Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 CrAdmitted-Finance | -24.27% | ₹2.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.0 Cr+₹20.6 L (7.49%)Admitted-Finance ALIPURDUAR | ALIPURDUAR | WEST BENGAL | 735204 | -18.60% | ₹3.0 Cr+₹20.6 L (7.49%) | L2 | Admitted-Finance |
| 3 | L3₹3.0 Cr+₹20.9 L (7.61%)Admitted-Finance | -18.51% | ₹3.0 Cr+₹20.9 L (7.61%) | L3 | Admitted-Finance |
| 4 | L4₹3.0 Cr+₹26.9 L (9.78%)Admitted-Finance | -16.86% | ₹3.0 Cr+₹26.9 L (9.78%) | L4 | Admitted-Finance |
| 5 | L5₹3.1 Cr+₹39.2 L (14.2%)Admitted-Finance | -13.50% | ₹3.1 Cr+₹39.2 L (14.2%) | L5 | Admitted-Finance |
Tender Value
₹3.6 Cr
EMD Value
₹7.3 L
Closing Date
24 Jun 2026, 6:00 pmClosed
EE RMC Div.-II, CAD Chambal, Anta
EE RMC Div.-II, CAD Chambal, Anta
Construction of Molki VRB at km 75.45 of RMC CAD Anta.
2026_CADKO_562648_1
NIT No. 02/2026-27 (No 808)
Open Tender
Civil Works
Percentage
730 days
Anta
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
EE RMC Div.-II, CAD Chambal, Anta
₹7.3 L
Yes
13 Jul 2026
26 May 2026
25 Jun 2026
27 May 2026
24 Jun 2026
27 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation including loading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect in Hard/dense soil. | 6,397.9 | Cum | 79 | ₹5,05,434.1 |
| 2 | Earthwork in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction)and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density within itial lift of1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. (a) With initial lead of 250 m | 3,375 | Cum | 107 | ₹3,61,125 |
| 3 | Compaction of earth or highly weathered strata By mechanical equipment such as sheep foot roller/pneumatic tyred roller/vibro compactor /vibro sheep foot compactor required as per site condition to obtain dry density of (ii) at least 98% of Standard Proctor's density | 3,375 | Cum | 36 | ₹1,21,500 |
| 4 | Wateringof earth including cost of carriage of water when sourceof water is (a) up to 1 Km | 3,375 | Cum | 11 | ₹37,125 |
| 5 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm | 507.79 | Cum | 4,654 | ₹23,63,254.66 |
| 6 | Providing and Laying in position of Cement concrete Design mix M-20 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone upto 20mm. | 3,174.84 | Cum | 5,744 | ₹1,82,36,280.96 |
| 7 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Retaining wall, counterfort, abutment, wing walls up stream or down stream slope facings of dams and open faces of construction joints etc. | 1,312.38 | Sqm | 220 | ₹2,88,723.6 |
| 8 | Providing and Laying in position of Cement Concrete Design mix M-30 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; (For mix design Cement content considered 428 kg/ cum of concrete) (d) 20 mm | 443.74 | Cum | 4,844 | ₹21,49,476.56 |
| 9 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawingincluding cost of binding wire and all leads and lifts using.Tor or ribbed bars(IS :1786-1985) | 1,34,217.66 | Kg | 78 | ₹1,04,68,977.48 |
| 10 | Construction of un-reinforced , plain cement concrete pavement M30 (Grade), thickness as per design, over a prepared sub base, with 43/53 grade cement as per Clause 602, coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a in fully automatic Batching Plant and transported to site in transit mixer for having continuous agitated mixer, manufactured as per approved mix design including pumping of R.M.C. from transit mixer to site of laying , with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge laid with a Fixed Form Paver (laying and fixing of 150 micron thick polythene Film and finished in continuous operation including provision of contraction and expansion, construction joints, applying | 135 | Cum | 5,160 | ₹6,96,600 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
TechnicalBid.pdf
Tender Documents • 0.86 MB
FinancialBid.pdf
Tender Documents • 4.09 MB
BOQ_1001211.xls
BOQ • 0.25 MB
Corrigendum.pdf
PDF • 0.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .