Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.1 LAccepted-AOC GROUND FLOOR F 11 PHASE II MAYAPURI WEST DELHI DELHI 110064 | DELHI | WEST DELHI | DELHI | 110064 | L1 | Accepted-AOC L-1 | |
| 2 | L2₹27.4 L+₹6.3 L (30.1%)Rejected-Finance | L2 | Rejected-Finance being other than lowest | |
| 3 | L3₹31.4 L+₹10.3 L (48.9%)Rejected-Finance | L3 | Rejected-Finance being other than lowest | |
| 4 | Rejected-Technical | - | Rejected-Technical Rejected |
Tender Value
Refer Docs
EMD Value
₹70,440
Closing Date
6 Mar 2021, 6:00 pmClosed
GE Jammu
GE Jammu c/o 56 APO Pin-180003
MANNING AND OPERATION OF WATER SUPPLY INSTALLATION AT DAMANA UNDER GE JAMMU
2021_MES_419622_1
GEJC-63/2020-21
Open Tender
Electrical and Maintenance Works
Item Rate
335 days
AoR of GE Jammu
Please refer Tender Documents
8 documents required · 8 mandatory
₹500
GE Jammu
₹70,440
Yes
28 Jul 2021
8 Feb 2021
8 Mar 2021
8 Feb 2021
6 Mar 2021
22 Feb 2021
Amount
Manning and operation of Water Supply Installation Tube Well No 02 (URI Line) daily round the clock in 3 shifts ( 8 hours for each shift) by employing One Operator in each shift. The installation is consisting of the following Plants and Equipments:- (a) VT motor with pumpset 20 HP - 1 No (b) LT panel with accessories - 1 No (c) Changeover switch - 1 No (d) Manual/Automatic Starter - 1 No (e) Servo Voltage Stabilizer 30 KVA -1 No (f) Sluice valves of different sizes - 01 Lot (g) Chloronome Plants -1 No (h) DG set 45 KVA - 1 No
Manning and operation of Water Supply Installation Tube Well No - 07 (Rajouri Line) daily round the clock in 3 shifts (8 hours for each shift) by employing One Operator in each shift. The installation is consisting of the following Plants and Equipments:- (a) VT motor with pumpset 20 HP - 1 No (b) LT panel with accessories - 1 No (c) Changeover switch - 1 No (d) Manual/Automatic Starter - 1 No (e) Servo Voltage Stabilizer 30 KVA -1 No (f) Sluice valves of different sizes - 01 Lot (g) Chloronome Plants -1 No (h) DG set 45 KVA - 1 No
Manning and operation of Water Supply Installation Tube Well No 04 & 08 (Bikaner line) daily round the clock in 3 shifts (8 hours for each shift) by employing One Operator in each shift. The installation is consisting of the following Plants and Equipments:- (a) VT motor with pumpset 20/50 HP - 02 Nos (b) LT panel with accessories - 02 Nos (c) Changeover switch - 01 No (d) Manual/Automatic Starter - 02 Nos (e) Servo Voltage Stabilizer 50 /75 KVA -01 No (f) Sluice valves of different sizes - 02 Lots (g) Chloronome Plants -02 Nos (h) DG set 110 KVA - 01 Nos
Manning and operation of Water Supply Installation Tube Well at Raipur lines daily round the clock in 3 shifts ( 8 hours for each shift) by employing One Operator in each shift. The installation is consisting of the following Plants and Equipments:- (a) Submersible motor with pumpset 20 HP - 01 No (b) LT panel with accessories - 01 No (c) Changeover switch - 01 No (d) Manual/Automatic Starter - 01 No (e) Servo Voltage Stabilizer 45 KVA -01 No (f) Sluice valves of different sizes - 01 Lot (g) Chloronome Plants/ Ionisation plant -01 No (h) DG set 110 KVA - 01 No.
Manning and operation of Water Supply Installation Tube Well at Poonch Line lines daily round the clock in 3 shifts ( 8 hours for each shift) by employing One Operator in each shift. The installation is consisting of the following Plants and Equipments:- (a) Submersible motor with pumpset 20 HP - 01 No (b) LT panel with accessories - 01 No (c) Changeover switch - 01 No (d) Manual/Automatic Starter - 01 No (e) Servo Voltage Stabilizer 50 KVA -01 No (f) Sluice valves of different sizes - 01 Lot (g) Chloronome Plants/ Ionisation plant -01 No (h) DG set 63 KVA - 01 No.
Manning and operation of Water Supply Installation Tube Well at APS Damana daily round the clock in 3 shifts (8 hours for each shift) by employing One Operator in each shift. The installation is consisting of the following Plants and Equipments:- (a) Submersible motor with pumpset 20 HP - 01 No (b) LT panel with accessories - 01 No (c) Changeover switch - 01 No (d) Manual/Automatic Starter - 01 No (e) Servo Voltage Stabilizer 50 KVA -01 No (f) Sluice valves of different sizes - 01 Lot (g) Chloronome Plants/ Ionisation plant -01 No (h) DG set 63 KVA - 01 No.
Note : (a) The operator shall be ITI qualified from Govt recognized institute or Technician with minimum 05 years experience in the related field. (b) A recovery double the salary per day of employee will be penalised / deducted from the RAR for non engagement of person due to any reason from the Contractor's dues.
The contractor has to supply uniform to their employees for wearing during the working hours. The unit rate is deemed to include for the uniform. The uniform pattern shall be decided by the Engr-in-Charge.
The rate quoted is deemed to be inclusive of providing mobile communication system to the operator detailed so that feed back can be obtained.
The safety precautions for the operator will be the responsibility of the contractor and the unit rate is deemed to include for the safety equipments and the T & P required for routine maintenance of the plant.
Contractor has to produce life insurance cover of minimum Rs 5.00 Lakh of their employee/wages employed under this contract along with claimed payment. No Payment shall be made to the contractor without the documentary evidence. The contractor quoted rates shall be deemed to include for the same.
The general cleaniness of the area in and around the installation and the plants installed will be the responsibility of the contractor.
The contractor will engage his labour for collection of POL from MES store yard and shifting to the installations to be run under it.
The cost of maintenance of documents, installation charts and daily records i.e log sheet and attendance register as clarified under relevant PS shall deemed to be included in rates quoted for the above items.
Periodical/ Routine maintenance of the plant will be responsibility of the contractor and the rate there off shall be deemed to be included in the quoted rate.
The Wages to the staff employed will be paid in the Aadhaar linked bank account and the monthly statement be deposited in the office before release of RAR.
vishesh engineers
M/S VIDYA ENTERPRISES
Bidder Name
Amit Enterprises
M/S VIDYA ENTERPRISES
vishesh engineers
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .