4 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | - | Cum | - | - |
| 5 | Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | - | Sqm | - | - |
| 6 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-40) @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | - | Cum | - | - |
| 7 | Providing and applying tack coat with bitumen (VG-10) using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | - | Sqm | - | - |
| 8 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG-40) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | - | Cum | - | - |
| 9 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | - | Cum | - | - |
| 10 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.01 MB
Addendum_SBD_Lot_1.pdf
Tender Documents • 0.43 MB
SBDPart2.pdf
Tender Documents • 0.47 MB
SBDPart1.pdf
Tender Documents • 0.79 MB
SpecialConditions.pdf
Tender Documents • 0.04 MB
BOQ_2113349.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .