Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC 638 111 | TIRUPPUR | TAMIL NADU | 638111 | L1 | Accepted-AOC BELOW THE ESTIMATE RATE | |
| 2 | L2₹1.7 L+₹6,277.60 (3.78%)Rejected-AOC | L2 | Rejected-AOC ABOVE THE ESTIMATE RATE |
| Sl No | Description | Qty | Unit | R.Vadivel H1 | SUBBIAH NAICKER SUBBIAH H2 |
|---|---|---|---|---|---|
| 1.00 | Supply and fixing of RCC precast slab in cement concrete 1:1.5:3 mix (One cement one and half Crushed Stone Sand and three aggregate) using 20 mm ISS metal including cost of moulding charges mixing, laying and curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification but excluding cost of reinforcement | 70 | 1 M2 (One Square Meter) | 1,770 ₹1,23,900 | 1,724 ₹1,20,680 Lowest |
| 2.00 | Transportation Charges for precast slab to site,, fuel charges, loading and unloading charges and all labour charges etc complete.., | 100 | 1 No (Each) | 220 ₹22,000 | 199 ₹19,900 Lowest |
| 3.00 | Goods and Service Tax (G.S.T -18%) | 1 | 1 No (Each) | 26,262 ₹26,262 | 25,304.4 ₹25,304.4 Lowest |
Tender Value
₹1.7 L
EMD Value
₹1,700
Closing Date
5 Aug 2025, 3:00 pmClosed
THE MUNICIPAL COMMISSIONER
THE MUNICIPAL COMMISSIONER, VELLAKOVIL MUNICIPALITY, 210, TC MAIN ROAD, VELLAKOVIL
Supply and fixing of RCC precast slab at Town Limit Public Fountain in Vellakovil Municipality
2025_MAWS_587335_1
1399/2025/E1
Open Tender
Civil Works - Water Works
Works
30 days
VELLAKOVIL
MISCELLANEOUS WORKS
2 documents required · 2 mandatory
₹0
₹1,700
29 Sept 2025
31 Jul 2025
5 Aug 2025
31 Jul 2025
5 Aug 2025
31 Jul 2025
31 Jul 2025 - 5 Aug 2025
Amount
Supply and fixing of RCC precast slab in cement concrete 1:1.5:3 mix (One cement one and half Crushed Stone Sand and three aggregate) using 20 mm ISS metal including cost of moulding charges mixing, laying and curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification but excluding cost of reinforcement
Transportation Charges for precast slab to site,, fuel charges, loading and unloading charges and all labour charges etc complete..,
Goods and Service Tax (G.S.T -18%)
SUBBIAH NAICKER SUBBIAH (BID ID -1420607)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_701586.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .