Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64,000Accepted-Finance HOUSING COLONY UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L1 | Accepted-Finance lowest | |
| 2 | L2₹71,500+₹7,500 (11.7%)Rejected-Finance MAIN CHOWK TALAB TILLO JAMMU | ANANTNAG | JAMMU AND KASHMIR | 192101 | L2 | Rejected-Finance not lowest | |
| 3 | L3₹71,900+₹7,900 (12.3%)Rejected-Finance 110 MINI SHOPPING COMPLEX NEHRU MARKET JAMMU | L3 | Rejected-Finance not lowest | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Rishabh Electricals and Mechanical Works L3 | M/S GANPATI ELECTRICAL AND MECHNICAL WORKS L2 | M.S J K HYDRAULIC ENGGG AND FABRICATOR WORKS L1 |
|---|---|---|---|---|---|---|
| 1.00Replacement of damaged coupling set of 4 Cusec 30 mtr HC pump of unit no. 3 & minor repairs to 250 KVA electric transformer at LIS Didwara. | ||||||
| 1.01 | Replacement of damaged coupling set of 4 Cusec 30 mtr HC pump of unit no 3 by way of extracting old damaged coupling set, providing and fabrication of new coupling set as per sample and size of motor and pump shaft and fitting the same after proper alignment of both shafts. Providing and fitting of graphite packing of suitable size. Minor repairs to 250KVA electric transformer at site by way of disconnecting the incoming (HT) electrical connection and outgoing electrical connection i.e. LT connection. Then dismantling the top cover of the transformer by unscrewing the required nuts and bolts to have access for extraction of LT bushes rods. P/F of 04 nos LT bush rod of appropriate rating/ size along with insulators and required nut and bolts. Topping up of new transformer oil 175 liters in the transformer. Refitting of the top cover of transformer by providing and fitting of new gasket sheet. Testing the continuity of each phase and secure all connection. Giving all the incoming and outgoing electrical connection after cutting the burnt ends of the cable and p/f of new thimbles of appropriate rating/ size and insulation complete. Complete job includes cost of material, labour charge, hire charges of tools and tackles, carriages of material at site at LIS Didwara. | 1 | Job | 71,900 ₹71,900 | 71,500 ₹71,500 | 64,000 ₹64,000 Lowest |
| 1.02 | Rebate on Old Parts | 1 | Job | -1,400 ₹-1,400 | -1,430 ₹-1,430 | -1,280 ₹-1,280 |
Tender Value
₹72,500
EMD Value
₹1,450
Closing Date
10 Jul 2025, 2:00 pmClosed
XEN MID JAMMU
MID JAMMU
Replacement of damaged coupling set of 4 Cusec 30 mtr HC pump of unit no. 3 and minor repairs to 250 KVA electric transformer at LIS Didwara.
2025_IFC_279207_1
MID/J/e-NIT/2025-26/16
Open Tender
Repair and Maintenance Works
Item Wise
7 days
didwara
as per eNIT
8 documents required · 8 mandatory
₹200
Executive Engineer MID JAMMU
₹1,450
17 Nov 2025
19 Jun 2025
11 Jul 2025
19 Jun 2025
10 Jul 2025
20 Jun 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .