| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.9 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹16.9 L+₹98,348 (6.19%)Rejected-AOC | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Krishnakumar L2 | KKS CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Earth Work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts including laying, spreading, levelling, sectioning breaking clods etc., including all incidental charges etc. complete as per standard specification.(For Foundations SS 20B ) | 110 | M3 | 300 ₹33,000 | 246 ₹27,060 Lowest |
| 2.00 | Providing Plain Cement concrete of mix 1:4:8 (One cement four sand eight aggregates) using 40mm ISS gauge size hard broken including cost conveyance of all materisl to site including labour charges, transporting and placing in postion including labour for mixing compacting, finishing and curring etc. including cost and conveyance of all materials and labour charges etc., complete as per standard specification | 14 | M3 | 5,200 ₹72,800 | 5,107 ₹71,498 Lowest |
| 3.00 | Supplying & Erecting RCC centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items (For all R.C.C Works )including cost and conveyance of all materials and labour charges etc., complete as per standard specification Column footing sides allround | 47 | M2 | 550 ₹25,850 | 494 ₹23,218 Lowest |
| 4.00 | b) Column | 188 | M2 | 1,300 ₹2,44,400 | 1,227 ₹2,30,676 Lowest |
| 5.00 | Supplying and Fabrication and placing in position of TMT bars for all RCC works with cost of binding wire and cost of cutting, bending ,tying in position including cost and conveyance of all materials and labour charges etc., complete as per standard specification. | 2,800 | Kg | 100 ₹2,80,000 | 89 ₹2,49,200 Lowest |
| 6.00 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - | 28 | M3 | 8,200 ₹2,29,600 | 8,111 ₹2,27,108 Lowest |
| 7.00 | Brick work in Cement Mortar in 1:5 ( One cement and Five Sand ) using best quality of Stock bricks 2nd class of size 9x 41/2 x 3 including all cost of materials and labour charges including Curing charges etc., complete as per Standard Specification. | 63 | M3 | 7,200 ₹4,53,600 | 7,180 ₹4,52,340 Lowest |
| 8.00 | Supplying and fixing MS L Angle directed by the departmental officers inclusive of cost of MS grill and labour charges including one coat of red oxide and fixing in position etc. complete (as per schedule of rates) as per standard specification | 100 | Kg | 150 ₹15,000 | 105 ₹10,500 Lowest |
| 9.00 | Plastering c.m 1:5 (one cement and five sand) mix to a thick of 12mm using clean screened sand and including the cost of curing for 15 days from the completion of work and surface should free from undulations and including the cost of preparing the surface for plastering and protecting from other damages till setting of mortar etc complete complying as per MORTH Specifications. TNDSS No.56 & 57 | 571 | M2 | 290 ₹1,65,590 | 269 ₹1,53,599 Lowest |
| 10.00 | Painting two coats with best-approved quality Colour Enamel paint for New Iron Works including cost and conveyance of enamel paint etc., Complete. | 4 | M2 | 180 ₹720 | 147 ₹588 Lowest |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
3 Oct 2025, 3:00 pmClosed
Executive Officer Madathukulam Town Panchayat
Executive Officer Madathukulam Town Panchayat
Madathukulam Town Panchayat Construction of compound wall at ward no 1 Krishnapuram 1 lakh liter OHT ward no 16 Agathiyar Nagar 3 lakh liter OHT
2025_DTP_609726_1
584/2025
Open Tender
Civil Works
Works
Madathukulam Town Panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹40,000
Yes
17 Oct 2025
27 Sept 2025
3 Oct 2025
27 Sept 2025
3 Oct 2025
27 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .