Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAccepted-AOC | ₹2.7 Cr | L1 | Accepted-AOC Due to lowest bid price |
| 2 | L2₹2.9 Cr+₹16.0 L (5.81%)Rejected-Finance | ₹2.9 Cr+₹16.0 L (5.81%) | L2 | Rejected-Finance Due to high bid price |
| 3 | L3₹3.1 Cr+₹33.5 L (12.2%)Rejected-Finance 35 MODEL TOWN G T ROAD JANDIALA GURU DISTRICT AMRITSAR | JANDIALA GURU | AMRITSAR | PUNJAB | ₹3.1 Cr+₹33.5 L (12.2%) | L3 | Rejected-Finance Due to high bid price |
Tender Value
₹3.2 Cr
EMD Value
₹6.3 L
Closing Date
11 Mar 2026, 12:00 pmClosed
Executive Engineer
Provincial Division PWD B and R DAC Complex Sangrur
Construction of Centre of Excellence (Onion) at Vill. Chulad Kalan Distt. Sangrur
2026_CEPW_161880_1
Bid No 90 Dt. 23-02-2026
Open Tender
Civil Works - Buildings
Percentage
180 days
Sangrur
Please refer Tender documents.
6 documents required · 6 mandatory
₹20,000
₹6.3 L
Yes
23 Jun 2026
25 Feb 2026
11 Mar 2026
25 Feb 2026
11 Mar 2026
25 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK:
SConstruction of Main Building (Centre of Excellence onion):
Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. | 747.73 | Cum | 35.82 | ₹26,783.69 |
| 2 | Cement concrete 1:5:10 with 40 mm gauge stone ballast. using concrete mixing volumetric type | 70.17 | Cum | 4,460.87 | ₹3,13,019.25 |
| 3 | Reinforced cement concrete M-25 mechanicaly batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. | 240.33 | Cum | 6,494.33 | ₹15,60,782.33 |
| 4 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) | 377.2 | Sqm | 221.24 | ₹83,451.73 |
| 5 | First class burnt brick work laid in cement sand mortar 1:6 in foundation and plinth. | 166.02 | Cum | 6,263.78 | ₹10,39,912.76 |
| 6 | Reinforced cement concrete M-25 mechanicaly batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in supersturcture. | 373.27 | Cum | 7,284.46 | ₹27,19,070.38 |
| 7 | Extra Rate For First Floor | 161.32 | Cum | 190.68 | ₹30,760.5 |
| 8 | Extra Rate For Second Floor | 51.06 | Cum | 381.37 | ₹19,472.75 |
| 9 | Cement concrete 1:3:6 with stone ballast or shingle 40 mm guage. using concrete mixing volumetric type
Extra for using needle vibrator where not included in the rates . | 7.97 | Cum | 4,984.25 | ₹39,724.47 |
| 10 | Extra Rate For Second Floor | 7.97 | Cum | 381.37 | ₹3,039.52 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
SBD.pdf
Tender Documents • 18.44 MB
BOQ_327953.xls
BOQ • 1.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .