Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance | -36.00% | ₹1.9 L | L1 | Admitted-Finance |
| 2 | L2₹2.1 LAdmitted-Finance | -30.79% | ₹2.1 L | L2 | Admitted-Finance |
| 3 | L3₹2.3 LAdmitted-Finance | -21.80% | ₹2.3 L | L3 | Admitted-Finance |
| 4 | L4₹2.9 LAdmitted-Finance | -3.00% | ₹2.9 L | L4 | Admitted-Finance |
| 5 | L5₹3.0 LAdmitted-Finance | -1.11% | ₹3.0 L | L5 | Admitted-Finance |
| Rank | Bidder | Quote | Total Amount |
|---|---|---|---|
| L1 | KASHIF KAZMI Bid ID 2704154 | 36% below | ₹1,92,003.32 |
| L3 | MOHD ISMAEEL Bid ID 2703360 | 21.8% below | ₹2,34,604.05 |
| L6 | AHMED SHAH Bid ID 2703130 | 5% above | ₹3,15,005.44 |
| L5 | WAQAR AHMED Bid ID 2703179 | 1.11% below | ₹2,96,675.12 |
| L4 | MOHD JABBAR Bid ID 2703875 | 3% below | ₹2,91,005.02 |
| L2 | Zulafqar AHmed Contractor Bid ID 2703159 | 30.79% below | ₹2,07,633.59 |
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
20 Jan 2026, 6:55 pmClosed
Executive Engineer REW Division Poonch
Executive Engineer REW Division Poonch
Please refer to Boq
2026_RDPR_300741_8
e-NIT 242 of REW Poonch 2025-26 Date 15-01-2026
Open Tender
Civil Works
30 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Division Poonch
₹6,000
27 Jan 2026
15 Jan 2026
21 Jan 2026
15 Jan 2026
20 Jan 2026
15 Jan 2026
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :
Dry Stone Pitching inluding cost of Stones
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6graded stone aggregate 20 mm nominal size) with 30% stones
Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone
Centering & Shuttering :- Foundation
Carriage of Sand Agg. for 25 Kmt. By MT & 300 Mtr. By H/l
Carriage of stone for 10 KM by MT & 300 Mtr by HL
Add the Cost of CIB
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
BOQ_975529.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid