Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.9 LAccepted-AOC | ₹48.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹49.9 LRejected-Finance NEW MAJRI COLLIERY DAFAI NO1 POST SHIVJI NAGAR TAH BHADRAWATI DIST CHANDRAPUR 442503 | BHADRAWATI | CHANDRAPUR | MAHARASHTRA | 442503 | ₹49.9 L | L2 | Rejected-Finance L2 |
| 3 | L3₹50.6 LRejected-Finance | ₹50.6 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | MD. HALIM L2 | MD. KALIM L1 | ANKIT KUMAR MISHRA L3 |
|---|---|---|---|---|---|---|
| 1.00Construction of Eight (08) numbers Sectionalisation stopping in R-VI seam of Khottadih Colliery, Pandaveswar Area. (Inclusive of EPF/CMPF) | ||||||
| 1.01 | Preparation of site Cleaning of Debris | 71.68 | Cubic meter | 668.46 ₹47,915.21 | 655.35 ₹46,975.49 | 678.29 ₹48,619.83 |
| 1.02 | Floor cutting in soft stone by hand | 18.24 | Cubic meter | 4,666.32 ₹85,113.68 | 4,574.82 ₹83,444.72 | 4,734.94 ₹86,365.31 |
| 1.03 | Recess cutting in coal by hand | 110.4 | Cubic meter | 1,653.88 ₹1,82,588.35 | 1,621.45 ₹1,79,008.08 | 1,678.2 ₹1,85,273.28 |
| 1.04 | P.B. Work(1:8) by c.b bricks | 267.52 | Cubic meter | 6,989.64 ₹18,69,868.49 | 6,852.59 ₹18,33,204.88 | 7,092.43 ₹18,97,366.87 |
| 1.05 | Plastering (1:6) in both sides | 368.16 | Square Meter | 385.79 ₹1,42,032.45 | 378.23 ₹1,39,249.16 | 391.47 ₹1,44,123.6 |
| 1.06 | Loading and unloading materials from Surface to U.G | 540 | Tubs | 738.16 ₹3,98,606.4 | 723.69 ₹3,90,792.6 | 749.02 ₹4,04,470.8 |
| 1.07 | Mechanically transport in Tub (1500m above) | 540 | Tubs | 932.27 ₹5,03,425.8 | 913.99 ₹4,93,554.6 | 945.98 ₹5,10,829.2 |
| 1.08 | Manually pushing in Tub(500m-550m) | 540 | Tubs | 1,243.03 ₹6,71,236.2 | 1,218.66 ₹6,58,076.4 | 1,261.31 ₹6,81,107.4 |
| 1.09 | Lead for carrying Materials at a distance of (151-165m) | 540 | Tubs | 601.12 ₹3,24,604.8 | 589.33 ₹3,18,238.2 | 609.96 ₹3,29,378.4 |
Tender Value
₹48.9 L
EMD Value
₹61,200
Closing Date
22 Jan 2026, 9:00 amClosed
Area Survey Officer
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Construction of Eight (08) numbers Sectionalisation stopping in R-VI seam of Khottadih Colliery, Pandaveswar Area
2026_ECL_351060_1
GM/PND/Sur/Ten/25-26/121/299 Dated 09.01.2026
Open Tender
Civil Works - Others
90 days
Khottadih Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹61,200
13 Feb 2026
12 Jan 2026
23 Jan 2026
12 Jan 2026
22 Jan 2026
12 Jan 2026
12 Jan 2026 - 15 Jan 2026
Construction of Eight (08) numbers Sectionalisation stopping in R-VI seam of Khottadih Colliery, Pandaveswar Area. (Inclusive of EPF/CMPF)
Preparation of site Cleaning of Debris
Floor cutting in soft stone by hand
Recess cutting in coal by hand
P.B. Work(1:8) by c.b bricks
Plastering (1:6) in both sides
Loading and unloading materials from Surface to U.G
Mechanically transport in Tub (1500m above)
Manually pushing in Tub(500m-550m)
Lead for carrying Materials at a distance of (151-165m)
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.62 MB
BOQ_363805.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid