Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.0 LAccepted-AOC SCF 15 HUDA COMPLEX 184 NEW IDC 124001 | ROHTAK | HARYANA | 124001 | ₹47.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹47.9 L+₹91,776 (1.95%)Rejected-AOC AWFIS SPACE SOLUTIONS GESCO 70 THE GREAT EASTERN CENTRE NEHRU PLACE BEHIND IFCI TOWER NEW DELHI SOUTH DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | ₹47.9 L+₹91,776 (1.95%) | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical FRONT PORTION BA 11 SHALIMAR BAGH DELHI NORTH DELHI DELHI NORTH WEST DELHI DELHI 110088 INDIA | NORTH DELHI | DELHI | 110088 | - | - | Rejected-Technical Not Eligible |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Eligible |
| 5 | Rejected-Technical 11 E 379 11 PUL PEHLL 110044 | SOUTH EAST DELHI | DELHI | 110044 | - | - | Rejected-Technical Not Eligible |
| Sl No | Description | Qty | Unit | Highlight Associates and Contractors L1 | Chakr Innovation Private Limited L2 |
|---|---|---|---|---|---|
| 1.00 | Supplying installation, testing and commissioning of retrofit Emission control device on existing 750 KVA DG set at Sec-87 Gurugram University ,Gurugram to reduce Particulate Matter (PM),Hydrocarbon and Carbon Monoxide emission by at least 70%.
Adhering to this,
Device should be ‘Type Approved’ as per the System and Procedure of Central Pollution Control Board for Emission Compliance Testing of Retro-fit Emission Control Devices (RECD) For Diesel Power Generating Set Engines, Dated 01/02/2022, wide Pollution Control Series PCLS/12/2021-22
Adhering to this,
RECD to be ‘Type Approved’ for equivalent kVA rating from any one of the four Central Pollution Control Board, Govt, of India, recognized/approved test agencies / laboratories as given below:
(a) Automotive Research Association of India (ARAI, Pune)
(b) International Centre for Automotive Testing (ICAT, Manesar)
(c) Indian Institute of Petroleum (IIP, Dehradun)
(d) Vehicle Research Development Establishment (VRDE, Ahmednagar)
ATC:
• RECD should not be consumed additional electricity / power either from main supply or DG set to operate. No extra electricity or power would be provided to run the RECD
• RECD to be installed on the top of the DG set, with available space. No extra space to install RECD will be provided around DG set considering constraint of the space and its coast.
• RECD should not accumulate any soot, during the emission control process / device operation nor should there be any requirement for the disposal of soot.
• IoT:
The RECD device provided by the seller should be equipped with a remote Data Monitoring system certified by ICAT/ ARAI providing essential information recorded at every 15 minutes, including but not limited to:
? Energy consumption
? Running hours
? Warnings related to ECD diagnosis for the following conditions:
• Complete loss of particulate capture function
• Removal of the ECD system
• Failure of the ECD system
• Detection of exhaust bypass, temporary or permanent, as part of field/operator tampering | 2 | Nos. | 13,30,000 ₹26,60,000 | 13,29,247 ₹26,58,494 Lowest |
| 2.00 | Supplying installation, testing and commissioning ofretrofit Emission control device on existing 500KVA DG set at Sec-51 Gurugram University , Gurugram to reduce Particulate Matter (PM),Hydro carbon and Carbon Monoxide emission by at least 70%.
Adhering to this,
Device should be ‘Type Approved’ as per the System and Procedure of Central Pollution Control Board for Emission Compliance Testing of Retro-fit Emission Control Devices (RECD) For Diesel Power Generating Set Engines, Dated 01/02/2022, wide Pollution Control Series PCLS/12/2021-22
Adhering to this,
RECD to be ‘Type Approved’ for equivalent kVA rating from any one of the four Central Pollution Control Board, Govt, of India, recognized/approved test agencies / laboratories as given below:
(a) Automotive Research Association of India (ARAI, Pune)
(b) International Centre for Automotive Testing (ICAT, Manesar)
(c) Indian Institute of Petroleum (IIP, Dehradun)
(d) Vehicle Research Development Establishment (VRDE, Ahmednagar)
ATC:
• RECD should not be consumed additional electricity / power either from main supply or DG set to operate. No extra electricity or power would be provided to run the RECD
• RECD to be installed on the top of the DG set, with available space. No extra space to install RECD will be provided around DG set considering constraint of the space and its coast.
• RECD should not accumulate any soot, during the emission control process / device operation nor should there be any requirement for the disposal of soot.
• IoT:
The RECD device provided by the seller should be equipped with a remote Data Monitoring system certified by ICAT/ ARAI providing essential information recorded at every 15 minutes, including but not limited to:
? Energy consumption
? Running hours
? Warnings related to ECD diagnosis for the following conditions:
• Complete loss of particulate capture function
• Removal of the ECD system
• Failure of the ECD system
• Detection of exhaust bypass, temporary or permanent, as part of field/operator tampering | 1 | Nos. | 9,35,000 ₹9,35,000 Lowest | 9,51,331 ₹9,51,331 |
| 3.00 | Supplying installation, testing and commissioning ofretrofit Emission control device on existing 320KVA DG set at Sec-87 Gurugram University , Gurugram to reduce Particulate Matter (PM),Hydro carbon and Carbon Monoxide emission by at least 70%.
Adhering to this,
Device should be ‘Type Approved’ as per the System and Procedure of Central Pollution Control Board for Emission Compliance Testing of Retro-fit Emission Control Devices (RECD) For Diesel Power Generating Set Engines, Dated 01/02/2022, wide Pollution Control Series PCLS/12/2021-22
Adhering to this,
RECD to be ‘Type Approved’ for equivalent kVA rating from any one of the four Central Pollution Control Board, Govt, of India, recognized/approved test agencies / laboratories as given below:
(a) Automotive Research Association of India (ARAI, Pune)
(b) International Centre for Automotive Testing (ICAT, Manesar)
(c) Indian Institute of Petroleum (IIP, Dehradun)
(d) Vehicle Research Development Establishment (VRDE, Ahmednagar)
ATC:
• RECD should not be consumed additional electricity / power either from main supply or DG set to operate. No extra electricity or power would be provided to run the RECD
• RECD to be installed on the top of the DG set, with available space. No extra space to install RECD will be provided around DG set considering constraint of the space and its coast.
• RECD should not accumulate any soot, during the emission control process / device operation nor should there be any requirement for the disposal of soot.
• IoT:
The RECD device provided by the seller should be equipped with a remote Data Monitoring system certified by ICAT/ ARAI providing essential information recorded at every 15 minutes, including but not limited to:
? Energy consumption
? Running hours
? Warnings related to ECD diagnosis for the following conditions:
• Complete loss of particulate capture function
• Removal of the ECD system
• Failure of the ECD system
• Detection of exhaust bypass, temporary or permanent, as part of field/operator tampering | 1 | Nos. | 6,50,000 ₹6,50,000 Lowest | 6,95,537 ₹6,95,537 |
| 4.00 | Supplying installation, testing and commissioning ofretrofit Emission control device on existing 62.5KVA DG set at Sec-51 and at Sec-87 Gurugram University, Gurugram to reduce Particulate Matter (PM),Hydro carbon and Carbon Monoxide emission by at least 70%.
Adhering to this,
Device should be ‘Type Approved’ as per the System and Procedure of Central Pollution Control Board for Emission Compliance Testing of Retro-fit Emission Control Devices (RECD) For Diesel Power Generating Set Engines, Dated 01/02/2022, wide Pollution Control Series PCLS/12/2021-22
Adhering to this,
RECD to be ‘Type Approved’ for equivalent kVA rating from any one of the four Central Pollution Control Board, Govt, of India, recognized/approved test agencies / laboratories as given below:
(a) Automotive Research Association of India (ARAI, Pune)
(b) International Centre for Automotive Testing (ICAT, Manesar)
(c) Indian Institute of Petroleum (IIP, Dehradun)
(d) Vehicle Research Development Establishment (VRDE, Ahmednagar)
ATC:
• RECD should not be consumed additional electricity / power either from main supply or DG set to operate. No extra electricity or power would be provided to run the RECD
• RECD to be installed on the top of the DG set, with available space. No extra space to install RECD will be provided around DG set considering constraint of the space and its coast.
• RECD should not accumulate any soot, during the emission control process / device operation nor should there be any requirement for the disposal of soot.
• IoT:
The RECD device provided by the seller should be equipped with a remote Data Monitoring system certified by ICAT/ ARAI providing essential information recorded at every 15 minutes, including but not limited to:
? Energy consumption
? Running hours
? Warnings related to ECD diagnosis for the following conditions:
• Complete loss of particulate capture function
• Removal of the ECD system
• Failure of the ECD system
• Detection of exhaust bypass, temporary or permanent, as part of field/operator tampering | 2 | Nos. | 2,25,000 ₹4,50,000 Lowest | 2,40,707 ₹4,81,414 |
Tender Value
₹68.2 L
EMD Value
₹1.6 L
Closing Date
4 Feb 2025, 5:00 pmClosed
JITENDER KHURANA
Gurugram University Gurugram
SITC of Retrofit Emission Control Device/Equipment for Diesel Generators to be installed at Sec-51 and Sec-87, Gurugram University, Gurugram
2025_HRY_423345_1
20250D1C8C3B 8E47 4614 B985 CC2BF8164E761857GGU
Open Tender
Civil Works
Works
120 days
Gurugram Manesar
2 documents required · 2 mandatory
₹5,000
Yes
₹1.6 L
Yes
20 Nov 2025
13 Jan 2025
5 Feb 2025
13 Jan 2025
4 Feb 2025
13 Jan 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .