Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 2ND FLOOR SHOP NO 303 MARUTI PLAZA RONCHI BANGAR TOWNSHIP MATHURA | MATHURA | UTTAR PRADESH | 281001 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2.0 L
EMD Value
₹2,000
Closing Date
13 Oct 2020, 12:00 pmClosed
SE ETC UPPTCL GREATER NOIDA
400 KV SUB STATION PALI GAUTAM BUDH NAGAR GREATER NOIDA
ELECTRICAL WORK
2020_UPTCL_517724_1
T-83/2020-21ETC/GN
Open Tender
Electrical Works
Fixed-rate
60 days
KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ELECTRICITY 400 KV SUB STATION GREATER NOIDA
₹2,000
23 Oct 2020
5 Oct 2020
13 Oct 2020
5 Oct 2020
13 Oct 2020
5 Oct 2020
Amount
Dismentaling Carriage & Erection of 132 KV CB ABB make( CB No 701, 2X20MVAR Capacitor Bank-I) at 220 KV S/S Khurja with following perticulars. Dismantling of Pole of 132 KV CB of ABB make from spare breaker at 132 KV S/S Bhoor, under ETD Bulandshahr by help of crane/ hydra under the supervision of JE/SDO ETD-Khurja.
Safely carriage of 1 nos Pole of 132 KV CB from 132 KV S/S Bhoor, under ETD Bulandshahr to 220 KV S/S Khruja work includes loading & unloading of article by help of crane/hydra.
Dismantling of 01 Nos. Pole of damage 132 KV CB of ABB make at 220kV S/S Khurja under ETD Khurja by help of crane/ hydra under the supervision of JE/SDO ETD-Khurja.
Installation & Erection of Pole (1 nos. of B phase) of 132 KV CB ABB make (CB no 701, 40MVAR capacitor bank-I) by help of hydra/crane work includes setting, alignment & proper fixing/commissioning with breaker mechanism and all to make work satisfactory with the help of proper man power and technical skiled labor and T&P at 220 KV S/S Khurja.
Repair & Overhauling of 132 KV CB ABB make (CB no 701) at 220 KV S/S Khurja with following perticulars.Opening/Dismantling of control valve assembly, cleaning of cap seal cylinder, removal of defective roller, re-fixing of new roller, reassembly of control valve assembly in mechanism, Opening of anti-pumping pin assembly cleaning, de-rusting & lubrication of anti-pumping pin assembly. Replacement of spring in anti pumping. opening and cleaning of closing spring, shock absorber, pneumatic cylinder, cleaning of piston & cylinder including their assembly, Opening and reassembling of trip coil assembly after cleaning of its various parts including measurement of resistance, adjustment of trip coil gap. Checking of NRV & Drain valve for air leakage with help of soap seeds. Checking of air switch i.e. governor switches, low air pressure alarm switch including adjustment. Checking of gas density switch including all adjustment. De-rusting lubrication of horizontal rod assembly & its various linkages, cleaning of bar pins,replacement of cerclip. Show operation of circuit breaker with help of manual jack for checing over stroke, wipe, poles traveling etc for satisfactory operation.
Measuring of CB operation time as per standard specification open time, close time & Open-close time to make CB ready for charge. (A) CB Open Time (B) CB Close time. (C) CB Close-open Time
Repairing & Overhauling of 132 KV CB CG make (CB No. 781 of 40 MVA T/F-I) at 132 KV S/S Debai with following particulars. Dismentling of compressor unit by disconnecting the main power supply contractor and OLR and releasing the air by opening of the associated valve and through cleaning of the surface of pipe connections by suitable procedures. Cleaning, fixing and replacement of defective air breather assembly. Checking & fixing of NRV at its place. Checking & fixing of safety valve at its place. Replacement of dirty compressor oil with new K-oil as per stansard. Replacement of air filter for completion of work satisfactorily.
Opening/Dismantling of control valve assembly, cleaning of cap seal cylinder, removal of defective roller, re-fixing of new roller, reassembly of control valve assembly in mechanism, Opening of anti-pumping pin assembly cleaning, de-rusting & lubrication of anti-pumping pin assembly. Replacement of spring in anti pumping. opening and cleaning of closing spring, shock absorber, pneumatic cylinder, cleaning of piston & cylinder including their assembly, Opening and reassembling of trip coil assembly after cleaning of its various parts including measurement of resistance, adjustment of trip coil gap. Checking of NRV & Drain valve for air leakage with help of soap seeds. Checking of air switch i.e. governor switches, low air pressure alarm switch including adjustment. Checking of gas density switch including all adjustment. De-rusting lubrication of horizontal rod assembly & its various linkages, cleaning of bar pins,replacement of cerclip. Show operation of circuit breaker with help of manual jack for checing over stroke, wipe, poles traveling etc for satisfactory operation.
Measuring of CB operation time as per standard specification open time, close time & Open-close time to make CB ready for charge. (A) CB Open Time. (B) CB Close time. (C) CB Close-open Time
TIRUPATI ELECTRICALS
M/S SATKAR TRADERS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .