Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 CrAccepted-AOC HOUSE NO 16 WARD NO 4 JORHAT ASSAM | JORHAT | ASSAM | 785001 | ₹10.7 Cr Quoted ₹13.0 Cr | L1 | Accepted-AOC AWARDED |
| 2 | L2₹13.0 CrRejected-AOC | ₹13.0 Cr | L2 | Rejected-AOC Not Qualified for AOC |
| 3 | Rejected-Technical B B ROAD BARPETA ASSAM | BARPETA | ASSAM | 781301 | - | - | Rejected-Technical Technically Non Responsive |
Tender Value
₹14.5 Cr
EMD Value
₹28.9 L
Closing Date
26 Feb 2024, 2:00 pmClosed
Chief Engineer Water Resources Department
O/O Chief Engineer Water Resources Department, Basistha, Guwahati 29
Flood Prevention of Pahumara River in Bajali District (Ph - II).
2024_DoWR_36445_1
BAJALI/2023-24/NIDA/I
Open Tender
Civil Works
730 days
BAJALI
Please refer Tender documents.
2 documents required · 2 mandatory
₹20,000
₹28.9 L
Yes
16 Jan 2025
19 Feb 2024
26 Feb 2024
19 Feb 2024
26 Feb 2024
21 Feb 2024
Amount
Supply of geo-textile Tube (Mega containers) of fill height of 2.5 m and 25 m length made of geo-textile with minimum properties as mentioned below. i. Tensile strength of geo-textile materials > 200kN/m ii. O95 (pore size) of the geo-textile materials < 180 microns. iii. Seam strength > 70% of the material tensile strength. iv. Elongation of the material at the ultimate tensile strength should not be more than 20% v. CBR Burst Strength > 10.5 vi. Abrasion resistance (BAW Rotating Drum) >75% of strength retained. vii. UV Resistance (ASTMD4355-500Hrs) > 80% of strength retained. viii. The geo-textile mega containers must resist the pressure created by stacking the tubes in 3:2:1 manner.
Filling of geotubes (25m long and 2.5m filled ht.) with sand by using mud pump as per drawing and technical specification, binding the tube with 9mm nylon rope to jati bamboo pegs of length 2m placed 2.5m c/c along both sides of the tube and at both ends to keep the tube in position during filling, as specified and directed including all loading, unloading and handling charges and local carriage upto a distance of 250M, etc., complete as directed
Earth work in embankment by mechanical means by truck carriage in ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and stacking in regular measurable stacks at suitable places including clearing debris, breaking clods up to 4 cm cube, excluding payment of forest royalty if any, etc. (12.50 % deduction will be made from measured quantities on account of shrinkage).
Spreading of earth stacks over the crest and slope of embankment and places as directed in uniform layer of 22 cm. thick including breaking clods, dressing, ramming etc. complete where necessary including dressing of the embankment, etc. complete as directed.
H S ENGINEERS AND ASSOCIATES
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid