Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
23 Feb 2023, 2:00 pmClosed
SE/MEDC/Mettur
O/o SE/MEDC/Mettur
works for effecting services in various schemes Koneripatty section in Edappady division
2023_EB_287810_1
EE/EDY/WC spec No.E.009/22-23
Open Tender
Electrical Works
Works
365 days
SE/MEDC/Mettur dam
EMD and documents as per BQR conditions
2 documents required · 2 mandatory
₹0
₹5,000
10 Mar 2023
10 Feb 2023
24 Feb 2023
10 Feb 2023
23 Feb 2023
10 Feb 2023
10 Feb 2023 - 23 Feb 2023
Amount
Work contract schedule
Excavation of pole pit upto 27" (8.0 m ) Pole by using JCB or manual
Excavation of pole pit above 8.0Mtr pole PSC/RCC/RSJ Pole by using JCB or manual
Excavation of stay pit 4.5' to 5' depth by using JCB or manual
Erection of PSC/RCC Pole upto 8.0m (27") by using crane or manual
Erection of PSC/RCC/Metal Poles above 8.0 Mtr by using crane or manual
Erection of Stay set complete
Fixing of HT V cross arms (all typs) / Channel cross arms / guarding Cross arm
Fixing of LT 3Ph cross arm
Fixing of LT 1Ph cross arm
Fixing of HT/LT TI Fittings
Fixing of HT Pin insulators 11 KV
Fixing of HT Strain Disc 11KV
Fixing of LT Pin insulators
Fixing of LT Shackle
Fixing of Aluminium Knob
Paving and stringing of 7/3.35 mm ACSR, 7/3.30mm AAAC
Paving and stringing of 7/2.59 mm ACSR, 7/2.59mm ACSR
Flat guarding including fixing of 2 nos cross arms
Earthing of pole with pin and cross arm including burying looping and binding.
ERECTION of TRANSFORMER STRUCTURE COMPLETE in all respects with wiring,Earthing,fixing of open type fuse units,HT/LT LAS and jumpering 3nos.Earth pits with collar including painting of metal parts,structure poles,fixing of top channel,seating channel,belting angle including concreting(Except erection of Transformer)
ERECTION of Single Pole Transformer structure complete in all respects with wiring,Earthing,fixing of open type fuse units,HT/LT LAS and jumpering 3nos.Earth pits with collar including painting of metal parts,structure poles,fixing of tapping channel,transformer bed structure including concreting(Except erection of Transformer)
Transport of Materials. Below 8 Kms.
Loading or unloading of line material
Transportation of Poles from road side to pole Pit including loading and unloading of poles by using JCB or manual upto 100m
Loading of poles upto 27'-0"
Unloading of poles upto 27'
loading of poles upto 30'/RSJ pole
Unloading of poles upto 30'/RSJ pole
Loading & unloading of Transformer above 100KVA and upto 200 KVA
Erection of New Transformer all capacities
Alteration of Back clamp
Alteration of Stay clamp
Drilling of hole in channel only 3/4" & 1" per hole
Cutting of channel
Re-sagging of ACSR 7/2.59mm/AAAC 2.50mm weasel and ACSR 7/2.11mm conductor
Dismandling of RCC/PSC pole 8.0mtr/7.5mtr
Dismandling of 'V' X arm,channel X arm,guarding X arm(all types)
Dismandling of LT 3 phase X arm
Dismandling of LT single phase X arm
Dismandling of HT/LT TI fitting
Dismandling of 11KV strain disc
Dismandling of 22KV pin insulator
Dismandling of LT shackle
Dismandling of LT pin insulator
Dismandling of Aluminium knob
Dismandling of stay set
Dismandling of ACSR 7/3.35mm conductor
Dismandling of ACSR 7/2.59mm/ 7/2.11mm conductor
Releasing and refixing of 3ph service wire
Releasing and refixing of 1ph service wire
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @ 3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .