| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | L2₹1.5 L+₹9,847.51 (7.22%)Rejected-Finance | L2 | Rejected-Finance Reject | |
| 3 | L3₹1.5 L+₹16,822.54 (12.3%)Rejected-Finance | L3 | Rejected-Finance Reject | |
| 4 | L4₹1.6 L+₹24,635.65 (18.1%)Rejected-Finance | L4 | Rejected-Finance Reject | |
| 5 | L5₹1.8 L+₹45,082.69 (33.1%)Rejected-Finance | L5 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | Selvaraj G L4 | Pichandi L2 | VTV Vignesh Government Contractor and builder L1 | DEVADASS SUBRAMANI L5 | S PALANI L3 |
|---|---|---|---|---|---|---|---|---|
| 1.001.Constraction of Community soak pit at Cherukkanur Anganwadi in Cherukanur Panchayat | ||||||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. As per SS 20 B | 4.32 | m3 | 700 ₹3,024 | 263.78 ₹1,139.53 | 263.78 ₹1,139.53 | 750 ₹3,240 | 263 ₹1,136.16 Lowest |
| 3.00 | Cement concrete 1:4:8(one cement,Four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than | 0.25 | m3 | 6,000 ₹1,500 | 5,000 ₹1,250 Lowest | 5,808.75 ₹1,452.19 | 6,000 ₹1,500 | 5,808 ₹1,452 |
| 4.00 | Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete | 0.23 | m3 | 3,000 ₹690 Lowest | 6,106 ₹1,404.38 | 6,142.95 ₹1,412.88 | 3,000 ₹690 Lowest | 6,142 ₹1,412.66 |
| 5.00 | Filiing The Soak Pit Materials 225mm metal / Boulders | 1.01 | m3 | 1,000 ₹1,010 Lowest | 1,006.29 ₹1,016.35 | 1,006.29 ₹1,016.35 | 1,000 ₹1,010 Lowest | 1,006 ₹1,016.06 |
| 6.00 | 65/63mm metal | 1.01 | m3 | 1,000 ₹1,010 Lowest | 1,450 ₹1,464.5 | 1,592.9 ₹1,608.83 | 1,000 ₹1,010 Lowest | 1,592 ₹1,607.92 |
| 7.00 | 20mm Metal | 1.78 | m3 | 500 ₹890 | 1,800 ₹3,204 | 100 ₹178 Lowest | 500 ₹890 | 2,207 ₹3,928.46 |
| 8.00 | Supply of 0.900m dia cement tank with top cover including cost etc complete | 6 | nos | 800 ₹4,800 | 700 ₹4,200 | 700 ₹4,200 | 1,100 ₹6,600 | 500 ₹3,000 Lowest |
| 9.00 | Filling of metal aggregate in the soak pit including the labour charges etc complete | 1 | nos | 1,000 ₹1,000 | 800 ₹800 | 273 ₹273 Lowest | 1,000 ₹1,000 | 273 ₹273 Lowest |
| 10.00 | Plastering with CM 1:5, 12mm thick including cost and convayance to site and labour charges etc, complete. | 2.84 | m2 | 500 ₹1,420 | 180 ₹511.2 Lowest | 287.24 ₹815.76 | 500 ₹1,420 | 287 ₹815.08 |
Tender Value
₹1.9 L
EMD Value
₹2,000
Closing Date
16 Sept 2026, 3:00 pmClosed
Block Development Office(VP),Tiruttani Bllock
Block Development Office(VP),Tiruttani Bllock
CherukkanurSoakPit8NosCherukkanurPT
2026_RDTN_700182_1
3637_SBM_TRT_04
Open Tender
Civil Works - Buildings
Item Rate
90 days
Block Development Office(VP), Tiruttani Bllock
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2,000
Yes
9 Oct 2026
1 Sept 2026
16 Sept 2026
1 Sept 2026
16 Sept 2026
1 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.Constraction of Community soak pit at Cherukkanur Anganwadi in Cherukanur Panchayat | - | - | - | - |
| 2 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. As per SS 20 B | 4.32 | m3 | 263.78 | ₹1,139.53 |
| 3 | Cement concrete 1:4:8(one cement,Four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than | 0.25 | m3 | 5,808.75 | ₹1,452.19 |
| 4 | Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete | 0.23 | m3 | 6,142.95 | ₹1,412.88 |
| 5 | Filiing The Soak Pit Materials 225mm metal / Boulders | 1.01 | m3 | 1,006.29 | ₹1,016.35 |
| 6 | 65/63mm metal | 1.01 | m3 | 1,592.9 | ₹1,608.83 |
| 7 | 20mm Metal | 1.78 | m3 | 2,207 | ₹3,928.46 |
| 8 | Supply of 0.900m dia cement tank with top cover including cost etc complete | 6 | nos | 900 | ₹5,400 |
| 9 | Filling of metal aggregate in the soak pit including the labour charges etc complete | 1 | nos | 273 | ₹273 |
| 10 | Plastering with CM 1:5, 12mm thick including cost and convayance to site and labour charges etc, complete. | 2.84 | m2 | 287.24 | ₹815.76 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_841624.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.59 MB
BOQ_841624.xls
BOQ • 0.38 MB
Cherukkanur192000.pdf
Tender Documents • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .