| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.0 CrAccepted-AOC 0 RAM SURAT MAURYA 0 SHAKARMANDI JAUNPUR JAUNPUR UTTAR PRADESH 222001 UDYAM UP 38 0066946 | JAUNPUR | UTTAR PRADESH | 222001 | ₹28.0 Cr Quoted ₹28.8 Cr | L1 | Accepted-AOC The Lowest Tender after negotiation has been accepted by the 82nd TAC Meeting held on 26.09.2025. |
| 2 | L2₹29.5 CrRejected-AOC | ₹29.5 Cr | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M/S Annanmar Constructions L2 | S K & CO L1 |
|---|---|---|---|---|---|
| 1.00 | Clearing Juliflora jungle without uprooting and disposing off the same and complete complying with standard specification and as directed by the Engineer in charge of work. | 1,64,998 | Sqm | 8.2 ₹13.5 L | 8.1 ₹13.4 L |
| 2.00 | Dismantling, clearing away and carefully stacking material and without disturbing nearby structure useful for reuse for any thickness of brick or stone masonry in Cement Mortar walls under 3 (Three) meters high etc, complete as directed by the Engineer in charge of works and as per the technical specifications. | 29.4 | Sqm | 315 ₹9,261 | 310 ₹9,114 |
| 3.00 | Dismantling, clearing away and carefully stacking material and without disturbing nearby structure useful for reuse for any thickness of Plain Cement Concrete under 3 (Three) meters high etc, complete as directed by the Engineer in charge of works and as per the technical specifications. | 22 | Sqm | 540 ₹11,880 | 525 ₹11,550 |
| 4.00 | Earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders hard red gravelly soil inclusive of shoring to full depth, strutting and bailing out water wherever necessary and refilling the sides of foundations with excavated soil other than sand in layers of not more than 15cm thick. well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with an initial lead of 10 meters and initial lift of 2 meters and clearing levelling the site etc., complete complying with standard specification and as directed by the Engineer in charge of work.(SS20 B) (Narrow cutting) | 4,220 | Cum | 275 ₹11.6 L | 265 ₹11.2 L |
| 5.00 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds,breaking clods, sectioning etc., complete | 17,809 | Cum | 60 ₹10.7 L | 60 ₹10.7 L |
| 6.00 | Earth work excavating and depositing on bank with initial lead of 10 and initial lift of 2m in sand silt or other loose soil wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil, including excavated earth etc., complete complying with standard specification and as directed by the Engineer in charge of work. . (SS20B For Open Excavation) | 1,216.5 | Cum | 140 ₹1.7 L | 135 ₹1.6 L |
| 7.00 | Supplying and spreading sand gravel mix ratio of 1 : 1 for 10 cm thick over the top of bund and other places as required at site of work including watering and consolidation using power roller, etc, complete complying with standard specifications and as directed by the departmental officers | 30.75 | Cum | 1,200 ₹36,900 | 1,160 ₹35,670 |
| 8.00Providing and placing in position of Plain Cement Concrete of grade M 10 using hard well graded coarse aggregate of maximum nominal size of 40mm weigh batching the ingredients and mixing in approved mixers/ batching plant (to produce concrete of the specified characteristic strength of 10N/Sqmm in 28 days) including dewatering the placement site by bailing / pumping and diverting wherever necessary, laying the concrete in layers of not exceeding 15cm thick and in bays, compacting and finishing the surface to the profile with all leads and lifts, watering, curing to attain the strength as specified in the drawing for various depth and height below and above ground level etc., complete complying with standard specification and as directed by the Engineer in charge of work. | |||||
| 8.01 | Below 1.50m depth and up to 4.50m depth below Ground level | 386 | Cum | 6,200 ₹23.9 L | 6,050 ₹23.4 L |
| 8.02 | Below 1.5m depth and up to 1.00m height from the ground level | 253 | Cum | 6,050 ₹15.3 L | 5,900 ₹14.9 L |
Tender Value
₹28.4 Cr
EMD Value
₹14.3 L
Closing Date
2 Sept 2025, 3:00 pmClosed
Superintending Engineer,WRD.,
Vaippar Basin Circle, WRD Campus, Opp. to VVV College, Madurai Road, Virudhunagar.
Construction of Anicut across Vaippar river to feed Nambipuram Tank in Muthulapuram Village in Ettayapuram Taluk of Thoothukudi District.
2025_WRD_595843_1
4/VBC/C.T-N/25-26/Dt.18.08.25
Open Tender
Civil Works - Water Works
540 days
Nambipuram Tank in Muthulapuram Village in Ettayap
Refer Tender Documents
8 documents required · 8 mandatory
₹0
₹14.3 L
6 Oct 2025
22 Aug 2025
3 Sept 2025
22 Aug 2025
2 Sept 2025
22 Aug 2025
Amount
Clearing Juliflora jungle without uprooting and disposing off the same and complete complying with standard specification and as directed by the Engineer in charge of work.
Dismantling, clearing away and carefully stacking material and without disturbing nearby structure useful for reuse for any thickness of brick or stone masonry in Cement Mortar walls under 3 (Three) meters high etc, complete as directed by the Engineer in charge of works and as per the technical specifications.
Dismantling, clearing away and carefully stacking material and without disturbing nearby structure useful for reuse for any thickness of Plain Cement Concrete under 3 (Three) meters high etc, complete as directed by the Engineer in charge of works and as per the technical specifications.
Earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders hard red gravelly soil inclusive of shoring to full depth, strutting and bailing out water wherever necessary and refilling the sides of foundations with excavated soil other than sand in layers of not more than 15cm thick. well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with an initial lead of 10 meters and initial lift of 2 meters and clearing levelling the site etc., complete complying with standard specification and as directed by the Engineer in charge of work.(SS20 B) (Narrow cutting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds,breaking clods, sectioning etc., complete
Earth work excavating and depositing on bank with initial lead of 10 and initial lift of 2m in sand silt or other loose soil wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil, including excavated earth etc., complete complying with standard specification and as directed by the Engineer in charge of work. . (SS20B For Open Excavation)
Supplying and spreading sand gravel mix ratio of 1 : 1 for 10 cm thick over the top of bund and other places as required at site of work including watering and consolidation using power roller, etc, complete complying with standard specifications and as directed by the departmental officers
Providing and placing in position of Plain Cement Concrete of grade M 10 using hard well graded coarse aggregate of maximum nominal size of 40mm weigh batching the ingredients and mixing in approved mixers/ batching plant (to produce concrete of the specified characteristic strength of 10N/Sqmm in 28 days) including dewatering the placement site by bailing / pumping and diverting wherever necessary, laying the concrete in layers of not exceeding 15cm thick and in bays, compacting and finishing the surface to the profile with all leads and lifts, watering, curing to attain the strength as specified in the drawing for various depth and height below and above ground level etc., complete complying with standard specification and as directed by the Engineer in charge of work.
Below 1.50m depth and up to 4.50m depth below Ground level
Below 1.5m depth and up to 1.00m height from the ground level
Providing and placing in position of Plain Cement Concrete of grade M 15 using hard well graded coarse aggregate of maximum nominal size of 40mm weigh batching the ingredients and mixing in approved mixers/ batching plant (to produce concrete of the specified characteristic strength of 15N/Sqmm in 28 days) including dewatering the placement site by bailing / pumping and diverting wherever necessary, laying the concrete in layers of not exceeding 15cm thick and in bays, compacting and finishing the surface to the profile with all leads and lifts, watering, curing to attain the strength as specified in the drawing for various depth and height below and above ground level etc., complete complying with standard specification and as directed by the Engineer in charge of work. (Without Vibration)
without vibration
Providing and placing in position of Plain Cement Concrete of grade M 15 using hard well graded coarse aggregate of maximum nominal size of 20mm weigh batching the ingredients and mixing in approved mixers/ batching plant (to produce concrete of the specified characteristic strength of 15N/Sqmm in 28 days) including dewatering the placement site by bailing / pumping and diverting wherever necessary, laying the concrete in layers of not exceeding 15cm thick and in bays, compacting and finishing the surface to the profile with all leads and lifts, watering, curing to attain the strength as specified in the drawing for various depth and height below and above ground level etc., complete complying with standard specification and as directed by the Engineer in charge of work.
Concrete below 1.50m depth and up to 4.50m depth below Ground level
Concrete 1.50m depth BGL and 1.00m Height AGL
Providing and placing in position of Plain Cement Concrete of grade M 15 using hard well graded coarse aggregate of maximum nominal size of 40mm (60%) and 20mm (40%) weigh batching the ingredients and mixing in approved mixers/ batching plant (to produce concrete of the specified characteristic strength of 15 N/Sqmm in 28 days) including dewatering the placement site by bailing / pumping and diverting wherever necessary, laying the concrete in layers of not exceeding 15cm thick and in bays, vibrating, compacting and finishing the surface to the profile with all leads and lifts, watering, curing to attain the strength as specified in the drawing for various depth and height below and above ground level etc., complete complying with standard specification.
Concrete below 1.50m depth and up to 4.50m depth below Ground level
Concrete 1.50m depth BGL and 1.00m Height AGL
Concrete above 1 m height and up to 4.50m height above ground level
Cement concete of gradeM20 using 40mm down graded (70% 40mm and 30%20mm ) ISS Graded HBGS Jelly including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of form work, soft water, labour charges for mixing, transporting, laying and curing concrete, working art depths, Tools and plants and incidential charges etc., complete as per relevant standard specifications. (for Abutment& pier)
Providing and placing in position of Plain Cement Concrete of grade M 20 using hard well graded coarse aggregate of maximum nominal size of 20mm weigh batching the ingredients and mixing in approved mixers/ batching plant (to produce concrete of the specified characteristic strength of 20N/Sqmm in 28 days) including dewatering the placement site by bailing / pumping and diverting wherever necessary, laying the concrete in layers of not exceeding 15cm thick and in bays, compacting and finishing the surface to the profile with all leads and lifts, watering, curing to attain the strength as specified in the drawing for various depth and height below and above ground level etc., complete complying with standard specification and as directed by the Engineer in charge of work.
Concrete below 1.50m depth and up to 4.50m depth below Ground level
Concrete 1.50m depth BGL and 1.00m Height AGL
Concrete above 1 m height and up to 4.50m height above ground level
Without Vibration
Providing and placing in position of Reinforced Cement Concrete M20 grade using hard well graded coarse aggregate of maximum nominal size of 20mm weigh batching the ingredients and mixing in approved mixers/ batching plant (to produce concrete of the specified characteristic strength of 20N/Sqmm in 28 days) including dewatering the placement site by bailing / pumping and diverting wherever necessary, laying the concrete in layers of not exceeding 15cm thick and in bays, compacting and finishing the surface to the profile with all leads and lifts, watering, curing to attain the strength as specified in the drawing for various depth and height below and above ground level etc., complete complying with standard specification and as directed by the Engineer in charge of work.
Providing and placing in position of Reinforced Cement Concrete M25 grade using hard well graded coarse aggregate of maximum nominal size of 20mm weigh batching the ingredients and mixing in approved mixers/ batching plant (to produce concrete of the specified characteristic strength of 25N/Sqmm in 28 days) including dewatering the placement site by bailing / pumping and diverting wherever necessary, laying the concrete in layers of not exceeding 15cm thick and in bays, compacting and finishing the surface to the profile with all leads and lifts, watering, curing to attain the strength as specified in the drawing for various depth and height below and above ground level etc., complete complying with standard specification and as directed by the Engineer in charge of work.
Concrete 1.00m above ground level and 1.50m depth below Ground level
Concrete below 1.50m depth and up to 4.50m depth below Ground level
Concrete above 1 m height and up to 4.50m height above ground level
Reinforced Cement concrete of grade M30 using hard broken aggregate of maximum nominal size of 20mm HBG and down grade to I.S specified grading, mixed in mixer machine including dewatering the placement site, laying the concrete in layers and in bays, vibrating, compacting and finishing the surface with all leads and lifts, watering, curing complete to attain the profile and strength as specified inthe drawings and specification for various depths and heights below and above ground level complete as directed by the Engineer complying with specification
Wearing Coat with Cement concrete of grade M30 using 20mm including cost and conveyance of all materials, labour charces, vibrating charges including curing, finishing etc., complete as per standred specifications and directed by departmental officers.
Supplying and erecting water tight steel centering for sides and soffits including supports and strutting up to height of 3.29 m high for plain surface with all cross bracings using mild steel B.G.10 gauge sheets of size 90cm x 60cm stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak (country wood) joists of size 10cm x6.5cm spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specification and as directed by the by the Engineer in charge of work (The retrieved materials should be taken back by the contractor ). The payment for centering should be made after the concrete is laid etc.,
Centering without strutting
Centering with stutting up to 3.29 m Height
Centering Above 3.29 m and up to 4.29m Height
Centering with stutting up 4.29m to 5.29 m Height
Supplying fabricating and placing in position of Ribbed tor steel bars of various diameter for all Reinforced Cement Concrete works including cost of rods, binding wire, Labour Charge for cutting the rods to the required length, bending, tying and fixing in position complete for various height below and above ground level etc., Complete complying with standard specification and as directed by the by the Engineer in charge of work.
Providing filter zone below the concrete block with coarse sand for bottom layer and broken graded stone for top layers as furnished in the drawing and as directed by the Engineer including collection of course sand conveying, stacking the same for pre-measurement and providing a layer of 20 cm thick, watering and consolidating, supplying hard braked stone of the following sizes, stacking for pre-measurement. laying the stones of 10 mm size for 7.5cm thick, 20mm size of 7.5cm thick 40mm size for 10cm thick 80mm size for 15cm thick in layer and packing etc., Complete complying with standard specification and as directed by the by the Engineer in charge of work.
Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MOST's (Roads Wing) specifications for Roads and Bridges " Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete- 1Cum.
Supplying and filling well gravel in between the gaps of Cement Concrete blocks etc., complete complying with standard specification and as directed by the Engineer in charge
Supplying suitable well gravel and providing well gravel packing 15cm thick for revetment and road basement including stacking the same for pre-measurement spreading and working with water to plastic state complete as directed by the Engineer in charge
Rough stone dry packing for launching apron using jetty size revetment stones (with new hard granite stone) including stacking charges for premeasurement. etc., Complete complying with standard specification and as directed by the by the Engineer in charge of work.
Rough stone dry packing using new rough stones for apron and revetment including stacking charges for premeasurement and finishing etc., Complete complying with standard specification and as directed by the by the Engineer in charge of work.
Providing and fixing weep holes of 110mmdia PVC pipe of working pressure 4Kg/cm2 to a required length for protection wall , Abutment & Wing wall etc., Including cost of all materials to work site including labour charges for 90cm spherical backfill arrangement with 110 mm dia and 20mm size hard granite broken stone charges at the periphery, the labour charges for fixing to drain the back fill etc., Complete complying with standard specification and as directed by the by the Engineer in charge of work.
Providing and fixing seepage pipes of 100mm PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to worksite, cost and labour for 900 mm dia. semi-spherical backfill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing etc., complete to drain the backfill in the abutments and wings. .
Supplying and fixing 300mm wide PVC EXPANSION JOINT in the 20mm expansion gap provided in between deck and dirt wall over abutment as shown in the drawing including cost and conveyance of expansion joints including shalimar pad and joint sealant etc., complete.
Providing construction, contraction and lift joins in masonry, concrete including cutting, jointing the pvc water stopper of 230mm width and placing mastic pad of 20mm thick (1.04 kg of asphalt & 0.98 m2 of mastic pad required for 1 Rmt)at the joints below the water stopper after cutting to the required size including the filling the joints with mastic filling as specified in the drawings etc., Complete complying with standard specification and as directed by the by the Engineer in charge of work. (For Anicut)
Providing construction, contraction and lift joins in masonry, concrete including cutting, jointing the pvc water stopper of 230mm width and placing mastic pad of 20mm thick (1.04 kg of asphalt & 2.97 m2 of mastic pad required for 1 Rmt)at the joints below the water stopper after cutting to the required size including the filling the joints with mastic filling as specified in the drawings etc., Complete complying with standard specification and as directed by the by the Engineer in charge of work. (ForProtection Wall)
Refilling with excavated earth (other than sand) with all leads and lifts for filling the cut open wherever necessary in layers including breaking clods, watering and compaction using power roller to at least 95 % of Procter density at OMC in each layer and sectioning etc., complete complying with standard specification and as directed by the Engineer in charge of work.
Filling behind Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete. -1 Cum
Supplying and Fixing demarcation R.C.C. pre cast posts in Cement concrete of grade M20 with well graded aggregates and the nominal maximum size of coarse aggregate of size 20 mm of size 0.15 x 0.15 x 1.20 M and fixing the post 40 Cm depth below ground level, the post includes using 4 numbers of 8mm RTS main rod to a length of 1.325 M, using 6mm MS 9 numbers as strips with steel centering and painting the post with enamel paint to a height of 0.80 M around the post etc. complete and conveying the post to the site of demarcation boundary such as tank bund and foreshore including earth work excavation for foundation in HSC having the base plain cement concrete of 10 cm of grade M15 concrete using hard blue granite broken stone of graded metal 1/3 Part of 40mm & 2/3 Part of 20 mm size, and the post embedded by using Cement concrete of grade M10 with well graded aggregates and the nominal maximum size of coarse aggregate of 20 mm etc., complete as directed by the Engineer in charge of works and as per the technical specifications
Dewatering using 3hp to 70hp diesel engine pumpset including hire charges, Cost of diesel, Engine oil, Pump operator, Labour charges, Conveyance of pumpset and fuel to site and back, Loading, Unloading and any other incidencial charges etc., complete
Providing Hand rails arrangement to operationg platform made one of 75x75x6mm M.S Angle as vertical post and 3 rows of 50 mm G.I pipe as horizontzl rows. The rate including of cost of materials, labour for welding, cutting, drilling, painting two coats of syenthetic enamel paint,hiring charges of D.C grn set, diesel consumption cost of Welding rod etc., complete complying with standard specification and as directed by the the Engineer in charge of work.
Earth work deploying earth moving machineries for desilting channel and forming bund on either side and depositing the earth on banks including jungle Clarence etc. complete complying with standard specification and as directed by the Engineer in charge of work. (having a width more than 10m)-For River regradation
Earth work deploying earth moving machineries for desilting channel and forming bund on either side and depositing the earth on banks including jungle Clarence etc. complete complying with standard specification and as directed by the Engineer in charge of work. Channel having a width of 3m to 10m
Extra watering and consolidation by power roller including hire charges in formation of strengthening existing bund complete
Earthwork in all soils except hard rock requiring blasting and conveying for formation of flood bank from approved borrow area and transporting the same with a lead of 5KM MR + 1KM CT deploying earth moving machineries and Tippers including benching, formation of bund in layers of suitable thickness, depending upon type of compaction equipment deployed and not exceeded 23cm thickness, breaking clods, watering to Optimum moisture content (OMC) and compaction of each layers to 95 % of Procter density through deployment of appropriate compaction equipment (8-10 T) power roller / vibratory power roller/ short width (+0.90m width drum) power roller or vibratory power roller ensuring compaction of designed bund section also ensuring compaction of earth fill and side slopes through deployment of hydraulic excavators with steel plate fixtures attached to their booms/ heavy power roller capable of claiming 2.00(Horizontal):1.00(Vertical) slope including side slope complete complying with standard specification and as directed by the Engineer in charge of work.
Towards the payment of Mineral charges, Seigniorage fee, Green fund, District mineral fund and tax on Mineral Bearing Land for formation of flood bank to be paid to Revenue Department through the contractor etc., (Excluding cost of Earthwork excavation, conveyance and forming flood bank). (Ref: 1.G.O. 4 Natural Resources (MMC - 1) Department dated 22.08.2023, 2.G.O. (Ms) No 23. Industries (MME - 1), Department dated 23.02.2022, 3.Tamilnadu Mineral Bearing Land Tax Act,2024.
Fabricating, Supplying and erection of Screw gearing steel shutters of size above 1.00 m and upto 2.00m width consist of skin plate made out of 8mm thick mild steel plate and horizontally stiffened with 100x50mm mild steel channel at an interval not more than 0.50m and vertical stiffeners made out of same section at an interval not more than 0.60m and provided with 8mm thick mild steel gusset plate of required size on both sides fastened with rust free bolts and nuts etc. Conveying the fabricated shutter by using lorries including loading, unloading and leading the shutter to the vent. Erecting the new shutter and the shuttering arrangements in the vent in proper position by using necessary hoisting equipment. The shutter shall be painted with two coats of Anticorrosive black paint over one coat of Red Oxide Primer. The rate including cost of materials consumables, labours power charges, conveyance charges for all equipment required conveying , cost of petty civil works, trial operation of shutter and warranty for 5 years etc.,complete.
Fabricating, supplying and fixing of 63mm dia Screw Rod made up of Mild Steel duly machined and fully threaded to suit the Head set Assembly and provided with required holes. Conveying and leading the screw rod to the worksite. Fixing the screw rod to the shutter gusset plate with required bolt and nut in proper alignment to the head set . The Screw rod should be painted with two coats of AC black paint over one coat of red oxide primer. The rate including cost of materials, labours, charges for all fabricating and hoisting equipments, conveyance charges for labours and materials and warranty for 5 years etc., complete
Fabricating, supplying and fixing of Shutter Groove Angle made up of 65x65x6mm Mild Steel angle for required height including welding hold fast of size 25x25x6mm Mild steel angle 2 Nos on both sides and conveying and leading the groove angle to the vents. Fixing the angle to the grooves in proper alignment The groove angle should be painted with two coats of AC black paint over one coat of red oxide primer. The rate including cost of materials, consumables, labours charges for all fabricating and hoisting equipments, conveyance, petty civil works and warranty for 5 years etc., complete, etc.,
Supplying and fixing of Head Set Assembly medium duty with hexagonal nut (Approximate 70 Kg) made up of cast iron including moulding, machining and the hexagonal nut threaded to suit the Screw Rod provided with thrust bearings for smooth operation. Conveying and leading the head set assembly to the work site. Fixing the head set assembly to the top beam by using required rust fre bolts and nuts in proper alignment . The Head set assembly supplied with operating key and the both should be painted with two coats of AC black paint over one coat of red oxide primer. The rate including cost of materials, labours charges for wooden pattern, moulding and charges for labours and materials and warranty for 5 years etc., complete.
Fabricating, Supplying and fixing of Top Beam made up of 150x75mm (ISMB 150) duly drilled to suit the Head Set Assembly with required bed bolt made out of 25mm mild steel round rod duly threaded with suitable anchorage arrangements to a height of 0.60m with necessary Fish plate made out of 12mm mild steel plate of size 0.30 x 0.15m 2Nos with required holes.Conveying and leading the top beam arrangements to the work site. Fixing the top beam arrangements at the top of the vent in correct position including dismantling the existing eroded top beam, conveying and stacking and the section stores. The top beam should be painted with two coats of AC black paint over one coat of Red Oxide primer. The Rate including cost of materials, labours, charges for all fabricating and hoisting equipments, cost of petty civil works conveyance charges for labours and materials and warranty for 5 years etc.., complete.
Fabricating, Supplying and erection of Screw gearing steel shutters of size above 2.00 m and upto 3.00m width consist of skin plate made out of 10mm thick mild steel plate and horizontally stiffened with 150x75mm ISMB 150 at an interval not more than 0.50m and vertical stiffeners made out of 100x50mm mild steel channel ISMC at an interval not more than 0.60m and provided with 10mm thick mild steel gusset plateof required size on both sides fastened with rust free bolts and nuts etc.Conveying the fabricated shutter by using lorries including loading, unloading and leading the shutter to the vent. Erecting the new shutter and the shuttering arrangements in the vent in proper position by using necessary hoisting equipments. The shutter shall be painted with two coats of Anticorrosive black paint over one coat of Red Oxide Primer. The rate including cost of materials consumables, labours power charges, conveyance charges for all equipments required conveying the dismantled materials to the section stores, cost of petty civil works, trial operation of shutter and warranty for 5 years etc..complete.
Fabricating, supplying and fixing of 80mm dia Screw Rod made up of Mild Steel duly machined and fully threaded to suit the Head set Assembly and provided with required holes. Conveying and leading the screw rod to the worksite. Fixing the screw rod to the shutter gusset plate with required bolt and nut in proper alignment to the head set including dismantling the existing damaged screw rod, conveying and stacking at section store. The Screw rod should be painted with two coats of AC black paint over one coat of red oxide primer. The rate including cost of materials, labours, charges for all fabricating and hoisting equipments, conveyance charges for labours and materials and warranty for 5 years etc., complete
Fabricating, supplying and fixing of Shutter Groove Angle made up of 100x100x10mm Mild Steel angle for required height including welding hold fast of size 40x40x6mm Mild steel angle 3 Nos on both sides and conveying and leading the groove angle to the vents. Fixing the angle to the grooves in proper alignment including dismantling the existing damaged groove angles, conveying and stacking at section store. The groove angle should be painted with two coats of AC black paint over one coat of red oxide primer. The rate including cost of materials, consumables, labours, charges for all fabricating and hoisting equipments, conveyance, petty civil works and warranty for 5 years etc., complete.
Fabricating, supplying and fixing of Shutter Groove Angle made up of 150x150x12mm Mild Steel angle for required height including welding hold fast of size 50x50x6mm Mild steel angle 3 Nos on both sides and conveying and leading the groove angle to the vents. Fixing the angle to the grooves in proper alignment including dismantling the existing damaged groove angles, conveying and stacking at section store. The groove angle should be painted with two coats of AC black paint over one coat of red oxide primer. The rate including cost of materials, consumables, labours, charges for all fabricating and hoisting equipments, conveyance, petty civil works and warranty for 5 years etc., complete.
Providing new 3T capacity worm gear box assembly consist of cast iron top and bottom plates, worm nut made up of pig iron, worm shaft made up of EN8 steel rod and two numbers of thrust bearings. The top and bottom plates machined to suit the worm nut and shaft. The worm nut threaded inside to suit the 63mm dia screw rod and the outer side formed with helical teeth cutting to suit the worm shaft. The worm shaft machined to the required shape and size and provided with helical teeth to suit with the worm nut.The assembly fixed with two numbers of thrust bearing one on top and another on bottom of the worm nut and fastened with required bolt and nuts. The operating key made with 80mm square rod shaping with wire cutting machine and welded with operating handle made up of 32mm dia steel rod for required length. The gear box is to be rest on the top of MS stand made up of 75x75x8mm MS angle and the top covered with 16mm thick MS plate and the stand fixed on the 150x75mm MS channel fixed over top of the beams in platform. The gear box align with the screw rod and fixed with required bolts nuts etc., complete and as directed by the departmental officers. Painting the hoisting arrangements with two coat of aluminium oxide paint over two coat of zinc rich primer The rate including cost of worm gear, cost of all materials required, labour charges, process charges like gas cutting, welding, machining, milling, labour charges for dismantling, loading, lifting, unloading, transport, erection, charges for equipment’s like derrick, chain pulley block, conveyance charges of to and fro of equipment’s and labours to the site including cost of trial operation of the Shutter, inclusive of all taxes, etc., complete and as directed by the departmental officers and warranty for 5years etc., complete .
Fabricating, Supplying and fixing of Top Beam made up of 200x100mm (ISMB 200) duly drilled to suit the Head Set Assembly with required bed bolt made out of 25mm mild steel round rod duly threaded with suitable anchorage arrangements to a height of 0.60m with necessary Fish plate made out of 16mm mild steel plate of size 0.20x 0.30m 2 Nos with required holes. Conveying and leading the top beam 25 arrangements to the work site. Fixing the top beam arrangements at the top of the vent in correct (e) position including dismantling the existing eroded top beam, conveying and stacking and the section stores. The top beam should be painted with two coats of AC black paint over one coat of Red Oxide primer. The Rate including cost of materials, labours, charges for all fabricating and hoisting equipments, cost of petty civil works conveyance charges for labours and materials and warranty for 5 years etc... complete
Supplying and fixing of Bottom Flat Rubber seal with Mild Steel Flat plate throughout the length of Rubber seal and fitted with the existing structure by means of Mild Steel Washers, Nuts and Bolts, then conveying, loading and unloading and stacking to section store, etc.., complete.
Supplying and fixing of Side rubber seal - Z type with Mild Steel Flat plate throughout the length of Rubber seal and fitted with the existing structure by means of Mild Steel Washers, Nuts and Bolts , then conveying, loading and unloading and stacking to section store, etc.., complete.
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using Carted Eath with a lead of 3km for formation of Approach Road.
97% Compaction
100% Compaction
Providing and laying Gravel soling for 150mm thick with clean good gritty gravel over the well prepared sub grade from the approved quarry including cost and conveyance of material, laying in accordance with the requirements and specification. The materials shall be laid in ;one or more layers as sub-base according to the line and grade and cross action shown in the drawing or as directed by the Engineers.
Supply of NP3 lass RCC 900mm dia Pipe Confirming to IS 458/2003 including Cost of Pipes on Finished Work including all other incidental charges, testing charges including unloding, transporting and delivery in good condition at work Site etc., complete, as directed by the Departmental officers as per standard specifications.
Hoisting and fixing of NP3 lass RCC 900mm dia Pipe and collars in proper gradient including all other incidental charges etc., complete, as directed by the Departmental officers as per standard specifications.
Construction of granular sub-base by Providing close graded Material, mixing in a mechanical mix piant at OMC, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause401.(Grading-V Materials)
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of materials, labour charges, rentais for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5.
Providing and laying Prime Coat over WBM/WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to bituminous construction over it, including cost of material, labour charges, rental for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5.
Providing and laying Tack Coat over WBM/WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rental for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5.
Providing and laying Bituminous Concrete to 30/40mm using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, paver Finisher, Vibratory roller and all other tools and plant required, including fuei and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5.
Painting two coats of newly plastered wall surface with ready mixed plastic Exterior emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
M/S Annanmar Constructions (BID ID -1445148)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
TenderDocumentVaipparanicut.pdf
Tender Documents • 1.15 MB
BOQ_712025.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid