| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC | ₹5.8 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹5.9 L+₹3,192 (0.55%)Rejected-AOC | ₹5.9 L+₹3,192 (0.55%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | RGR CONSTRUCTION L2 | PRAVILA BULDERS L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the damaged PCC as per Instruction of departmental officers..including all initial lead and lift etc complete. | 6 | m3 | 575 ₹3,450 | 572 ₹3,432 Lowest |
| 2.00 | Earth work excavation in all soils and sub-soils and the full depth as may be directed by the departmental officers with initial lead and lift and cleaning and levelling the site etc., complete complying with standard specification | 11 | m3 | 150 ₹1,650 | 128 ₹1,408 Lowest |
| 3.00 | Dismantling the damaged RCC Slab as per Instruction of departmental officers..including all initial lead and lift etc complete. | 12 | m3 | 5,071 ₹60,852 Lowest | 5,071 ₹60,852 Lowest |
| 4.00 | Desilting the existing ugd chambers as per Instruction of departmental officers..including all initial lead and lift etc complete. | 5 | m3 | 150 ₹750 | 128 ₹640 Lowest |
| 5.00 | Dismantling the damaged PCC WALL as per Instruction of departmental officers..including all initial lead and lift etc complete. | 7 | m3 | 575 ₹4,025 | 572 ₹4,004 Lowest |
| 6.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 1 | M3 | 5,962 ₹5,962 Lowest | 5,962 ₹5,962 Lowest |
| 7.00 | Centering with Steel Plates for Sides and Soffits including all Labour Charges as per the Direction of the Departmental officers Etc., Complete. | 68 | m2 | 1,070 ₹72,760 | 1,068 ₹72,624 Lowest |
| 8.00 | Cement concrete 1:3:6 mix (one cement Three sand and Six aggregates) using 20 mm size hard broken stones from approved quarry complying with standard specification | 11 | m3 | 6,721 ₹73,931 Lowest | 6,721 ₹73,931 Lowest |
| 9.00 | Plastering in Cement Morter 1: 5 Mix using 20 mm Thick including Curing and all Labour Charges as per the Direction of the Departmental officers Etc., Complete | 32 | M2 | 310 ₹9,920 | 309 ₹9,888 Lowest |
| 10.00 | Centering with Steel Plates for Sides and Soffits including all Labour Charges as per the Direction of the Departmental officers Etc., Complete. | 60 | m2 | 1,185 ₹71,100 | 1,180 ₹70,800 Lowest |
Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
22 Dec 2025, 3:00 pmClosed
Assisstant Commissioner
West Zone, Coimbatore Corporation
Raising of UGD Chambers at Kondasamy Street, Vinayagar Kovil Street, Chinnanan Chettiyar Street and Ponni Nalli Konar Street in Ward no 43 of West Zone
2025_MAWS_630702_36
E7/WestZone/2025
Open Tender
Civil Works
Works
90 days
West Zone, Coimbatore Corporation
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹7,000
28 Apr 2026
11 Dec 2025
23 Dec 2025
12 Dec 2025
22 Dec 2025
12 Dec 2025
Dismantling the damaged PCC as per Instruction of departmental officers..including all initial lead and lift etc complete.
Earth work excavation in all soils and sub-soils and the full depth as may be directed by the departmental officers with initial lead and lift and cleaning and levelling the site etc., complete complying with standard specification
Dismantling the damaged RCC Slab as per Instruction of departmental officers..including all initial lead and lift etc complete.
Desilting the existing ugd chambers as per Instruction of departmental officers..including all initial lead and lift etc complete.
Dismantling the damaged PCC WALL as per Instruction of departmental officers..including all initial lead and lift etc complete.
Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Centering with Steel Plates for Sides and Soffits including all Labour Charges as per the Direction of the Departmental officers Etc., Complete.
Cement concrete 1:3:6 mix (one cement Three sand and Six aggregates) using 20 mm size hard broken stones from approved quarry complying with standard specification
Plastering in Cement Morter 1: 5 Mix using 20 mm Thick including Curing and all Labour Charges as per the Direction of the Departmental officers Etc., Complete
Centering with Steel Plates for Sides and Soffits including all Labour Charges as per the Direction of the Departmental officers Etc., Complete.
Supply and Fabrication of RTS Rods in Various Dia. Including Cutting, Bending and Tying with all Labour Charges Etc., Complete.
Supply and fixing of 600mm x 600mm dia SFRC MANHOLE COVER (Heavy Duty) with Frame including loading and unloading charges etc., completed.
Reinforced Cement Concrete 1:1.5:3 Mix ( One Cement, One and Half Sand, Three Jelly) using 20 mm size HGB Jelly from Apprroved Quarry as per Standard Specification Etc., Complete.
Conveying the excavated earth from the site from 0 to 15 km lead including loading and unloading charges etc., completed.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
SWD.pdf
Tender Documents • 0.86 MB
BOQ_754882.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .