| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹286.7 CrAdmitted-Finance 5 TH FLOOR FORTUNE 2000 BANDRA EAST BANDRA KURLA COMPLEX MUMBAI MAHARASHTRA 400051 | MUMBAI SUBURBAN | MAHARASHTRA | 400051 | +31.11% | ₹286.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹298.5 Cr+₹11.7 Cr (4.09%)Admitted-Finance 401 THE GRAND MALL OPP STATE BANK ZONAL OFFICE S M ROAD AMBAWADI AHMEDABAD 380015 | AHMADABAD | GUJARAT | 380015 | +36.47% | ₹298.5 Cr+₹11.7 Cr (4.09%) | L2 | Admitted-Finance |
Tender Value
₹218.7 Cr
EMD Value
₹4.4 Cr
Closing Date
5 Dec 2025, 6:00 pmClosed
Executive Engineer-8
EE-8, Room No. CB-201B, 2 floor, CCC Building JDA
Construction of Elevated road from Sanganer Flyover to near Malpura gate via Choradiya petrol pump in Zone 8 JDA Jaipur.
2025_JDAJP_508349_1
JDA/EE-8/16/2025-26
Open Tender
Civil Works
Percentage
913 days
Construction of Elevated road from Sanganer
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Secretary, JDA
₹4.4 Cr
Yes
Manthan Hall Main Building, JDA Campus, Jaipur
31 Dec 2025
21 Oct 2025
11 Dec 2025
21 Oct 2025
5 Dec 2025
21 Oct 2025
31 Oct 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Flexible Pavements Dismantling of Flexible Pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRD Specification Clause 202
By Manual Means
Granular Courses | 0.2 | Cum | 198 | ₹39.4 |
| 2 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRD Specification Clause 202 By Mechanical Means
Bituminous Courses | 0.8 | Cum | 115.2 | ₹92.16 |
| 3 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.
In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.
Depth upto 1.5m | 0.6 | Cum | 169 | ₹101.23 |
| 4 | Add extra for over all depth of excavation above 1.5 m and upto 3.0 m over item no 4.9.1.1 | 0.6 | Cum | 25.5 | ₹15.3 |
| 5 | CARRIAGE OF MATERIALS (By Mechanical Means) Remarks : The rates will be applicable to net quantities after deduction of percentage for voids mentioned in the specification under subhead "Carriage of Materials" Carriage of Materials by mechanical transport including loading, unloading and stacking ::
Earth ,Rate for Lead 5 Km | 0.6 | Cum | 88.98 | ₹53.39 |
| 6 | Providing, laying and compacting plain/ reinforced cement concrete of specified grade in foundation/ leveling course/ pile cap using concrete mixer and vibrater complete including cost of form work, as per drawing and technical specifications and as per clause 1100, 1500,1700,2100 of MoRT&H specification including all scaffolding material, labour, machinery.
PCC Grade M-15 | 0.6 | Cum | 3,840 | ₹2,300.16 |
| 7 | Bored cast-in-situ R.C.C. pile with design mix concrete using batching plant, transit mixer and concrete pump, excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. as per clause 1100, 1600 & 1700 of MoRT&H Specification including all material, labour and machinery.
1200 mm dia pile,RCC Grade M -35 (Design mix) | - | Mtr | 9,850 | - |
| 8 | Providing, laying and compacting design mix plain/ reinforced cement concrete of specified grade in foundation/ leveling course/ pile cap using batching plant, transit mixer and concrete pump and vibrater including cost of form work, complete as per drawing and technical specifications as per clause 1100, 1500,1700,2100 of MoRT&H specification including all material, labour, machinery, and maintenance of diversion ,RCC Grade M -35 | 1 | Cum | 5,100 | ₹5,094.9 |
| 9 | Providing, laying and compacting design mix plain/ reinforced cement concrete of specified grade in foundation/ leveling course/ pile cap using batching plant, transit mixer and concrete pump and vibrater including cost of form work, complete as per drawing and technical specifications as per clause 1100, 1500,1700,2100 of MoRT&H specification including all material, labour, machinery, and maintenance of diversion
RCC Grade M -25 | - | Cum | 5,010 | - |
| 10 | Providing and laying TMT bar reinforcement at any level in foundation/ pile/ pile cap complete as per drawing and clause 1600 of MoRT&H Specification including all material, labour and
machinery. | 0.6 | Tonne | 64,600 | ₹38,695.4 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.77 MB
Tender16Final.pdf
Tender Documents • 9.75 MB
BOQ_905283.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .