| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹34.4 LAccepted-AOC BOOTHIPURAM NORTH STREET CHENNAMANAYAKKANPATTY POST THADIKOMBU DINDIGUL DINDIGUL | DINDIGUL | ₹34.4 L | 1 | Accepted-AOC Lowest Amount |
| 2 | 2₹34.5 LRejected-AOC | ₹34.5 L | 2 | Rejected-AOC Highest Amount |
| Sl No | Description | Qty | Unit | V RENGANAYAGI CONTRACTOR L1 | P VEERACHAMY CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork Excavation for foundation in all types of soils and sub soils including soft disintegrated rock and soft rock to the full depth including all leads and lifts etc., complete complying with the standard specification, drawing and as directed by the departmental Engineers. | 208 | m3 | 54,870.4 ₹54,870.40 | 55,120 ₹55,120 |
| 2.00 | Plain Cement concrete of mix 1:4:8 (One cement four M-sand eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including shoring, strutting forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. | 21.5 | m3 | 1,18,185.5 ₹1.2 L | 1,18,250 ₹1.2 L |
| 3.00Centering charges of RCC Works for slab and beams including cost and conveyance and all labour charges etc., complete as per standard specifications. | |||||
| 3.01 | With Strutting | 224 | m2 | 1,59,152 ₹1.6 L | 1,59,264 ₹1.6 L |
| 3.02 | for Coloumn | 322.5 | m2 | 1,91,887.5 ₹1.9 L | 1,93,500 ₹1.9 L |
| 4.00 | RCC 1:1½:3 (One cement one point five M-sand and three aggregates) mix using 20mm gauge hard granite broken stone jelly in all RCC works connected to the work excluding shuttering , Centering and cost of Reinforcement grills but including curing ,finishing etc complete with standard specification | 63.5 | m3 | 5,32,320.5 ₹5.3 L | 5,32,447.5 ₹5.3 L |
| 5.00 | Supplying and Fabricaton of TMT rods including cost of cutting,bending and tying with cost of binding wire including cost and conveyance of all materials and labours charges etc., complete as per standard specification | 5,700 | Kg | 5,29,530 ₹5.3 L | 5,30,100 ₹5.3 L |
| 6.00 | Brick Work in Cement Mortor 1:5 Mix (one cement, five sand ) using new best country Bricks of size 8 ¾” x 4 ¼” x 2 ¾” from approved quarry including cost and conveyance of all materials to site. loading and unloading charges and labour charges for mixing, laying and curing etc. complete. complying with std. specifications. | 142 | m3 | 10,63,722 ₹10.6 L | 10,63,864 ₹10.6 L |
| 7.00 | Plastering with cement mortar 1: 5 ( one cement and five P.Sand) mix to 12mm thick including cost and conveyance of all materials to site including curing etc.,complete as per standard specification – 10m2 | 1,417 | m2 | 4,05,970.5 ₹4.1 L | 4,06,679 ₹4.1 L |
| 8.00 | Painting the new walls two coats over one coat of priming with best Emulsion paint of approved colour and quality including preparation of surface and finishing neatly etc., complete complying with standard specification and as directed by the department officers etc., complete complying with standard specifications. | 1,431 | m2 | 3,87,801 ₹3.9 L | 3,89,232 ₹3.9 L |
Tender Value
₹41 L
EMD Value
₹41,000
Closing Date
13 Feb 2026, 3:00 pmClosed
Executive Officer
Thadikombu Town Panchayat
Construction of Compound Wall at Maravapatti Infant Jesus High School in Thadikombu Town Panchayat, Dindigul District.
2026_DTP_654557_1
30/2026
Open Tender
Civil Works - Others
180 days
Executive Officer, Thadikombu Town Panchayat
As Per Norms
3 documents required · 3 mandatory
₹0
₹41,000
Thadikombu Town Panchayat
25 Apr 2026
11 Feb 2026
13 Feb 2026
11 Feb 2026
13 Feb 2026
11 Feb 2026
11 Feb 2026 - 13 Feb 2026
11 Feb 2026
Earthwork Excavation for foundation in all types of soils and sub soils including soft disintegrated rock and soft rock to the full depth including all leads and lifts etc., complete complying with the standard specification, drawing and as directed by the departmental Engineers.
Plain Cement concrete of mix 1:4:8 (One cement four M-sand eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including shoring, strutting forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification.
Centering charges of RCC Works for slab and beams including cost and conveyance and all labour charges etc., complete as per standard specifications.
With Strutting
for Coloumn
RCC 1:1½:3 (One cement one point five M-sand and three aggregates) mix using 20mm gauge hard granite broken stone jelly in all RCC works connected to the work excluding shuttering , Centering and cost of Reinforcement grills but including curing ,finishing etc complete with standard specification
Supplying and Fabricaton of TMT rods including cost of cutting,bending and tying with cost of binding wire including cost and conveyance of all materials and labours charges etc., complete as per standard specification
Brick Work in Cement Mortor 1:5 Mix (one cement, five sand ) using new best country Bricks of size 8 ¾” x 4 ¼” x 2 ¾” from approved quarry including cost and conveyance of all materials to site. loading and unloading charges and labour charges for mixing, laying and curing etc. complete. complying with std. specifications.
Plastering with cement mortar 1: 5 ( one cement and five P.Sand) mix to 12mm thick including cost and conveyance of all materials to site including curing etc.,complete as per standard specification – 10m2
Painting the new walls two coats over one coat of priming with best Emulsion paint of approved colour and quality including preparation of surface and finishing neatly etc., complete complying with standard specification and as directed by the department officers etc., complete complying with standard specifications.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
Tendernotice_2.pdf
PDF • 0.27 MB
BOQ_784859.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid