Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹42,580
Closing Date
18 Jun 2024, 3:00 pmClosed
Block Development officer (Vpt) , Kottur
Block Development office , Kottur
1. Desilting of Thirumaottai Pidari kulam,Construction of Outlet in Thirumaottai Panchayat. 2. Construcytion of Samathuva cremation shed CC Road Com
2024_RDTN_453647_1
RC No 466/2024/aa1/10.06.2024 P1 ThirumakottaiPt
Open Tender
Civil Works
Works
180 days
Kottur Block
As per Tender Document
3 documents required · 3 mandatory
₹0
₹42,580
Yes
21 Jun 2024
12 Jun 2024
18 Jun 2024
12 Jun 2024
18 Jun 2024
12 Jun 2024
Amount
1. Desilting of Thirumakottai Pidari kulam,Construction of Outlet in Thirumakottai Panchayat.
Clearing light jungles including cost and conveyance of all materials and all labour charges etc., complete
Earth work excavation in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinaries and tippers including benching , breaking clods, sectioning etc.
Sub Estimate Outlet
Earth work excavation in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinaries and tippers including benching , breaking clods, sectioning etc.
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
Cement Concrete 1:4:8 using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
Cement Concrete 1:3:6 using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
Supplying and erection of centering for retaining wall and bathing ghat including cost and conveyance of all material and all labour charges etc, complete
Providing and laying RCC Pipe Np2 Culverts including cost and conveyance of all material and all labour charges etc, complete
Refilling Earth filling between body wall including cost and conveyance of all material and all labour charges etc, complete
Provision for Name Borad
2. Construcytion of Samathuva cremation shed CC Road Compound wall in Thirumakottai Panchayat.
Providing 250mm dia RCC pile hole using hand bore drill and RCC 1:2:4 mix using 20mm ISS HBG Metal including cost and conveyance of all materials and all labour charges etc.,complete
Earthwork excavation in hard stiff clay soil except hard rock requiring bleasting such as soft clay mixed sand as per SS 20B
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
CC 1:4:8 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete Coloumn
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete, Sunshade
RCC 1:11/2:3 mix using 20mm ISS HBG Metal including cost and conveyanceof all materials and all labour charges etc.,complete For Tiebeam
Brick work in CM 1:5 mix using country bricks including cost and conveyance of all materials and all labour charges etc.,complete
Cement concrete 1:2:4 mix using 20mm ISS HBG Metal including cost and conveyance of all materials and all labour charges etc.,complete
Cost and supply and fabrication steel including cost and conveyance of all materials to site and all labour charges etc.,complete
Plastering in CM 1:3 mix using 10mm thick including cost and conveyance of all materials and all labour charges etc.,complete
Plastering in CM 1:5 mix using 12mm thick including cost and conveyance of all materials and all labour charges etc.,complete
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Sub Estimate CC Road
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS20B for fondation
Filling with good river sand including cost, conveyance for all materials & labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete
CC 1:3:6 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
CC 1:2:4 mix using 20 mm ISS HBG metal including cost of all materials & labour charges etc complete
Provision for tarped
Sub Estimate Compound wall
Earth work excavation in Hard stiff clay soil except hard rock requiring bleasting such as soft clay mixed sand as per SS 20B
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
Cement Concrete 1:4:8 using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
Brick work in CM 1:5 mix using country bricks including cost and conveyanceof all materials and all labour charges etc.,complete,Basement
Brick work in CM 1:5 mix using country bricks including cost and conveyanceof all materials and all labour charges etc.,complete,Superstructure
RCC 1:1.5:3 mix using 20mm ISS HBG Metal including cost and conveyanceof all materials and all labour charges etc.,complete for Tie beam
RCC 1:1.5:3 mix using 20mm ISS HBG Metal including cost and conveyanceof all materials and all labour charges etc.,complete for Column
Supply and Fabrication of steel including cost and conveyance of all materials and all labour charges etc.,complete
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete
Plastering in CM 1:5 mix using 12mm thick including cost and conveyance of all materials and all labour charges etc.,complete
Exterior emulsion two coats using colour pigments including cost and conveyance of all materials and all labour charges etc.,complete
Provision for Name Borad
3. Providing of CC road @ Nallampillai Mathaovil Theru Salai in Thirumakottai Panchayat.
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS20B for fondation
Filling with good river sand including cost, conveyance for all materials & labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete
CC 1:3:6 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
CC 1:2:4 mix using 20 mm ISS HBG metal including cost of all materials & labour charges etc complete
Provision for tarped
Provision for Name Borad
4.Providing of CC road @ Pillaiyar Kovil Theru Road in Thirumaottai Panchayat.
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS20B for fondation
Filling with good river sand including cost, conveyance for all materials & labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete
CC 1:3:6 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
CC 1:2:4 mix using 20 mm ISS HBG metal including cost of all materials & labour charges etc complete
Provision for tarped
Provision for Name Borad
5. Providing of CC road @ Maharajapuram Throwpathi amman Kovil Theru in Thirumakottai Panchayat.
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS20B for fondation
Filling with good river sand including cost, conveyance for all materials & labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete
CC 1:3:6 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
CC 1:2:4 mix using 20 mm ISS HBG metal including cost of all materials & labour charges etc complete
Provision for tarped
Provision for Name Borad
6. Providing of CC road @ Theradi Theru in Thirumakottai Panchayat.
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS20B for fondation
Filling with good river sand including cost, conveyance for all materials & labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete
CC 1:3:6 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
CC 1:2:4 mix using 20 mm ISS HBG metal including cost of all materials & labour charges etc complete
Provision for tarped
Provision for Name Borad
7. Providing of CC road @ Sivan Kovil Theru in Thirumakottai Panchayat.
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS20B for fondation
Filling with good river sand including cost, conveyance for all materials & labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete
CC 1:3:6 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
CC 1:2:4 mix using 20 mm ISS HBG metal including cost of all materials & labour charges etc complete
Provision for tarped
Provision for Name Borad
GST Amount for providing Service to Government Contract Works for the above works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
subramaniyan contractor
priyam enterprises
V.Visvanathan,Mannargudi
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .