| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹52.4 LAdmitted-Finance | ₹52.4 L | H1 | Admitted-Finance |
| 2 | H2₹50.2 L−₹2.2 L (4.28%)Admitted-Finance VILL PO KOTA VIA PANAGARH BAZAR DIST BURDWAN WB PIN 713148 | BURDWAN | BURDWAN | WEST BENGAL | 713148 | ₹50.2 L−₹2.2 L (4.28%) | H2 | Admitted-Finance |
| 3 | H3₹49.2 L−₹3.2 L (6.11%)Admitted-Finance P O BUD BUD DIST BURDWAN PIN 713403 W B | BUD BUD | BURDWAN | WEST BENGAL | 713403 | ₹49.2 L−₹3.2 L (6.11%) | H3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K L BAKSHI AND SONS H3 | NATIONAL CONSTRUCTION CO H2 | M/S DEBNATH MONDAL H1 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling post (Wood/Steel or RCC) any section including taking out embedded portion in concrete, brick work , masonry etc, and making good disturbed portion complete all as specified and directed. | 112 | Rm | 8 ₹896 Lowest | 10 ₹1,120 | 12 ₹1,344 |
| 2.00 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. | 3 | Per Qtl | 560 ₹1,680 Lowest | 600 ₹1,800 | 650 ₹1,950 |
| 3.00 | Demolition for brickwork or stone/boulder masonry, built in cement mortar including all quoins, arches, facings, dressed stonework and precast concrete articles and removal or rubbish off the site complete all as specified and directed. | 15 | Cum | 399 ₹5,985 Lowest | 420 ₹6,300 | 450 ₹6,750 |
| 4.00 | Surface dressing n.exc (Not exceeding) 15 cm deep and getting out soft/loose soil complete all as spd and directed. | 55 | Sqm | 30 ₹1,650 Lowest | 35 ₹1,925 | 50 ₹2,750 |
| 5.00 | Excavation over areas n. exc1.5m deep and getting out in hard/dense soil complete all as specified and directed. | 351 | Cum | 280 ₹98,280 Lowest | 300 ₹1,05,300 | 350 ₹1,22,850 |
| 6.00 | Excavating in trenches , n.exc 1.5 m wide and n.exc 1.5 m depth for foundation etc or for shafts, wells, cesspits ,manhole pier hole, laying of cables, pipes etc n.exc 10 sqm on plan and n.exc 1.5m in depth and getting out in any kind of soil complete all as specified and directed.
Note : Manual excavation to be done. During excavation if any damage occured to existing cable any type/ water pipe line, it will be contractor responsibilty to get it repair and make functional by providing jointing kit etc without any extra cost. Contractor has to repair it within 24 hrs so that essential service can not be effected due to such damage.If contractor fails to repair it within 24 hrs penalty @ Rs 500/- will be charged to contractor. In this GE decision will be final, conclusive and binding. | 68 | Cum | 281 ₹19,108 Lowest | 290 ₹19,720 | 320 ₹21,760 |
| 7.00 | Excavating in post holes (or similar holes) each n exc 0.5 cu. m, getting out, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exceeding 25 cm, getting out in soft/loose soil complete all as specified and directed. | 62 | Each | 199 ₹12,338 Lowest | 210 ₹13,020 | 250 ₹15,500 |
| 8.00 | M & L for sand filling under floors or in foundation including watering and consolidation complete all as specified and directed. | 9 | Cum | 2,800 ₹25,200 Lowest | 2,825 ₹25,425 | 2,900 ₹26,100 |
| 9.00 | M&L for broken stone or boulders hard core gauge n.exc 63mm deposited, spred and levelled in layers n.exc 15cm thick, watered and rammed to a true surfaces complete all as specified and directed | 43 | Cum | 1,199 ₹51,557 Lowest | 1,230 ₹52,890 | 1,300 ₹55,900 |
| 10.00 | M&L for pavings, with mix of fly ash, clinker & stone dust in the proportion of 1:3:6 (ie 10% fly ash, 30% clinker and 60% stone dust ) laying in layers n. exc 10cm thick, watering, ramming and compacted with hand/power roller 8 to 12 tonn roller to required camber and gradient complete all as directed by Engineer-in-Charge. | 37 | Cum | 1,699 ₹62,863 Lowest | 1,750 ₹64,750 | 1,800 ₹66,600 |
Tender Value
₹49.2 L
EMD Value
₹98,400
Closing Date
24 Aug 2026, 6:00 pmClosed
GE PANNGARH
GARRISON ENGINEER PANAGARH, MILITARY ENGINEER SERVICES, PO-PANAGARH, DISTT- BURDWAN, STATE-WEST BENGAL PIN-713420
All as per BOQ
2026_MES_780960_1
8500-655/E8
Open Tender
Civil Works
Works
180 days
PANNGARH
As per tender documents
6 documents required · 6 mandatory
₹500
GE Panagarh
₹98,400
10 Sept 2026
27 Jul 2026
25 Aug 2026
27 Jul 2026
24 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling post (Wood/Steel or RCC) any section including taking out embedded portion in concrete, brick work , masonry etc, and making good disturbed portion complete all as specified and directed. | 112 | Rm | - | - |
| 2 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. | 3 | Per Qtl | - | - |
| 3 | Demolition for brickwork or stone/boulder masonry, built in cement mortar including all quoins, arches, facings, dressed stonework and precast concrete articles and removal or rubbish off the site complete all as specified and directed. | 15 | Cum | - | - |
| 4 | Surface dressing n.exc (Not exceeding) 15 cm deep and getting out soft/loose soil complete all as spd and directed. | 55 | Sqm | - | - |
| 5 | Excavation over areas n. exc1.5m deep and getting out in hard/dense soil complete all as specified and directed. | 351 | Cum | - | - |
| 6 | Excavating in trenches , n.exc 1.5 m wide and n.exc 1.5 m depth for foundation etc or for shafts, wells, cesspits ,manhole pier hole, laying of cables, pipes etc n.exc 10 sqm on plan and n.exc 1.5m in depth and getting out in any kind of soil complete all as specified and directed.
Note : Manual excavation to be done. During excavation if any damage occured to existing cable any type/ water pipe line, it will be contractor responsibilty to get it repair and make functional by providing jointing kit etc without any extra cost. Contractor has to repair it within 24 hrs so that essential service can not be effected due to such damage.If contractor fails to repair it within 24 hrs penalty @ Rs 500/- will be charged to contractor. In this GE decision will be final, conclusive and binding. | 68 | Cum | - | - |
| 7 | Excavating in post holes (or similar holes) each n exc 0.5 cu. m, getting out, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exceeding 25 cm, getting out in soft/loose soil complete all as specified and directed. | 62 | Each | - | - |
| 8 | M & L for sand filling under floors or in foundation including watering and consolidation complete all as specified and directed. | 9 | Cum | - | - |
| 9 | M&L for broken stone or boulders hard core gauge n.exc 63mm deposited, spred and levelled in layers n.exc 15cm thick, watered and rammed to a true surfaces complete all as specified and directed | 43 | Cum | - | - |
| 10 | M&L for pavings, with mix of fly ash, clinker & stone dust in the proportion of 1:3:6 (ie 10% fly ash, 30% clinker and 60% stone dust ) laying in layers n. exc 10cm thick, watering, ramming and compacted with hand/power roller 8 to 12 tonn roller to required camber and gradient complete all as directed by Engineer-in-Charge. | 37 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_874842.xls
BOQ • 0.51 MB
PS655.pdf
Tender Documents • 1.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .