Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 CrAccepted-Finance | ₹3.5 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹3.5 CrRejected-Finance | ₹3.5 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹3.6 CrRejected-Finance GRAM SAMAISA POST LAKHUN TEHSIL DHAURAHA DISTRICT LAKHIMPUR KHERI UTTAR PRADESH | DHAURAHA | LAKHIMPUR KHERI | UTTAR PRADESH | ₹3.6 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹3.8 CrRejected-Finance B 18 MOHALLA SHARDA NAGAR LAKHIMPUR KHERI | LAKHIMPUR KHERI | LAKHIMPUR KHERI | UTTAR PRADESH | ₹3.8 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹3.8 CrRejected-Finance | ₹3.8 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S K.K. TRADERS L13 | SHIVAM ENTERPRISES L7 | M/S CHAUDHARY ENTERPRISES L14 | M/s SARKAR BAHADUR SINGH L3 | M/S ARYAN ENTERPRISES L17 | M/S MAA BHAWANI CONSTRUCTION L11 | M/S- JANARDAN CONSTRUCTION L16 | APS CONSTRUCTION L15 | BALENDRA SINGH L1 | VISHNUPRAD CONSTRUCTION PVT LTD L10 | ASHUTOSH KUMAR VERMA L2 | M/S SUSHIL KUMAR SINGH THEKEDAR L4 | M/S A S ASSOCIATE L8 | M/S SINGH CONSTRUCTION L6 | M/S SANTOSH KUMAR SRIVASTAVA CONTRACTOR L5 | RAM NARAYAN YADAV L9 | VIJAY KUMAR SINGH L12 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supplying and dumping earth filled HDPE bags in Nylon crate size 1.00x1.00x1.00 mtr mesh size 20 x 20 cm. including all cost of material, labour, T&P.etc. complete.. | 25,200 | Nos | 819.99 ₹2.1 Cr | 785 ₹2.0 Cr | 850 ₹2.1 Cr | 713.19 ₹1.8 Cr | 860 ₹2.2 Cr | 820 ₹2.1 Cr | 860 ₹2.2 Cr | 860 ₹2.2 Cr | 684.64 ₹1.7 Cr | 820.88 ₹2.1 Cr | 550 ₹1.4 Cr | 729 ₹1.8 Cr | 740 ₹1.9 Cr | 772 ₹1.9 Cr | 715 ₹1.8 Cr | 770 ₹1.9 Cr | 824.34 ₹2.1 Cr |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm. in depth, 1.50 m. in width as well as 10 sqm. on plan) including getting out and disposal of excavated earth lead upto 50 m. and lift upto 1.50 m. as directed by Engineer in charge. (In all kinds of soil) | 10,416 | Cum | 109.99 ₹11.5 L | 100 ₹10.4 L | 112 ₹11.7 L | 92.34 ₹9.6 L | 110 ₹11.5 L | 107 ₹11.1 L | 110 ₹11.5 L | 110 ₹11.5 L | 88.7 ₹9.2 L | 106.28 ₹11.1 L | 100 ₹10.4 L | 75 ₹7.8 L | 100 ₹10.4 L | 48 ₹5.0 L | 100 ₹10.4 L | 90 ₹9.4 L | 106.73 ₹11.1 L |
| 3.00 | Earth work in filling with exacaved earth over Geo Bag pitching including all lead and lift above with manual compaction and dressing. | 1,365 | Cum | 69.99 ₹95,536.35 | 64.5 ₹88,042.50 | 71 ₹96,915 | 58.53 ₹79,893.45 | 70 ₹95,550 | 67.45 ₹92,069.25 | 70 ₹95,550 | 70 ₹95,550 | 56.2 ₹76,713 | 67.37 ₹91,960.05 | 50 ₹68,250 | 50 ₹68,250 | 65 ₹88,725 | 42 ₹57,330 | 70 ₹95,550 | 70 ₹95,550 | 67.66 ₹92,355.90 |
| 4.00 | Supplying & Laying Geo Textile sheet 200 GSM made with woven multifilament polypropyline yarn in all lead & lift including cost of material, labour, T&P etc. complete. | 5,460 | Sqm | 129.99 ₹7.1 L | 117.5 ₹6.4 L | 130 ₹7.1 L | 107.18 ₹5.9 L | 129 ₹7.0 L | 124.75 ₹6.8 L | 125 ₹6.8 L | 128 ₹7.0 L | 102.9 ₹5.6 L | 123.37 ₹6.7 L | 100 ₹5.5 L | 80 ₹4.4 L | 120 ₹6.6 L | 125 ₹6.8 L | 110 ₹6.0 L | 110 ₹6.0 L | 123.89 ₹6.8 L |
| 5.00 | Supplying and Laying of 200 GSM Geo bags 100% PP Multifilament yarn of size 1.00x0.75 m containing RBM/Local earth on slope pitching of single layer including cost of all material,lift,labour and T&P etc. | 15,376 | Cum | 239.99 ₹36.9 L | 218 ₹33.5 L | 240 ₹36.9 L | 198.35 ₹30.5 L | 249 ₹38.3 L | 238 ₹36.6 L | 238 ₹36.6 L | 238 ₹36.6 L | 190.65 ₹29.3 L | 228.59 ₹35.1 L | 220 ₹33.8 L | 215 ₹33.1 L | 230 ₹35.4 L | 235 ₹36.1 L | 200 ₹30.8 L | 230 ₹35.4 L | 229.55 ₹35.3 L |
| 6.00 | Supplying and Dumping Porcupine (made with R.C.C. 1 : 1.50 : 3) size 3.00X3.00X3.00 M. filled with Jhakhar etc. complete. | 1,606 | Nos | 8,599.99 ₹1.4 Cr | 7,795 ₹1.3 Cr | 8,600 ₹1.4 Cr | 7,102.24 ₹1.1 Cr | 8,610 ₹1.4 Cr | 8,185 ₹1.3 Cr | 8,600 ₹1.4 Cr | 8,610 ₹1.4 Cr | 6,815 ₹1.1 Cr | 8,174.68 ₹1.3 Cr | 8,800 ₹1.4 Cr | 8,000 ₹1.3 Cr | 8,450 ₹1.4 Cr | 7,760 ₹1.2 Cr | 8,350 ₹1.3 Cr | 8,500 ₹1.4 Cr | 8,209.14 ₹1.3 Cr |
| 7.00 | Dumping Porcupine size 3.00X3.00X3.00 M. filled with Jhakhar etc. complete by Hydra. | 1,606 | Nos | 309.99 ₹5.0 L | 370.5 ₹6.0 L | 409 ₹6.6 L | 337.55 ₹5.4 L | 409 ₹6.6 L | 390 ₹6.3 L | 405 ₹6.5 L | 405 ₹6.5 L | 324 ₹5.2 L | 388.52 ₹6.2 L | 300 ₹4.8 L | 325 ₹5.2 L | 400 ₹6.4 L | 350 ₹5.6 L | 380 ₹6.1 L | 400 ₹6.4 L | 390.15 ₹6.3 L |
| 8.00 | Supplying and bamboo bracing with 50 to 80 mm dia. Bamboo including cost of bamboo, labour etc. | 19,200 | R.M. | 89.99 ₹17.3 L | 86 ₹16.5 L | 95 ₹18.2 L | 78.32 ₹15.0 L | 94 ₹18.0 L | 90.5 ₹17.4 L | 92 ₹17.7 L | 90 ₹17.3 L | 75.2 ₹14.4 L | 90.15 ₹17.3 L | 70 ₹13.4 L | 68 ₹13.1 L | 90 ₹17.3 L | 65 ₹12.5 L | 85 ₹16.3 L | 90 ₹17.3 L | 90.53 ₹17.4 L |
Tender Value
Refer Docs
EMD Value
₹8.8 L
Closing Date
13 Mar 2026, 2:00 pmClosed
SUPERINTENDING ENGINEER
O/O XITH CIRCLE IRRIGATION WORKS AYODHYA
NIT 06 LOT 13
2026_UPIDC_1122365_13
06/SE-XI/2025-26
Open Tender
Civil Works
90 days
BARABANKI
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,898
₹8.8 L
O/O XITH CIRCLE IRRIGATION WORKS AYODHYA
8 Apr 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
7 Mar 2026
Supplying and dumping earth filled HDPE bags in Nylon crate size 1.00x1.00x1.00 mtr mesh size 20 x 20 cm. including all cost of material, labour, T&P.etc. complete..
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm. in depth, 1.50 m. in width as well as 10 sqm. on plan) including getting out and disposal of excavated earth lead upto 50 m. and lift upto 1.50 m. as directed by Engineer in charge. (In all kinds of soil)
Earth work in filling with exacaved earth over Geo Bag pitching including all lead and lift above with manual compaction and dressing.
Supplying & Laying Geo Textile sheet 200 GSM made with woven multifilament polypropyline yarn in all lead & lift including cost of material, labour, T&P etc. complete.
Supplying and Laying of 200 GSM Geo bags 100% PP Multifilament yarn of size 1.00x0.75 m containing RBM/Local earth on slope pitching of single layer including cost of all material,lift,labour and T&P etc.
Supplying and Dumping Porcupine (made with R.C.C. 1 : 1.50 : 3) size 3.00X3.00X3.00 M. filled with Jhakhar etc. complete.
Dumping Porcupine size 3.00X3.00X3.00 M. filled with Jhakhar etc. complete by Hydra.
Supplying and bamboo bracing with 50 to 80 mm dia. Bamboo including cost of bamboo, labour etc.
Please Enable Macros to View BoQ information
stage.html
html • 0.09 MB
techsummary_2089906.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
lot13document.pdf
Tender Documents • 3.02 MB
BOQ_2089906.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid