Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-AOC BUS STAND BEENA SONEBHADRA U P 231220 | SONBHADRA | UTTAR PRADESH | 231220 | L1 | Accepted-AOC As per TCR and its subsequent approval. |
Tender Value
₹5.6 L
EMD Value
₹7,010
Closing Date
1 Apr 2024, 9:00 amClosed
Office of Staff Officer (EM), Bina
Office of Area General Manager Bina Project NCL U.P. 231220
Installation, shifting, commissioning and dismantling of pontoons, pump-motor sets and other associated electrical equipment at various locations in mines before, during and after monsoon 2024 at Bina Project.
2024_NCL_304957_1
B/EM/eTender/2023-24/53 dated 13.03.2024
Open Tender
Electrical and Maintenance Works
Item Rate
120 days
Bina Project
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,010
22 Apr 2024
14 Mar 2024
2 Apr 2024
14 Mar 2024
1 Apr 2024
15 Mar 2024
14 Mar 2024 - 21 Mar 2024
Amount
Transportation, installation & commissioning of 5 Nos. pontoons 6.88 Ton Weight each of blocks in Turra main sump , Turra North Sump & Purewa bottom sump before and during monsoon as per instruction of Engineer In Charge.
Dismantling, transportation, stacking of 5 Nos. pontoons 6.88 Ton weight of 9 blocks in Turra main sump, Turra north sump & Purewa botton sump after monsoon 2024 as per instruction of Engineer In charge.
Installation of pump motor set/ alignment of motor, field switch, starter as per requirement including fixing of suction pipe, moving unit, priming, testing etc with Loading and unloading of pump motor set and its accessories for installation before, during and after monsoon 2024 as per instruction of Engineer Incharge. (Gases and welding electrode will be provided by NCL, If required)
Dismantling of pump motor set & other associated electrical equipments such as switch, starter etc as per requirement including suction pipe, moving unit, etc with Loading and unloading of pump motor set, starter, field switch and its accessories for placing at safe place during and after monsoon 2024 as per instruction of Engineer Incharge. (Gases and welding electrode will be provided by NCL, If required)
Total impact of GST for the purpose of CTC
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_315962.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .