RequiredExperience with Government
RequiredAnnual Turnover
RequiredOEM Authorization Certificate
RequiredOEM Annual Turnover Bid to RA enabled No Note: 1. OEM Turn Over Criteria: The minimum average annual financial turnover of the OEM of the offered product during the last three years
Requiredending on 31st March of the previous financial year
Requiredshould be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant/Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution/incorporation of the OEM is less than 3 year old
Requiredthe average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria. Octagonal Pole With Single Arm Or Double Arm Brackets ( 474 set ) Technical Specifications 1/7 * As per GeM Category Specification Specification Specification Name Values Bid Requirement (Allowed Values) GENERIC The Octogonal pole Designing
RequiredEngineering
RequiredFabrication and testing before despath with required height and required no. of light fittings with luminaire carriage etc.
Requiredfor illumination of open areas Yes Yes Height of Octogonal pole (in Meters) 9 9 Type of bracket for suitable fitment of luminare on the Octagonal pole Single Arm Single Arm Each bracket length (in mm) 1500 1500 No. of LED Luminaires can be fitted in the bracket of each octagonal pole (in Nos.) 1 1 Installation
Requiredtesting and demonstration Excluding Civil work Excluding Civil work On site warranty (in Months) 12 12 OCTAGONAL POLE CONSTRUCTION Material of Octagonal pole Grade 355 as per IS:5986:2011 latest Grade 355 as per IS:5986:2011 latest No.of section (in Nos.) 1 1 Cross section of Octagonal pole (no of sides) 8 sided polygon 8 sided polygon Internal distance between parallel faces at the base of pole 155 155 Internal distance between parallel faces at the top of pole 70 70 Octagonal pole sheet thickness 3 3 2/7 Type of welding Seamless Single longitutinal Saw weld (No circumference weld allowed) Seamless Single longitutinal Saw weld (No circumference weld allowed) No of longitudinal welds (in Nos) 1 1 No. of stiffners per pole 4 4 Metal protection treatment of fabircated mast section Hot dip Galvanised
Requiredas per IS:4759 latest: 610 g/m2 * Luminaire carriage brackets Fabricated suitably and hot dip galvanized for fixing and holding required no. of light fixtures * Door opening on base of the pole (opening permits clear access to equipment like MCB
RequiredSwitches
Requiredcables
Requiredetc.
Required) Door opening: 500 mm height from base plate
RequiredSize: 100 mm x 500 mm with Gasket Door opening: 500 mm height from base plate
RequiredSize: 100 mm x 500 mm with Gasket Type of locking arrangement for door Pad lock with key Pad lock with key BASE PLATE Base plate material Grade: E250
RequiredQuality:BR (as per IS:2062:2011 latest) Grade: E250
RequiredQuality:BR (as per IS:2062:2011 latest) Base plate size - ( Length in mm x Width in mm x Thickness in mm) 250X250X16 250X250X16 Necessary accessories on each pole Suitable foundation Bolts
RequiredNuts and Washers and instruction manual Suitable foundation Bolts
RequiredNuts and Washers and instruction manual Each pole shall be supply with suitable foundation bolts
Requirednuts and washers
RequiredInstruction manuals Yes Yes Foundation Bolt type J-Type J-Type No. of Bolts x No. of Nuts per Bolt x No.of Washers per Bolt for each pole (in Nos.) 4x3x3 4x3x3 Bolt size M24x750 M24x750 3/7 Conformity of specification for Bolts and Nuts as per IS:1367 (Part 2)
RequiredGrade A as per IS:1367 (Part 2)
RequiredGrade A Galvanization of foundation bolts and nuts and octagonal pole shall be Galvanized As per IS:4759 latest As per IS:4759 latest Earthing terminals on the base of the pole
Requiredfor lightning and electrical protection Using 12 mm dia SS Bolts of suitable length Using 12 mm dia SS Bolts of suitable length WIND LOAD Compliance to wind velocity test for the pole structure IS 875:1987 part 3 latest IS 875:1987 part 3 latest Regional wind withstand capacity which the pole structure support is suitable to withstand (in m/s) 39 39 Gust Factor 1.15 1.15 The designed Life of the Pole shall be (in Years) 25 25 ADD ON ITEMS Galvanized lightning finial for each pole (in Nos) Without Lightning Finial Without Lightning Finial Aviation obstruction lights on top of each pole with vertical stand and with LED/GLS (in Nos) Without Aviation Light Without Aviation Light Junction box on the Carriage Assembly as required
Requiredfrom which the interconnections for the designed number of the light fixtures on the carriages No No Material of Junction Box Without Junction Box Without Junction Box Ingress protection class of Junction Box Without Junction Box Without Junction Box Cable (ISI Marked Cable) connections from the top junction box to the Without Cable Connection Without Cable Connection 4/7 individual luminaries of each pole Cable (ISI Marked Cable) connections from the Bottom of the pole i.e. from pole's door opening (Base compartment) to top junction box of each pole Without Cable Connection Without Cable Connection Terminal Box with Circuit breakers and backlite sheet for cable termination at door opening (Base compartment) for each pole Without MCBs Without MCBs No.of MCB per Junction Box (in Nos.) Without MCBs Without MCBs Suitable winch mechanism (raising and lowering mechanism) according to pole height and according to no.of LED luminaires with necessary interlocking
Requiredwires and ropes for maintenance Without Winch Mechanism Without Winch Mechanism CERTIFICATIONS Availability of type test reports for the entire system including for Pole construction
Requiredwind load (velocity) tests
RequiredWinch Mechanism
Requiredfrom Central Govt.
RequiredLab/NABL.ILAC acreediated lab to prove conformity of the specification Yes Yes Test report Number - * Test Report date - * Name of lab - * Laboratory address - * Agreed to furnish all the test reports and certificates to buyer consignee on demand Yes * 5/7 * Specifications highlighted in bold are the Golden Parameters. * Bidders may note that In respect of non-golden Parameters
Requiredthe specifications 'Values' chosen by Buyer will generally be preferred over 'Bid requirement ( allowed Values) by the Buyer.