Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.7 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹68.9 L+₹18,710.32 (0.27%)Rejected-AOC | L2 | Rejected-AOC Rejected |
Tender Value
Refer Docs
EMD Value
₹44,500
Closing Date
11 Mar 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE OFFICER
Arulmigu Selva Vinayagar Palani Andavar Thadu Guru Samy, Temple, Kondithoppu, Chennai 600 079.
RECONSTRUCTION OF ARULMIGU SELVAVINAYAGAR PAZHANIAANDAWAR and THADHUGURUSWAMI TEMPLE KONDITHOPU CHENNAI
2024_HRCE_503838_2
756405/2024
Open Tender
Civil Works
Lump-sum
365 days
A/M SELVAVINAYAGAR PAZHANIAANDAWAR THDHUGURSWAMI
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹44,500
17 Jun 2025
21 Feb 2025
11 Mar 2025
21 Feb 2025
11 Mar 2025
21 Feb 2025
Amount
Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 3 mts. and clearing and levelling the site, etc., complete complying with standard specification
Cement concrete 1:5:10 (One part of cement five part of M-sand and ten part of HBG jelly) for foundation using 40mm gauge HBG jelly inclusive of shoring strutting and baling out water where ever necessary ramming curing etc.,complete as per Std, Specification and as directed by the Dept, Officers
Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers
Providing and laying position, Standardised concrete mi M-20 Grade in accordance with IS:456-2000, using 20mm and down graded hard brocken granite stone jelly for all Rcc items of works with minimum cement content of 3250 kg/cum and maximum water cement ratio of 0.55, inculding admiture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retart setting of concrete, improve workablity without imparing strengh and durability with about (5 cum)7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m)5156 kg of 10-12 mm machine crushed stone jelly and with about(4.79 cu.m)7670 kg of M-sand, but eculding cost of reinforcement grill and fabricating charges, centering and shuttering and also inculding laying, vibrating with mechanical vibrtors, finishing, curing, etc, complete complying with standred specification and as directed by the departmentel officers.the coarse and fine aggregates to be used shoul comply with the requirments of IS standreds. (No separate payment will be made by the Department for the excess usage of materialS).
For foundation and basement
Ground floor
First floor
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
Foundation and Basement
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Roof beam & Roof Slab
Column
Curved surfaces
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Brick masonry Cement Mortar 1:4 (one part of cement four part of sand) using Second class ground moulded Chamber Burnt bricks size 9" x 43/8" x 23/4" including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for vimanam / gopuram
Kalkaram Upto 15'0" for Sannathi
Vimanam/Gopuram of height up to 15' 0" (excluding kalkaram)
Brick work in cement mortar 1:5 (one part of cement and five part of sand) using second class ground moulded Chamber Burnt bricks size 9" x 43/8" x 23/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc complete complying with standard specification.
Ground floor
Providing Vargapoochu over the corewalls of Vimanams/Gopurams, with Cement Mortar1:4 (one part of cement four part of sand) complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Cement Mortarl:4and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area.
For kalkaram
Vimanam/ Gopuram of height Up to 15'0" excluding Kalkaram
Plastering with Cement mortar 1:5 (one part of cement and five part of sand), 12mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications.
Special plastering for R.C.C. slab beam and sunshades with Cement mortar 1:3 (one part of cement and three part of sand), 10mm thick including cost and conveyance of all materials and labour charges, curing etc. complete complying with standard specifications.
Supply of cut stone for carrying out temple structure works such as of nilaikkal and etc,. all comple complying with standard specification.
Temple structures upto 5'-00" length
Temple structures from 5'-00"-10'-00" length
Dressing and fixing charges for new cut stones of nilaikkal etc., excluding the cost of cut stone but including cost of labour and all complete complying as per standard specifications
Nilaikaal (Nagabandham poo)
Flooring with cut stone slab of size 600 x 600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and labour charges for paving and pointing with cement mortar 1:3 (one part of cement and three part of sand) etc all complete complying with standard specification.
Dressing Three Line
Dressing One line
Providing new sudhai vigrahams in the vimanams and Rajagopurams with Copper rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in cement mortar 1:3 (one part of cement and three part of sand) finishing the same with cement mortar 1:3 (one part of cement and three part of sand) bringing to the correct shape (Lakshana) in conformist with silpa sastra inclusive of special ornaments, weapons, peedam etc., complete and providing cement mortar. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and Copper rods. binding wire all labour for working in heights, curing lifting of materials etc., complete including Exterior Emulsion painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is provided the rate with peetam may be adopted as detailed hereunder)
Sudhai size Up to 1'0"
Sudhai size above 1'0" up to 2' 6"
Sudhai size above 2' 6" up to 3' 6"
Painting two coat with approved water based exterior emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface, curing in all floors including brushes etc., complete compyling as per standard specification.
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Supplying & fixing Teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specifications
Door size 1.07m x 1.98m
Door size 1.04m x 1.38m
Door size 2.13m x 2.97m
Varnishing the new wood work with two 2 coats of Varnish of good quality and color over one coat of primer over new wood work include costs of all materials, brushes charges etc, complete complying with standard specifications.
Supplying and fixing mild steel grill gate for windows, ventilators, etc., including cost conveyance of all materials and fixing in position including priming coat etc complete with standard specifications.
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over one coat of red oxide priming coat in all floors including cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works)
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with Non Flamable Shaded coverings, providing ladder arrangements, country wood plant for working, inspection etc, complete hire charges only for erection, maintenance and removing the same on completion of the work1 sq,ft.
Vimanam/Gopuram upto 15'-00" ht
Supplying and fixing of shade net (green net) for under construction works of vimanam and gopuram including labour and etc., all complete complete complying standard specification.
CHINNADURAI STHAPATHY (BID ID -1267682)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_627195.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .