| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.3 LAccepted-AOC H NO 1237 PANA PAPOSIAN NARELA NORTH WEST DELHI NEW DELHI 110 040 | NEW DELHI | NORTH WEST DELHI | DELHI | 110040 | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹37.6 L+₹32,016.50 (0.86%)Rejected-Finance | L2 | Rejected-Finance Not Being L1 | |
| 3 | L3₹38.2 L+₹89,188.50 (2.39%)Rejected-Finance RZ F1 104 MAHAVIR ENCLAVE PALAM NEW DELHI 110045 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110045 | L3 | Rejected-Finance Not Being L1 | |
| 4 | L4₹38.5 L+₹1.2 L (3.23%)Rejected-Finance NOT AVAILABLE | L4 | Rejected-Finance Not Being L1 | |
| 5 | L5₹40.4 L+₹3.2 L (8.48%)Rejected-Finance PLOT NO 79 SIS PARK DICHAON ENCLAVE PP2914 NAJAFGARH SOUTH WEST DELHI NEW DELHI 110043 | WEST DELHI | DELHI | 110043 | L5 | Rejected-Finance Not Being L1 |
| Sl No | Description | Qty | Unit | M/S HARINDER SINGH L1 | M/S.M.S.Devi.Const.Co L8 | Chaudhary Constructions L6 | Baljeet Builders & Interior Decorators L4 | A R S CONSTRUCTION CO L10 | M/S Amrit Pal Singh & Sons L9 | M/S Parmod Johar L5 | innovision limited L7 | YP INFRA L2 | Ex Serviceman Enterprises L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of reinforced cement concrete of any description and in any position not otherwise specially provided for including cutting of reinforcement to facilitate demolition (Parapet wall) complete all as specified and as directed. | 2.24 | Cum | 200 ₹448 | 200 ₹448 | 199 ₹445.76 | 320 ₹716.8 | 500 ₹1,120 | 1,500 ₹3,360 | 1,200 ₹2,688 | 139 ₹311.36 Lowest | 200 ₹448 | 200 ₹448 |
| 2.00 | Demolition of Brickwork built in cement mortar including all quioins, arches, pillars etc complete all as specified and as directed. | 4.64 | Cum | 200 ₹928 | 100 ₹464 Lowest | 199 ₹923.36 | 280 ₹1,299.2 | 400 ₹1,856 | 600 ₹2,784 | 250 ₹1,160 | 112 ₹519.68 | 200 ₹928 | 200 ₹928 |
| 3.00 | Dismantling of brick tiles (laid flat or on edge) on roof surface.laid bedded and pointed in any mortar complete all as specified and as directed. | 874 | Sqm | 10 ₹8,740 | 5 ₹4,370 Lowest | 29 ₹25,346 | 30 ₹26,220 | 50 ₹43,700 | 25 ₹21,850 | 10 ₹8,740 | 31 ₹27,094 | 5 ₹4,370 Lowest | 30 ₹26,220 |
| 4.00 | M & L for demolition of mud in roof, any thickness, including plastering and leeping upto four storey bldg incl necessary scaffolding arrangement and removing from cantonment area or as directed complete all as directed. | 131 | Cum | 399 ₹52,269 | 200 ₹26,200 | 399 ₹52,269 | 320 ₹41,920 | 500 ₹65,500 | 700 ₹91,700 | 500 ₹65,500 | 148 ₹19,388 Lowest | 150 ₹19,650 | 450 ₹58,950 |
| 5.00 | M&L for Cement concrete type B-0, 1:2:4 (12.5mm graded aggregate) as in roof padding, finished even and smooth without using extra cement ,including cleaning the concrete surface by steel wire brushes, up to four stories bldgs, complete all as speified and as directed. | 35 | Cum | 5,899 ₹2,06,465 | 6,000 ₹2,10,000 | 4,555 ₹1,59,425 | 4,200 ₹1,47,000 Lowest | 6,000 ₹2,10,000 | 5,500 ₹1,92,500 | 5,000 ₹1,75,000 | 4,900 ₹1,71,500 | 4,800 ₹1,68,000 | 4,800 ₹1,68,000 |
| 6.00 | M&L for complete surface treatment and insulation system over concrete roof surface, including the following operations, complete all as specified and directed by Engineer-in-Charge:
a) Cleaning of existing roof surface using wire brush and air blower to remove dust, debris, and loose particles. Cutting open existing cracks in V-groove and sealing with polyurethane sealant or polymer-modified mortar. Repairing unsound surfaces using SBR-based bonding agent and polymer-modified mortar. Where required, filling horizontal depressions using free-flowing micro-concrete.
b) Applying single-component, solvent-based, moisture-cured polyurethane resin primer low viscous and high penetrative — using brush/roller at minimum 200 ml/sq.m (adjustable as per porosity). Primer to be mixed uniformly using electric stirrer.
c) Applying two coats of single-component, non-UV-resistant polyurethane waterproofing membrane over the primed surface at intervals of 4–6 hours. A 60 GSM non-woven geotextile fabric shall be embedded between coats.
Minimum total consumption: 1.8 kg/sq.m, achieving 1.2 mm average dry film thickness (DFT).
Membrane performance requirements:
• Tensile strength ≥ 1.8 N/mm²
• Elongation ≥ 650% (ASTM D412)
• Shore A Hardness ≥ 45 (ASTM D2240)
• Crack bridging ≥ 1.5 mm at -9°C (ASTM C836)
• Solid content ≥ 90%
• Complies with ASTM C836 and ASTM C898 | 874 | Sqm | 2,699 ₹23,58,926 | 3,800 ₹33,21,200 | 3,300 ₹28,84,200 | 2,625 ₹22,94,250 Lowest | 3,500 ₹30,59,000 | 3,700 ₹32,33,800 | 3,200 ₹27,96,800 | 3,500 ₹30,59,000 | 3,000 ₹26,22,000 | 2,700 ₹23,59,800 |
| 7.00d) Roof insulation using spray-applied Polyurethane Foam (PUF), applied with a two-component (Polyol and Isocyanate) system, achieving 80 mm average thickness, with closed-cell rigid foam (density: 45–50 kg/m³). Application to be done in layers over a surface with <5% moisture using mechanical spray foam equipment. PUF specifications: • Conforms to IS:12432 Part 3 • Thermal conductivity ≤ 0.023 W/m·K @ 25°C (ASTM C518) • U-Value ≤ 0.33 W/m²K (ECBC) • Tensile strength ≥ 400 kPa (ASTM D1623) • Compressive strength ≥ 300 kPa (ASTM D1623) • Closed cell content 96–98% (ASTM D2856) • Fire resistance: Class B2 (DIN 4102) e) Laying 150 GSM non-woven polyester geotextile as a separation/protection layer over PUF, laid loose with minimum 75 mm overlap at all joints. f) Application of high-SRI coating system, comprising: • One coat of self-priming coat (diluted 40% with potable water) • Two coats of PU-modified fiber-reinforced elastomeric membrane • All coats to be applied using brush/roller/spray at 4–6 hour intervals Minimum total consumption: 1.2 kg/sq.m | |||||||||||||
| 8.00Performance criteria: • Crack bridging ≥ 1.5 mm • SRI value ≥ 106 Note: 1. The rate quoted shall be inclusive of all labour, materials, tools and plants, scaffolding, masking/protection of adjacent surfaces, cleaning, consumables, testing, and workmanship. All work shall be carried out strictly as per manufacturer’s specifications and to the satisfaction of the Engineer-in-Charge. 2. Water Proofing Treatment shall be carried out by authorized applicator of manufacturer. 3. Product and his technical specification as per BoQ item shall be submitted by Contractor to Accepting Officer for his approval. 4. MoU between Authorized applicator and contracor shall be sumitted before commencement of Roof treatment Work. 5. The contractor shall give 10 years guarantee for effectiveness of water proofing treatment and 2.5% of work done amount for srl item No 6.00 or Rs 5000/- which is more shall be retained from contractors payment for a period of 10 years reckoned from date of physical completion of this work or in lieu, contractor may deposit FDR issued from bank for the said amount for 10 years, which shall be released by GE on expiry of satisfactory completion of 10 years period. Make : SIKA/Berger/Asian Paints/STP/Fosroc | |||||||||||||
| 9.00 | M & L for cement concrete 1:2:4 type B-1 using 20 mm graded crushed stone aggregate as in roof kerbs or mud stops, rounded or chamfered and hold fast on edge including necessary form work complete all as specified and as directed. | 0.4 | Cum | 5,999 ₹2,399.6 | 6,000 ₹2,400 | 7,999 ₹3,199.6 | 4,500 ₹1,800 Lowest | 5,000 ₹2,000 | 5,000 ₹2,000 | 4,500 ₹1,800 Lowest | 5,101 ₹2,040.4 | 5,000 ₹2,000 | 5,000 ₹2,000 |
| 10.00 | Dismantling wrought iron or mild steel/cast iron work of any description (steel window & Grill) complete all as specified and directed. | 2 | Qtl | 200 ₹400 | 100 ₹200 | 99 ₹198 Lowest | 120 ₹240 | 500 ₹1,000 | 450 ₹900 | 250 ₹500 | 139 ₹278 | 200 ₹400 | 100 ₹200 |
Tender Value
₹47.7 L
EMD Value
₹96,000
Closing Date
9 Sept 2025, 6:00 pmClosed
GE South Delhi Cantt-10
GE South Delhi Cantt-10
ADDN/ ALTN FOR ROOF TREATMENT AND CONNECTED B/R WKS IN OFFRS MD ACCN AT UPPER SHANKAR VIHAR AND OTHER CERTAIN MINOR WORKS IN THE AREA OF AGE B/R-II OF GE (SOUTH) DELHI CANTT-10
2025_MES_726659_1
GE/TOKEN-52/2025-26
Open Tender
Civil Works
Item Rate
120 days
GE South Delhi Cantt
As per Tender Documents
11 documents required · 11 mandatory
₹500
GE South Delhi Cantt
₹96,000
Yes
18 Oct 2025
19 Aug 2025
11 Sept 2025
19 Aug 2025
9 Sept 2025
2 Sept 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .