| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹85.2 LAccepted-AOC NAYAN JYOTI TALUKDAR SORBHOG PO SORBHOG PS SORBHOG DISTRICT BARPETA PIN 781317 | BARPETA | ASSAM | 781317 | L1 | Accepted-AOC Awarded | |
| 2 | L1₹85.2 LRejected-Finance JYOTI NAGAR P S PATHSALA P O PATHSALA DIST BAJALI | PATHSALA | BAJALI | ASSAM | 781325 | L1 | Rejected-Finance Rejected | |
| 3 | Rejected-Technical BARPETA | BARPETA | ASSAM | 781301 | - | Rejected-Technical Technically disqualified. Refer to technical minutes | |
| 4 | Rejected-Technical VILL P O BAMAKHATA DIST BAJALI ASSAM PIN 781325 | BAMAKHATA | BAJALI | ASSAM | 781325 | - | Rejected-Technical Technically disqualified. Refer to technical minutes | |
| 5 | Rejected-Technical SAONAGAON BONGAIGAON MULAGAON BONGAIGAON BONGAIGAON 781038 | KAMRUP METRO | ASSAM | 781038 | - | Rejected-Technical Technically disqualified. Refer to technical minutes |
Tender Value
₹89.7 L
EMD Value
₹1.8 L
Closing Date
12 Oct 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Director
OFFICE OF THE DIRECTOR OF SOIL CONSERVATION, ASSAM BHUMI SHANGRAKHAN BHAWAN, R.G.B. ROAD, GUWAHATI-781005
Integrated Approach to Erosion Control and Water Conservation at Dholagaon village under Ghoga Watershed in Bongaigaon District under RIDF-XXVIII DURING 2022-23
2023_SCD_32631_4
Tender/NIT/Pt/2023-24/6166
Open Tender
Civil Works
Item Rate
90 days
Bongaigaon
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,800
₹1.8 L
Yes
6 Jan 2024
22 Sept 2023
13 Oct 2023
22 Sept 2023
12 Oct 2023
29 Sept 2023
Amount
Part -I
Clearing and grubbing surface drain including rank vegetation, grass, bushes, Shurb, Sapling etc.and dispose of unserviceable materials.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out etc.
Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally)
Cost of Haulage excluding loding and unloading of Man size Boulder
Providing & laying RCC signboard including writing in engrave lettering.
Part - II
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and sauctioned up to lead of 1000metres including removal.
Earth work in excavation of foundation trenches including filling up the trenchers& removal of surplus spoil after completion of foundation work, ramming, dressing of sides and bottom etc. as directed and specified.
Providing soling in foundation and under floor with stone/ best jhama brick, sand packed after preparing the subgrade.
Providing PCC work in foundation with 13mm to 38mm size downgraded gravel including curing bailing out water shoring where necessary finishing etc. complete as directed (in prop 1:3:6)
Providing RCC work with Prop. 1:2:4 in foundation, abutement of wing wall with proper reinforcement as per design & specification as directed.
Supplying of Reinforcement (TMT) in position to reinforce cement concrete work with two piles 0.9 mm. (20 S.W.G.) annealed wire as per specification etc. complete as directed.
Cement plastering 12 mm. thick in proper 1:3 including cleaning the surface & curing etc. complete as directed.
Earth work by head load in filling embankment in layers not exceeding 20cm thick including breaking clods, dressing and sectioning, cambering and ramming, within a lead up to 30 m and lift up to 1.5m etc.
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.
R.C.C. sigenboard including painting & writing in engrave lettering etc.
Part - III
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and sauctioned up to lead of 1000metres including removal.
Earth work in exacavation for drainage channel as per drwaing & technical specification including settingout, construction of shoring and bracing removal of stumps & other deleterious matter dressing of sides & bottom etc.
Providing & laying RCC signboard including engrave lettering.
Part -IV
Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201.
Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants.
R.C.C Signboard including painting & writing in engrave lettering etc.
Part - V
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees etc.
Construction of diversion channel to divert the flow of water in up stream of the proposed structure.
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification. i) Above GBL
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification .ii )Below GBL
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation.
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork, curing completed as directed.
Supplying, fitting and placing TMT bar reinforcement in sub-structure complete as per drawing and technical specifications.
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications.
Providing and laying of Filter media with granular materials/stone crushed aggregates.
Earth work by head load in filling embankment in layers not exceeding 20cm thick including breaking clods, dressing and sectioning, cambering and ramming etc.
Turfing with Sods (Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the engineer including preparation of ground, fetching of rods and watering)
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.
Providing and laying hand tubewell
Providing R.C.C. Signboard including writing engrave lettering
Part - VI
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees.
Construction of diversion channel to divert the flow of water in up stream of the proposed structure.
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification. i) Above GBL
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification .ii )Below GBL
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork, curing completed as directed.
Supplying, fitting and placing TMT bar reinforcement in sub-structure complete as per drawing and technical specifications.
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications.
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications.
Earth work by head load in filling embankment in layers not exceeding 20cm thick including breaking clods, dressing and sectioning, cambering and ramming etc.
Turfing with Sods (Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the engineer including preparation of ground, fetching of rods and watering)
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.
Providing and laying hand tubewell
Providing R.C.C. Signboard including writing engrave lettering
Nayanjyoti Talukdar
stage.html
html • 0.05 MB
techsummary_52350.pdf
PDF • 1.87 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_52350.pdf
PDF • 1.94 MB
DholagaonBarpeta.pdf
PDF • 0.18 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .