Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAdmitted-Finance | ₹4.7 L | L1 | Admitted-Finance |
| 2 | L2₹4.8 L+₹9,461.60 (2.00%)Admitted-Finance VILL P O AMJAI BARDHAMAN BARDHAMAN 713203 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713203 | ₹4.8 L+₹9,461.60 (2.00%) | L2 | Admitted-Finance |
| 3 | L3₹4.9 L+₹18,923.20 (4.00%)Admitted-Finance | ₹4.9 L+₹18,923.20 (4.00%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K R ENTERPRISE L1 | F.R. ENTERPRISE L2 | N.K. ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00Part A : Heightening, proper grading & alligning of foot stool structure of 1200mm -2L conveyor from 3D to 11D for a length of 300mtr and 1200mm -2L tandem belt conveyor from 15D to 23D for a length of 300mtr after necessary cleaning of debris and fallen coal near foot stool at UG of MIC unit of J.P.Colly.COLLY | ||||||
| 1.01 | Cleaning of fallen coal and debris under conveyor belt structure near foot stool for heightening of structure from 3D to11D for a length of 300mtr of 1200mm -2L belt conveyo | 1 | WORK | 29,650 ₹29,650 Lowest | 30,243 ₹30,243 | 30,836 ₹30,836 |
| 1.02 | Heightening of structure at both side with the help of chain pulley block and fitting of channel with nut and bolt after necessary gas cutting during maintenance time of belt conveyor and proper alligning and grading | 1 | WORK | 1,92,414 ₹1,92,414 Lowest | 1,96,262.28 ₹1,96,262.28 | 2,00,110.56 ₹2,00,110.56 |
| 1.03 | Cleaning of fallen coal and debris under conveyor belt structure near foot stool for heightening of structure from 15D to 23D for a length of 300mtr of 1200mm -2L tandem belt conveyor | 1 | WORK | 29,650 ₹29,650 Lowest | 30,243 ₹30,243 | 30,836 ₹30,836 |
| 1.04 | Heightening of structure at both side with the help of chain pulley block and fitting of channel with nut and bolt after necessary gas cutting during maintenance time of belt conveyor and proper alligning and grading | 1 | WORK | 2,00,266 ₹2,00,266 Lowest | 2,04,271.32 ₹2,04,271.32 | 2,08,276.64 ₹2,08,276.64 |
| 1.05 | Supply of MS nut & bolt 5/8 x 2" | 100 | KG | 125 ₹12,500 Lowest | 127.5 ₹12,750 | 130 ₹13,000 |
| 1.06 | Supply of DA cylinder | 2 | Nos | 3,400 ₹6,800 Lowest | 3,468 ₹6,936 | 3,536 ₹7,072 |
| 1.07 | Supply of oxygen cylinder | 4 | Nos | 450 ₹1,800 Lowest | 459 ₹1,836 | 468 ₹1,872 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹5.6 L
EMD Value
₹7,000
Closing Date
3 Apr 2026, 11:00 amClosed
AREA ENGINEER ENM
Office of the General Manager, Jhanjra Area, ECL
Heightening, proper grading n alligning of foot stool structure of 1200mm -2L conveyor from 3D to 11D for a length of 300mtr and 1200mm -2L tandem belt conveyor from 15D to 23D for a length of 300mtr after necessary cleaning of debris and fallen co
2026_ECL_357328_1
ECL/GM/JNR/EnM/A2/25-26/145 dated 18.03.2026
Open Tender
Miscellaneous Works
Item Rate
21 days
JHANJRA
Please refer Tender documents.
4 documents required · 4 mandatory
₹7,000
13 Apr 2026
23 Mar 2026
4 Apr 2026
23 Mar 2026
3 Apr 2026
24 Mar 2026
23 Mar 2026 - 30 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Part A : Heightening, proper grading & alligning of foot stool structure of 1200mm -2L conveyor from 3D to 11D for a length of 300mtr and 1200mm -2L tandem belt conveyor from 15D to 23D for a length of 300mtr after necessary cleaning of debris and fallen coal near foot stool at UG of MIC unit of J.P.Colly.COLLY | |||||
| 1.01 | Cleaning of fallen coal and debris under conveyor belt structure near foot stool for heightening of structure from 3D to11D for a length of 300mtr of 1200mm -2L belt conveyo | - | WORK | - | - |
| 1.02 | Heightening of structure at both side with the help of chain pulley block and fitting of channel with nut and bolt after necessary gas cutting during maintenance time of belt conveyor and proper alligning and grading | - | WORK | - | - |
| 1.03 | Cleaning of fallen coal and debris under conveyor belt structure near foot stool for heightening of structure from 15D to 23D for a length of 300mtr of 1200mm -2L tandem belt conveyor | - | WORK | - | - |
| 1.04 | Heightening of structure at both side with the help of chain pulley block and fitting of channel with nut and bolt after necessary gas cutting during maintenance time of belt conveyor and proper alligning and grading | - | WORK | - | - |
| 1.05 | Supply of MS nut & bolt 5/8 x 2" | - | KG | - | - |
| 1.06 | Supply of DA cylinder | - | Nos | - | - |
| 1.07 | Supply of oxygen cylinder | - | Nos | - | - |
| 2Total impact of GST for the purpose of CTC | |||||
stage.html
html • 0.03 MB
techsummary_370191.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.48 MB
Tendernotice_2.pdf
PDF • 1.20 MB
BOQ_370191.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .