| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-AOC | ₹7.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.1 LRejected-AOC | ₹8.1 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | R.Aravind | SRI DURGA CONTRACTORS |
|---|---|---|---|---|---|
| 1.00 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification. | 159 | cum | 36,570 ₹43,152.60 | 35,775 ₹42,214.50 |
| 2.00 | Cement Concrete 1:4:8 (One Cement, Four sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 23 | Cum | 1,26,500 ₹1.5 L | 1,24,177 ₹1.5 L |
| 3.00Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | |||||
| 3.01 | Culvert Side Wall | 288 | sqm | 2,01,600 ₹2.4 L | 1,93,824 ₹2.3 L |
| 3.02 | Culvert Slab Side | 10 | Sqm | 12,000 ₹14,160 | 11,100 ₹13,098 |
| 4.00 | Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 50 | Cum | 3,75,000 ₹4.4 L | 3,71,000 ₹4.4 L |
| 5.00 | Supplying, fabricating, and placing in position of mild steel for all reinforced cement concrete works including cost and conveyance of steel and binding wire and all other labour charges for cutting bending tying grills charges for cutting, bending tying grills, straightening welding charges etc, complete complying with standard specification. | 300 | Kg | 28,500 ₹33,630 | 27,900 ₹32,922 |
| 6.00 | Reinforced Cement concrete 1:1.5 :3 (one cement,one and half sand & three course aggregate )using 20mm ,gauge hand broken/ and broken granite stone for all RCC items of works excluding centeringshuttering and cost of reinforcement grill ,out including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 3 | Cum | 27,600 ₹32,568 | 27,300 ₹32,214 |
| 7.00 | Supply and Delivery and Fixing of 0.9 x 0.9 m Size of Manhole in rcc works wherever necessary as directed by departmental officer etc., complete. | 1 | Nos | 3,300 ₹3,894 | 3,240 ₹3,823.20 |
Tender Value
₹9.9 L
EMD Value
₹9,900
Closing Date
19 Jan 2026, 3:00 pmClosed
TCMC Zone-2
New Colony 3rd Main Road,Chromphet
TCMC- Construction of Culvert and SWD at Bhavani Nagar 2nd Street in Ward No.20,Tambaram City Municipal Corporation ,Zone II
2026_DMA_643414_8
171/2025/E1
Open Tender
Civil Works
90 days
TCMC-Zone-2
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,900
21 May 2026
14 Jan 2026
19 Jan 2026
14 Jan 2026
19 Jan 2026
14 Jan 2026
Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification.
Cement Concrete 1:4:8 (One Cement, Four sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification
Culvert Side Wall
Culvert Slab Side
Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Supplying, fabricating, and placing in position of mild steel for all reinforced cement concrete works including cost and conveyance of steel and binding wire and all other labour charges for cutting bending tying grills charges for cutting, bending tying grills, straightening welding charges etc, complete complying with standard specification.
Reinforced Cement concrete 1:1.5 :3 (one cement,one and half sand & three course aggregate )using 20mm ,gauge hand broken/ and broken granite stone for all RCC items of works excluding centeringshuttering and cost of reinforcement grill ,out including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete.
Supply and Delivery and Fixing of 0.9 x 0.9 m Size of Manhole in rcc works wherever necessary as directed by departmental officer etc., complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.70 MB
BOQ_771050.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid