| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.5 LAccepted-AOC | L1 | Accepted-AOC Being 1st lowest | |
| 2 | L2₹41.9 L+₹20,400.40 (0.49%)Rejected-Finance | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹43.0 L+₹1.3 L (3.10%)Rejected-Finance MB NO 180 MG ROAD JUNGLIGHAT PORT BLAIR 744 103 | PORT BLAIR | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744103 | L3 | Rejected-Finance Other than lowest | |
| 4 | L4₹43.2 L+₹1.4 L (3.40%)Rejected-Finance | L4 | Rejected-Finance Other than lowest | |
| 5 | L5₹44.0 L+₹2.2 L (5.34%)Rejected-Finance 1 TROPICAL REFRIGERATION PHONIX BAY PORT BLAIR PORT BLAIR ANDAMAN NICOBAR 744101 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744101 | L5 | Rejected-Finance Other than lowest |
Tender Value
Refer Docs
EMD Value
₹82,000
Closing Date
10 Jun 2021, 6:00 pmClosed
GE(I)866EWS CARNICOBAR
GE(I)866EWS CARNICOBAR
Maintenance and Operation of pump sets and its comprehensive maintenance, repair/replacement of water supply distribution lines with water supply chemical including cleaning of water storage tanks at AF Station Carnicobar
2021_MES_444490_1
8506/21-22/E8
Open Tender
Civil Works
Item Rate
330 days
AREA UNDER GE(I)866EWS CARNICOBAR
As per tender document
8 documents required · 8 mandatory
₹500
Yes
GE(I)866EWS
₹82,000
Yes
28 Jun 2021
20 May 2021
16 Jun 2021
20 May 2021
10 Jun 2021
3 Jun 2021
Amount
Maintenance and Operation of water pumping installation at Main Pump House, 04 X15 HP centrifugal Mono Block Pumps, 02 X15 HP centrifugal Mono Block Pumps, water distribution with 01(One)Skilled Person (FGM) in three shifts as under:- (a) 1st shift - 0600 hrs - 1400 hrs, (b) 2nd shift - 1400 hrs - 2200 hrs. (c) 3rd Shift 2200 hrs to 0600 hrs (i) FGM for operting the various capacity pump sets having minimum 04 years experience in operation and maintanance of pumping installation and control panels, treatement plants, water distribution system etc., in reputed firm, complete all as specified and directed. (ii) The pumping installations comprising of pump sets of capacity up to 30 HP, starter panels, and other switch gears, Sluice/butterfly valves etc: (iii) The pumping installation will be operated in 3 shifts is as above and timing of shift and diployment all as directed. (d) The person deployed in shift will not leave the duty station until reliever reported and take over the complete installation for operation.
Note:- (a) The quoted unit rate against above item shall be based on minimum wages as notifed by the Government of India / State Govt. / Union Teritory / Local body which ever is higher including all statuarry provisions such as EPF, ESIC, Bonus, LWC, Taxes etc as applicable as on Bid Sub End Date. The quoted unit rate shall not be less than these provisions in any case. (b) Contractor shall claim RAR/FB payment along with documentary proof towards payent of Min Wages, EPF, ESIC, LWC etc. as applicable. In case any variation same shall be adjusted as per provisions stipulated in CA. (c) Quoted unit rate shall be deemed to be inclusive of all the documents ,Log sheet, attendance register which shall be maintained by the operator during currency of work. (d) Sum of double the quoted rate will be recovered in case operator found absent in the installation. Suitable reliever shall be provided during off shift operator. (e) Tools for minor repair be provided by the Contractor. (f) Uniform with safety shoe, first aid box for operator will be provided by the contractor.
Note (Contd....):- (g) The operator should posses minimum ITI/ Experience by the OEM in operation & maintenance of Pumps and same also be approved by the accepting officer within one week from the issue of work order. (h) Salary of the operators be paid by the contractor in their respective adhar linked accounts confirming to labour law of Andaman Nicobar Govt and summary will be produced to the department at time of payment. (j) Man power shall have insurance for Rs. 2.00 Lakh provided by the Contractor. (k) The necessary gland packing for pumps and control valves to avoid leakage of water and greasing of all bearings in every four months interval carried out with out any extra cost.
Maintenance and Operation of water pumping installation at PTT Pump House 03 X 30 HP centrifugal Mono Block Pumps, DG Set 125 KVA dewatering by 01(one) Skilled Person with following shifts as under:- (a) 1st shift - 0600 hrs - 1400 hrs, (b) 2nd shift - 1400 hrs - 2200 hrs. (i) FGM for operting the various capacity pump sets having minimum 04 years experience in operation and maintanance of pumping installation and control panels, treatement plants, water distribution system etc., in reputed firm, complete all as specified and directed. (ii) The pumping installations comprising of pump sets of capacity up to 30 HP, starter panels, and other switch gears, Sluice/butterfly valves etc: (iii) The pumping installation will be operated in 2 shifts is as above and timing of shift and diployment all as directed. (iv) The person deployed in shift will not leave the duty station until reliever reported and take over the complete installation for operation.
Note:- (a) The quoted unit rate against above item shall be based on minimum wages as notifed by the Government of India / State Govt. / Union Teritory / Local body which ever is higher including all statuarry provisions such as EPF, ESIC, Bonus, LWC, Taxes etc as applicable as on Bid Sub End Date. The quoted unit rate shall not be less than these provisions in any case. (b) Contractor shall claim RAR/FB payment along with documentary proof towards payent of Min Wages, EPF, ESIC, LWC etc. as applicable. In case any variation same shall be adjusted as per provisions stipulated in CA. (c) Quoted unit rate shall be deemed to be inclusive of all the documents ,Log sheet, attendance register which shall be maintained by the operator during currency of work. (d) Sum of double the quoted rate will be recovered in case operator found absent in the installation. Suitable reliever shall be provided during off shift operator. (e) Tools for minor repair be provided by the Contractor. (f) Uniform with safety shoe, first aid box for operator will be provided by the contractor.
Note (Contd....):- (g) The operator should posses minimum ITI/ Experience by the OEM in operation & maintenance of Pumps and same also be approved by the accepting officer within one week from the issue of work order. (h) Salary of the operators be paid by the contractor in their respective adhar linked accounts confirming to labour law of Andaman Nicobar Govt and summary will be produced to the department at time of payment. (j) Man power shall have insurance for Rs. 2.00 Lakh provided by the Contractor. (k) The necessary gland packing for pumps and control valves to avoid leakage of water and greasing of all bearings in every four months interval carried out with out any extra cost.
Maintenance and Operation of water supply valve of the pump house water supply installation by 01(one) Semi Skilled Person in two shift as as under :- (a) 1st shift - 0600 hrs - 1400 hrs, (b) 2nd shift - 1400 hrs - 2200 hrs. (i) FGM for operting the various capacity pump sets having minimum 04 years experience in operation and maintanance of pumping installation and control panels, treatement plants, water distribution system etc., in reputed firm, complete all as specified and directed. (ii) The pumping installations comprising of pump sets of capacity up to 30 HP, starter panels, and other switch gears, Sluice/butterfly valves etc: (iii) The pumping installation will be operated in 2 shifts is as above and timing of shift and diployment all as directed. (iv) The person deployed in shift will not leave the duty station until reliever reported and take over the complete installation for operation.
Note:- (a) The quoted unit rate against above item shall be based on minimum wages as notifed by the Government of India / State Govt. / Union Teritory / Local body which ever is higher including all statuarry provisions such as EPF, ESIC, Bonus, LWC, Taxes etc as applicable as on Bid Sub End Date. The quoted unit rate shall not be less than these provisions in any case. (b) Contractor shall claim RAR/FB payment along with documentary proof towards payent of Min Wages, EPF, ESIC, LWC etc. as applicable. In case any variation same shall be adjusted as per provisions stipulated in CA. (c) Quoted unit rate shall be deemed to be inclusive of all the documents ,Log sheet, attendance register which shall be maintained by the operator during currency of work. (d) Sum of double the quoted rate will be recovered in case operator found absent in the installation. Suitable reliever shall be provided during off shift operator. (e) Tools for minor repair be provided by the Contractor. (f) Uniform with safety shoe, first aid box for operator will be provided by the contractor.
Note (Contd....):- (g) The operator should posses minimum ITI/ Experience by the OEM in operation & maintenance of Pumps and same also be approved by the accepting officer within one week from the issue of work order. (h) Salary of the operators be paid by the contractor in their respective adhar linked accounts confirming to labour law of Andaman Nicobar Govt and summary will be produced to the department at time of payment. (j) Man power shall have insurance for Rs. 2.00 Lakh provided by the Contractor. (k) The necessary gland packing for pumps and control valves to avoid leakage of water and greasing of all bearings in every four months interval carried out with out any extra cost.
Supply only calcium based chlorine granule for disinfection of water complete all as specified and as directed . Make - Declibac, RMCO, or equivalent of approved makes
Supply and fix in repairs of 100 mm dia butter fly valve flange type cast iron body as per IS 210 FG 200 with stain less steel stem as per IS 6603 and PTFE/Gunmetel both including necessary nut bolts washers and gasket etc. complete all as specified and as directed .
Supply and fix in repairs of 80 mm dia butter fly valve flange type cast iron body as per IS 210 FG 200 with stain less steel stem as per IS 6603 and PTFE/Gunmetel both including necessary nut bolts washers and gasket etc. complete all as specified and as directed.
Material and Labour for collecting water sample from different wells in Carnicobar, packing it safely in sterlized bottles as required quantity and send it to approved govt laboratory (TWAD - Tamilnadu water and drainage board test lab or other approved labs) for testing of potable water/raw water as per IS 10500 with following parameters colour, odour, turbidity, conductivity, TDS, PH,alkalinity, hardness, calcium, magnessium,iron,manganese,ammonia,nitrate,nitrite,chloride,fluoride,sulfite,phosphate,silica,free chlorine,standard plate count ,totalcoliform ,fecalcoliform, streptococci and special element tests complete all as specified and as directed .
Excavation in trenches not exceedding 1.5 mtr wide and not exceeding 1.5mtr depth and getting it out in soft/loose soil including forming bottom surface to required level for laying of GI pipe lines complete all as specified and as directed .
Returnning, filling in and including excavated soil including spreading, levelling, watering and well ramming in layers not exceeding 15cm complete all as specified and as directed .
Removing surplus spoil to a distance not exc 50 mtr away and depositing where directed at a level not exceeding 1.5 mtr above the starting point complete all as specified and as directed .
M & L for 100 mm bore steel water tubing, medium grade, galvanized with all necessary fittings laid in trenches/ fixed to walls/ on floors including taking down of existing unserviceable pipes complete all as specified and directed. ( Make : Tata, Jindal, Bansal)
Description all as per item No.11 above, but 80mm dia GI Pipe.
Description all as per item No.11 above, but 50mm dia GI Pipe.
Description all as per item No.11 above, but 40mm dia GI Pipe.
Description all as per item No.11 above , but 25mm dia GI Pipe.
Description all as per item No.11 above, but 20mm dia GI Pipe.
Supply and replacing Rubber Star Coupling suitable for up to 30 HP Pumpset , including taking down of existing couplers complete all as specified and as directed .
M&L for Cleaning of RCC over head reservoir of capacity 75000 gallons staged on more than 18 metre height staging after draining out the water from the tank including complete removal of silt, sludge, fungus, dirt deposited on the internal surfaces of tank by scrapping with wire brush and removing vegetation if any, washing internal surfaces including ceiling with clean water mixed with bleaching powder twice in inner surface, and applying two coats of cement base paint to internal surface including ceilings & wall complete etc including writing, cleaning date/due date for cleaning with white enamel paint on black colour surface (height of the reservoir 18.6m) complete all as specified and as directed. Note : Water tanks will be cleaned twice once at begininng of the contract and once after the six month of first cleaning.
All as Sl item No 18 above, but 10,000 Gallons ( Height of reservoir more than 9.5 Mtr ) capacity complete all as specified and as directed.
Cleaning of RCC SWT'S reservoir of 10,000 gallons of capacity after draining out the water from the tanks including removal of silt /sludge deposited in the tank with wire brush and removing vegetation if any, washing the inner surface complete with bleaching powder, white washing the tank from inside with lime powder including writing of cleaning date/due date for cleaning with white enamel paint on black colour surface complete all as directed. Note : Water tanks will be cleaned twice once at begininng of the contract and once after the six month of first cleaning.
All as per item No.20 above, but 5,000 gallons capacity.
Cleaning of RCC / PVC overhead service tanks up to 500 ltrs capacity, after draining out the water from the tank including removal of silt / sludge deposited in the tank with wire brush and removing vegetation if any, washing the inner surfaces with bleaching powder complete and applying two coats of cement base paint to internal surface including ceilings and wall complete etc all as specified and directed at staging / any height including writing letters clearly mentioning the date of cleaning and due date of cleaning on the tanks with white synthetic enamel paint over a coat of black painted surface(Size 40 cm x50 cm) complete all as specified and as directed . Note : Water tanks will be cleaned twice once at begininng of the contract and once after the six month of first cleaning.
Description all as per item No 22 above, but 1,000 Ltrs capacity
Description all as per item No 22 above, but 2,000 Ltrs capacity
Description all as per item No 22 above, but above 2,000 ltrs and upto 5,000 Ltrs capacity
Dismantling existing unserviceable PVC water tanks and supply and fix PVC rotational moulded water tank two layered of 2000 Ltr capacity hoisted and fixed in position including provision of necessary float valve, inlet/ outlet /overflow pipe connection complete testing all as specified as directed .
All as per item No 26 above, but 1000 Ltr capacity
All as per item No 26 above, but 500 Ltr capacity
Supply and fix in repairs of PVC ball valves of size 25 mm dia ,high pressure,with polythene float and flynut complete,screwed for ironpipe or brassferrule and fixed including taking down of old worn out valve complete all as specified and as directed .
Supply and fix in repairs of PVC ball valves of size 20 mm dia ,high pressure,with polythene float and flynut complete,screwed for ironpipe or brassferrule and fixed complete all as specified and as directed .
Supply and fix in repairs of Gun-metal, globe or gate valves, oif size 50 mm dia with iron wheel head, screwed both ends for ironpipe and fixed complete all as specified and as directed .
All as per item No 31 above, but of Size 40mm dia
All as per item No 31 above, but of Size 25mm dia
All as per item No 31 above, but of Size 20mm dia
Cutting of existing water supply pipe line including excavation , retiurning & filling in , removal and insertion of suitable fittings such as Tees, bends, elbows etc and connetion, testing all as directed complete all as specified and as directed.
Taking out the pipe line of size 20 to 40 mm dia bore from trenches/ wall / suface for repair and rectify the leakage from pipe line including necessary T&P for cutting / therading / welding of pipe line in any situation for making leak proof all as directed. Note - (i) Excavation earth work ,if any required shall be deemed to be included in quoted unit rate. (ii) Fittings for repair such as elbow,union, tee, nipple etc measured as supply only items of schedule 'A' here in after. (iii) The repair work carried out all as per direction of Engr-In- Charge complete all as specified and as directed .
All as per item no. 36 here in before but for pipe line of size 50 to 100 mm dia ---do---
Supply only GI elbow 20 mm dia
Supply only GI tee 20 mm dia
Supply only GI union 20 mm dia
Supply only GI nipple 20 mm dia 50 mm long
Supply only GI elbow 25 mm dia any type
Supply only GI tee 25 mm dia equal or un equal
Supply only GI union 25 mm dia
Supply only GI nipple 25 mm dia 50 mm long
Supply only GI elbow 40 mm dia any type (equal or un equal)
Supply only GI tee 40 mm dia equal or un equal
Supply only GI union 40 mm dia
Supply only GI nipple 40 mm dia 50 mm long
Supply only GI elbow 50 mm dia equal or unequal
Supply only GI tee 50 mm dia equal or unequal
Supply only GI union 50 mm dia
Supply only GI nipple 50 mm dia 50 mm long
M&L for preparation of old concrete, plastered surfaces of walls of any height , cornices etc by brooming down with steel wire brushing, scrapping down smoke soot ,moulds, mass and efflorescent salts etc and applying one coat of exterior weather proof paint over a coat of primer all as specified and as directed .
M&L for preparation of old painted surfaces including cleaning of pipes, channels, angles exceeding 10 cm girth or width painting with one coat of synthetic enamel paint complete all as specified and as directed .
M&L for plain cement concrete as in foundations or pipe support or coping or any other work type B2 (1:2:4) with 40 mm graded aggregate finished fair & even surface complete all as specified and as directed .
Taking down of burnt induction motor of 15/30 HP capacity 3 Phase 415 Volt from common base frame including disconnect electrical connection and pump coupling transporatation to workshop (Port Blair) & back, opening of startor & rotor for rewinding of motor with supper enameled copper conductor of existing size including varnishing of windings, replacement of all old insulation packing of stator slots, terminal plate reassamble the motor testiong on bench re fixing of motor in common on base frame with pump reconect all electrical connections testing of pump set complete all as directed.
Taking down of centrifugal pump assambely of capacity 25 HP 17 LPS from common base frame and transporatation to workshop (Port Blair) & back, opening of pump assambely and replace the worn out parts as given below including necessary lathwork reassambel the same and refixing its existing position and coupling with squirel cage induction motor and testing of pump all as directed (a) Impeller assambley (Brass/Stainless Steel) (b) Shaft Stainless steel (c ) Bush brass -2 Nos, (d) Spacers -01Set (e) Gland packing color (f) Nuts & bolts, packing gasket as required all as directed by Engineer in Charge.
Supply and fix 100 mm dia foot valve cast iron flanged as per IS:4038 standared internals leather/rubber washer including necessary gasket and taking down unserviceable foot valve all as directed
Supply and fix 200 mm dia foot valve cast iron flanged as per IS:4038 standared internals leather/rubber washer including necessary gasket and taking down unserviceable foot valve all as directed
Supply & fixing in repairs cast iron sluice valve class ‘PN-1’ of 250 mm bore ISI marked with IS 14846 with flanged ends and drilled, gun metal spindle, CI gate with brass ring and iron wheel handle, cast iron cap, complete with neoprene rubber gasket joint and nuts bolts (high tensile), washers etc, complete including testing all as specified.Make: KIRLOSKAR/ BIR/ JINDAL/ UPADHYAY/ VENUS/ LEADER/ IVC/ L&T/ ZOLOTO as approved.
Supply & fixing in repairs cast iron sluice valve class ‘PN-1’ of 150 mm bore ISI marked with IS 14846 with flanged ends and drilled, gun metal spindle, CI gate with brass ring and iron wheel handle, cast iron cap, complete with neoprene rubber gasket joint and nuts bolts (high tensile), washers etc, complete including testing all as specified.Make: KIRLOSKAR/ BIR/ JINDAL/ UPADHYAY/ VENUS/ LEADER/ IVC/ L&T/ ZOLOTO as approved.
Supply & fixing in repairs cast iron sluice valve class ‘PN-1’ of 100 mm bore ISI marked with IS 14846 with flanged ends and drilled, gun metal spindle, CI gate with brass ring and iron wheel handle, cast iron cap, complete with neoprene rubber gasket joint and nuts bolts (high tensile), washers etc, complete including testing all as specified.Make: KIRLOSKAR/ BIR/ JINDAL/ UPADHYAY/ VENUS/ LEADER/ IVC/ L&T/ ZOLOTO as approved.
Supply & fixing in repairs cast iron sluice valve class ‘PN-1’ of 80 mm bore ISI marked with IS 14846 with flanged ends and drilled, gun metal spindle, CI gate with brass ring and iron wheel handle, cast iron cap, complete with neoprene rubber gasket joint and nuts bolts (high tensile), washers etc, complete including testing all as specified.Make: KIRLOSKAR/ BIR/ JINDAL/ UPADHYAY/ VENUS/ LEADER/ IVC/ L&T/ ZOLOTO as approved.
Demolition of PCC unreiforced in ground floor and paving not exceeding 15cm thickness (below or above ground level) complete all as directed by Engineer in Charge
M&L for 150mm thickness of PCC (1:2:4) type B2 (using 40mm graded stone aggregate as in hard standing /Paving finished even and smooth without using extre cement all as directed by Engineer in Charge.
M&L for 75mm thickness of PCC (1:3:6) type C2 (using 40mm graded stone aggregate as in hard standing /Paving finished even and smooth without using extre cement all as directed by Engineer in Charge.
M&L for rendering 15mm thick in cement mortar (1:4) on fair face of brick or concrete wall surface finished even and smooth without using extra cement all as directed by Engineer in Charge.
SKY GROUP
Kathir Marketing Services
KML CONSTRUCTION
Tropical Refrigeration
MGP Enterprises
Ravi Enterprises
EVEREST COOLING WORKS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .