| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹33.4 LAccepted-AOC | 1 | Accepted-AOC L-1 | |
| 2 | 2₹37.6 L+₹4.1 L (12.4%)Rejected-AOC | 2 | Rejected-AOC L-2 | |
| 3 | 3₹37.7 L+₹4.2 L (12.7%)Rejected-AOC | 3 | Rejected-AOC L-3 | |
| 4 | 4₹39.0 L+₹5.6 L (16.7%)Rejected-AOC OLD BAZAR DEVIGARH DISTRICT PATIALA 147001 | DEVIGARH | PATIALA | PUNJAB | 147001 | 4 | Rejected-AOC L-4 | |
| 5 | 5₹41.7 L+₹8.3 L (24.8%)Rejected-AOC BOLLYWOOD GREEN CITY SECTOR 113 S A S NAGAR | SAS NAGAR | RUPNAGAR | PUNJAB | 5 | Rejected-AOC L-5 |
| Sl No | Description | Qty | Unit | BALDEV SINGH CONTRACTOR L2 | THE SHIV SHANKAR CO OP L AND C SOCIETY LTD L4 | Ess Aar Builders L5 | MOHINDER SINGH CONTRACTOR L3 | CHARANJEET SINGH CONTRACTOR L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | First class burnt brick work laid in cement sand mortar 1:4 in first storey upto 4 metres above plinth level. | 14 | cum | 4,801 ₹67,214 | 1,000 ₹14,000 Lowest | 6,500 ₹91,000 | 4,800 ₹67,200 | 4,270 ₹59,780 |
| 2.00 | Scraping White wash and colour wash etc. | 9,048.48 | sqm | 5.83 ₹52,752.64 | 3 ₹27,145.44 Lowest | 5 ₹45,242.4 | 6.3 ₹57,005.42 | 7.37 ₹66,687.3 |
| 3.00 | Preparation of plastered or concrete surface for painting (including sand papering the surface) using ready mixed cement based wall putty by applying two coats to get required finish. | 6,994.54 | sqm | 66.68 ₹4,66,395.93 | 70 ₹4,89,617.8 | 65 ₹4,54,645.1 | 40 ₹2,79,781.6 Lowest | 59 ₹4,12,677.86 |
| 4.00 | Applying Priming coat with cement primer in all shades on newly plastered or conc surface | 6,994.54 | sqm | 17.5 ₹1,22,404.45 | 22.12 ₹1,54,719.22 | 25 ₹1,74,863.5 | 19 ₹1,32,896.26 | 15.6 ₹1,09,114.82 Lowest |
| 5.00 | Wall painting with plastic emulsion paint of approved brand to give an even shade 2 coats | 6,994.54 | sqm | 74.18 ₹5,18,854.98 | 93.76 ₹6,55,808.07 | 80 ₹5,59,563.2 | 80 ₹5,59,563.2 | 66.1 ₹4,62,339.09 Lowest |
| 6.00 | Finishing walls with acralic smooth exterior paint of reqdshade with 2 or more coats applied @ 1.67kg/10sqm over and incl. base coat of water proofing cement paint @ 2.20kg/10sqm | 2,049.77 | sqm | 100 ₹2,04,977 | 126.42 ₹2,59,131.92 | 106 ₹2,17,275.62 | 107.4 ₹2,20,145.3 | 89.12 ₹1,82,675.5 Lowest |
| 7.00 | Dismantling cement conglomerate floors 25mm to 50mm thick including concrete base. 109+5.35%=114.83 | 1,538.18 | sqm | 90.85 ₹1,39,743.65 | 1 ₹1,538.18 Lowest | 100 ₹1,53,818 | 80 ₹1,23,054.4 | 80.95 ₹1,24,515.67 |
| 8.00 | Providing a vitrified floor tiles 600x600mm size premium quality, manufactured using Double charge Technology, with water absorption less than 0.08% and conforming to IS: 15622 of approved make in all colours and shades, | 1,538.18 | sqm | 881.77 ₹13,56,320.98 | 1,104.06 ₹16,98,243.01 | 1,050 ₹16,15,089 | 937 ₹14,41,274.66 | 772.5 ₹11,88,244.05 Lowest |
| 9.00 | Grouting the joints of flooring tiles having joints of 3mm width, using Epoxy grout mix of 0.70 kg oforganic coated filler of desired shade 0.10kg of hardener and 0.20 kg of resin incl filling and finishing complete. | 1,538.18 | sqm | 147.52 ₹2,26,912.31 | 186.47 ₹2,86,824.42 | 126 ₹1,93,810.68 Lowest | 158 ₹2,43,032.44 | 131.46 ₹2,02,209.14 |
| 10.00 | Providing and laying Anti skid Ceramic floor tiles of size 300x300 mm x 10 mm thick of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on flooring skirting and dado in 12.5mm thick cement plaster 1:3 in base and jointed with @ 3.3 kg/sqm including pointing the joints with white cement and matching pigment etc., completewhite cement slurry in joints including corners angles and beading. | 99.12 | sqm | 565.62 ₹56,064.25 | 707.95 ₹70,172 | 750 ₹74,340 | 600 ₹59,472 | 499 ₹49,460.88 Lowest |
Tender Value
₹47.4 L
EMD Value
₹94,893
Closing Date
30 Jul 2025, 4:00 pmClosed
XEN, BML DIVISION, PATIALA
XEN, BML DIVISION, JAIL ROAD, PATIALA
Repair/Renovation of Class-B Quarters of Bhakra Colony, Patiala
2025_WR_144865_1
26/25-26
Open Tender
Civil Works
Item Rate
60 days
PATIALA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
₹94,893
Yes
11 Aug 2025
16 Jul 2025
31 Jul 2025
16 Jul 2025
30 Jul 2025
16 Jul 2025
Amount
First class burnt brick work laid in cement sand mortar 1:4 in first storey upto 4 metres above plinth level.
Scraping White wash and colour wash etc.
Preparation of plastered or concrete surface for painting (including sand papering the surface) using ready mixed cement based wall putty by applying two coats to get required finish.
Applying Priming coat with cement primer in all shades on newly plastered or conc surface
Wall painting with plastic emulsion paint of approved brand to give an even shade 2 coats
Finishing walls with acralic smooth exterior paint of reqdshade with 2 or more coats applied @ 1.67kg/10sqm over and incl. base coat of water proofing cement paint @ 2.20kg/10sqm
Dismantling cement conglomerate floors 25mm to 50mm thick including concrete base. 109+5.35%=114.83
Providing a vitrified floor tiles 600x600mm size premium quality, manufactured using Double charge Technology, with water absorption less than 0.08% and conforming to IS: 15622 of approved make in all colours and shades,
Grouting the joints of flooring tiles having joints of 3mm width, using Epoxy grout mix of 0.70 kg oforganic coated filler of desired shade 0.10kg of hardener and 0.20 kg of resin incl filling and finishing complete.
Providing and laying Anti skid Ceramic floor tiles of size 300x300 mm x 10 mm thick of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on flooring skirting and dado in 12.5mm thick cement plaster 1:3 in base and jointed with @ 3.3 kg/sqm including pointing the joints with white cement and matching pigment etc., completewhite cement slurry in joints including corners angles and beading.
Providing and fixing 1st quality ceramic glazed wall tiles Matt/Semi Matt/Glosy/Highly Gloss finish/Highlighter/emboss conforming to IS : 15622 (thickness to be specified by the manufacture of approved make in all colours, shades except burgundy, bottle green, black of size 200 x 300 mm, 100x200mm, 200x200mm as approved by Engineer-in-Charge in skirting, risers of steps and dados over 12 mm thick bed of cement Mortar 1:4 (1 cement: 4 fine sand) and jointing with grey cement slurry @ 3.3kg per sqm including pointing in white cement mixed with pigment of matching shade complete
Dismentelling/Removing door windows with chowkhats by making access in walls :-door + almiras & cup boards
Dismentelling wire gauge with frame work
Hollock wood doors shutter windows shutter including hinges, screws, chocks, cheats, stops cords etc. complete fixed in position. 35 mm thick panneled , glazed or panneled
Wire gauge Door shutters with Kail wood without springs housed in chowkhats
Wire gauge fixed on chowkats with 25mm thick with25mm th champ (assam) wood cover molding of full width
Painting two coats with synthetic enamel paints in all shades on newwood work or metallic surface t.
Supply and erection of switches, sockets and other accessories (flush piano type/ modular accessories) in the existing bakelite/ modular cover frame including fixing & connections and petty material etc.,:-(xxiv) Modular MCB 20 Amp
Plastic distribution Box:-Supply and erection of Plastic enclosure DB's of various sizes on surface on wall for mounting MCB's SP/ DP/ FP including fixing and other petty material etc.:- MCCB 2way
BALDEV SINGH CONTRACTOR (BID ID -665955)
MOHINDER SINGH CONTRACTOR (BID ID -666016)
THE SHIV SHANKAR CO OP L AND C SOCIETY LTD (BID ID -666074)
Ess Aar Builders (BID ID -666085)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .