Tender Value
₹6.6 Cr
EMD Value
₹13.2 L
Closing Date
15 Jun 2026, 11:00 amClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Deposit Work
Above/Below/Par
PROJECT
3 conditions · 2 needing a document upload
The tenderer should have minimum cumulative turnover from operation in the previous three financial years and the current financial year, at least 150% of the advertised value of the tender. The tenderers shall submit Certificates to this effect which may be an attested Certificate from the concerned department / client or Audited Balance Sheet duly certified by the Chartered Accountant/Certificate from Chartered Accountant duly supported by Audited Balance Sheet. The contact details of CA/Statutory Auditor along with UDIN No. shall be mandatorily mentioned on copy of certified Balance Sheet/Certificate.
The tenderer must have successfully completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: i.Three similar works each costing not less than the amount equal to 30% of advertised value of the tender or ii.Two similar works each costing not less than the amount equal to 40% of advertised value of the tender or iii.One similar work each costing not less than the amount equal to 60% of advertised value of the tender
Defination of Similar Work :- Trenching, laying, jointing, splicing, termination, testing and Commissioning of optical fiber cable. OR OFC maintenance works OR Any type of Railway Signaling works etc
7 conditions · 2 needing a document upload
As per the tender document.
As per tender document.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Supply, Installation, Trenching/HDD/Clamping, Laying of Duct, Blowing of OFC through Ducts, Splicing, Testing & Commissioning for OFC shifting work against Railway Track Doubling in the Luni-Samdari-Bhildi section of the JU Division
NR-P-OF-LUNI-SMR-26-27-2
NR-P-OF-LUNI-SMR-26-27-2
Open
Works - General
270 Days
Unknown (Unspecified Location)
₹0
₹13.2 L
15 Jun 2026
21 May 2026
1 Jun 2026
38 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 4,89,36,968 | ||
| — | 185.00 | — | — | ||
| Supply & installation of jointing pit as per drawing with cover and required trenching to ease out cable/duct. (The joint chamber should be of the size of outer dia 1100 mm, Height -600 mm (2 pieces of 300 mm each). The thickness of the wall should be 50 mm and each piece of the chamber should have suitable groves to fit each other).As per drawing Section-III,DRG.No- RCIL/N.Region/03/2004. | — | — | — | 9,72,635.65 | |
| — | 5830.00 | — | — | ||
| Supply and fixing of cable route markers as per Section-II Chapter-4,clause 4.15,drawing (Drg No.RCIL/N Region/1/2004). | — | — | — | 21,75,697.7 | |
| — | 1700.00 | — | — | ||
| Concreting for protection of OFC cable as per Section-II, Chapter-4,clause-4.18.2. | — | — | — | 90,63,006 | |
| — | 1530.00 | — | — | ||
| Supply & laying of 75 mm dia GI Pipe IS1239 medium grade with holes drilled as an anti theft measure with threads on either end for coupling etc. And suitable 5 Mtr. GI clamps as per site requirement on bridges/trenches/building entry/other surfaces. As per Section-II,chapter 8 ,AnnexureVIII. | — | — | — | 9,57,045.6 | |
| — | 69330.00 | — | — | ||
| Trenching to a depth of 1.2 mtr and appropriate width for pipe/duct/cable and backfilling after laying OFC as per Section-II,Chapter 4-Clause-4.1 to 4.14 (Normal Soil). | — | — | — | 65,46,138.6 | |
| — | 59300.00 | — | — | ||
| Trenching to a depth of 1.2 mtr and appropriate width for pipe/duct/cable and backfilling after laying OFC as per Section-II,Chapter 4-Clause-4.1 to 4.14 (Hard Soil). | — | — | — | 62,27,686 | |
| — | 455.00 | — | — | ||
| Cutting hard rock for 0.3mtr depth of trench | — | — | — | 1,29,174.5 | |
| — | 185.00 | — | — | ||
| — | 169954.50 | — | — | ||
| — | 154912.00 | — | — | ||
| Laying of HDPE duct in trenches. Supply and pulling of nylon rope through it as per Section-II,Chapter-4,Clause-4.13.16(a) | — | — | — | 16,74,598.72 | |
| — | 185.00 | — | — | ||
| Supply & installation of optical fibre splicing(Joint)Enclosure(24 F)for loose tube complete wilt all accessories as per TEC specifications no.TEC/GR/OJC-02/02 Sept 2003 or latest with the following additonal features.As per Section-II,Chapter -5,Clause 5.1 to 5.22 | — | — | — | 11,94,339.65 | |
| — | 35000.00 | — | — | ||
| Transportation of OFC cable/HDPE duct drum | — | — | — | 7,35,700 | |
| — | 421.00 | — | — | ||
| OFC route tracing & submission of corrected cable route plan (soft copy in CD and two hard copies). Cable Route plan should contain LC gates, culverts/bridges, joint chambers, stations, offset, depth of cable at every 100 mtrs | — | — | — | 8,11,414.35 | |
| — | 20050.00 | — | — | ||
| Horizontal Drilling at a approximately depth of 1.65/1.2 m below the formation level of the earth including insertion of DWC/HDPE pipes along with couplings etc. | — | — | — | 1,19,52,607 | |
| — | 8825.00 | — | — | ||
| Protective works to enable laying of OFC on Metallic Road, Level crossing gates, underneath the track for crossing of track, over the culverts and bridges other than girder bridges. This icludes supply of 120/103.5 mm OD/ID DWC pipe | — | — | — | 35,90,980.75 | |
| — | 20.00 | — | — | ||
| Supply and Installtion of Rack Mounted Fiber Management system 19 " with all installtion material, Splicing, Termination and testing of 1X24 (Rly) /2X24(RCIL) fiber of cable with all connectors material as per instruction of site Engineers. | — | — | — | 4,38,723.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Luni_SMD_TD.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .