Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC | ₹8.4 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹8.4 LSame as L1Rejected-AOC | ₹8.4 LSame as L1 | L2 | Rejected-AOC Rejected |
| 3 | L2₹8.4 LSame as L1Rejected-AOC AT NEHUR COLONY PO NAYA BAZAR DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | ₹8.4 LSame as L1 | L2 | Rejected-AOC Rejected |
| 4 | L2₹8.4 LSame as L1Rejected-AOC | ₹8.4 LSame as L1 | L2 | Rejected-AOC Rejected |
| 5 | L2₹8.4 LSame as L1Rejected-AOC AT BARABODIA SALIPUR PO PATAPUR DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | ₹8.4 LSame as L1 | L2 | Rejected-AOC Rejected |
Tender Value
₹8.4 L
EMD Value
₹8,400
Closing Date
22 May 2026, 5:00 pmClosed
Executive Engineer,Div-III
Bikash Bhawan,Jagannath Lane,Badambadi-753012
Beautification of OMP Chhak Golei in Ward No.42.
2026_ORULB_127820_17
MC(CMC)CTC_Div-IIINo4/2026-27
Open Tender
Civil Works - Others
Percentage
30 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
₹8,400
Yes
15 Sept 2026
12 May 2026
28 May 2026
12 May 2026
22 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in all kind of soil including dressing and leveling the bed and depositing the soil with intial lead and lift etc complete. | 100.8 | CUM | 299.52 | ₹30,191.62 |
| 2 | Supplying and filling the foundation and plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming including cost, conveyance royalty and taxes of all materials, cost of as per the direction of Engineer-In-Charge. | 55.44 | CUM | 612.7 | ₹33,968.09 |
| 3 | Providing cement concrete for unreinforced cement concrete works of proportion (1:3:6) with 40mm size crusher broken hard granite (CBHG) metal of approved quality and from approved quarry in foundation bed and floors including cost of labour, materials (inclusive of cost, conveyance, royalties, taxes, loading and unloading) & equipments for handing, transportation, batching, mixing, placing in position vibrating, curing for __ days complete as per specification drawing and direction of the Engineer-in-charge. | 40.32 | CUM | 6,393.8 | ₹2,57,798.02 |
| 4 | Providing & laying cement concrete of prop. (1:2:4) using 12mm size, screened, washed hard black crusher broken granite chips of approved quality & from approved quarry including laying in the layers not exceeding 150mm thick hoisting, lowering, laying, watering and curing etc. complete to the required levels including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&p etc. as required for the work complete and as per direction of Engineer in charge. | 2.58 | CUM | 8,041.7 | ₹20,754.82 |
| 5 | Rigid smooth centering and shuttering for R.C.C work including false work and dismantling after casting including cost of all labour, materials, T&P required etc. as per the direction of Engineer in charge. | 33.6 | Sqm | 248.7 | ₹8,356.32 |
| 6 | Providing and laying 80mm thick factory made cement concrete interlocking faver block of M-40 grade bade by block making machine with strong vibratory compaction of approved size design & shape laid in required colur and pattern over and including 50mm thick thick compacted bed of coarse sand filling the joints with fine sand etc all complete as per direction of Enginer in charge. | 302.4 | Sqm | 608.4 | ₹1,83,980.16 |
| 7 | Supplying and fixing Pre cast Kerb stone of size 300mm x 300mm x 150mm of cement concrete M-30 grade of approved make design ,colour and size made by block machine with proper compaction fixed in required etc.complete in all respect conforming to IS.5785:1084 The rate shall incude cost of | 1,120 | Nos | 162.56 | ₹1,82,067.2 |
| 8 | Painting two coats of synthetic enamel paint over a coat of primer to iron works as per approved quality over a coat of primer ,sand papering ,polishing the surface ,including cost ,conveyance ,taxes of all materials ,cost of all labour ,T&P etc. as required for the work complete as per the direction of EIC. | 352.8 | Sqm | 264.6 | ₹93,350.88 |
| 9 | Remove excavated & dismantled materials from the site by mechanical means with loading and unloading the same within 5 kms lead as per direction of enginner in charge . | 80.64 | CUM | 278.77 | ₹22,480.01 |
| 10 | Provission for Sign Board | 1 | Nos | 6,737.56 | ₹6,737.56 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_590917.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_590917.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .