Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹42.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹44.6 L+₹2.0 L (4.75%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-GST/RETURN NOT FILED THE LATEST AS PER THE ONLINE STATUS |
Tender Value
₹59.9 L
EMD Value
₹1.2 L
Closing Date
11 Sept 2026, 4:00 pmClosed
Executive Engineer RnB Division Langate
RnB Division Langate
Construction of peripheral walling and gate around Division Office Complex Langate
2026_PWDJK_323070_2
31/3111-20/2026-27/RnB/Langate Dated 01/09/2026
Open Tender
Civil Works
Percentage
180 days
Langate
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,600
MH 0059
₹1.2 L
22 Sept 2026
1 Sept 2026
12 Sept 2026
1 Sept 2026
11 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART A (Compound Walling) | - | - | - | - |
| 2 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: (SOR No 15.7.4) | 98.96 | Cum | 1,458.5 | ₹1,44,333.16 |
| 3 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:In cement mortar (SOR No. 15.9.2) | 81.56 | Cum | 1,740.45 | ₹1,41,951.1 |
| 4 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 120 cm girth upto and including 240 cm girth. (SOR No 2.27.3) | - | - | - | - |
| 5 | Beyond 30 cm girth upto and including 60 cm girth. | 3 | No | 379.05 | ₹1,137.15 |
| 6 | Beyond 60 cm girth upto and including 120 cm girth. | 2 | No | 1,683 | ₹3,366 |
| 7 | Beyond 120 cm girth upto and including 240 cm girth. | 5 | No | 7,795.7 | ₹38,978.5 |
| 8 | Above 240 cm girth | 4 | No | 15,627.5 | ₹62,510 |
| 9 | Earth work in excavation in all kinds of soil by mechinical means in trenches for foundation, drains, pipes, cables etc. (not exceeding 1.5 Mtr. In width) and for shafts, wells, cesspits and the like not exceeding 10 Sqm on plan depth up to 1.5 Mtr; including disposal of excavated earth and Root Cutting as per the directions of engineer incharge complete job. (SOR No 2.9.1) | 59.47 | Cum | 256.85 | ₹15,274.87 |
| 10 | Supply & laying of dry stone soling including hand packing and ramming including all leads lifts cost & carriages of materials involved upto site of work complete (NON SOR) | 14.72 | Cum | 1,200 | ₹17,664 |
stage.html
html • 0.02 MB
finance_1086240.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_1086240.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .