Loading…
Loading…
Tender Value
₹54.6 L
EMD Value
₹1.1 L
Closing Date
20 Jun 2026, 6:00 pm6d left
EE WR Division Karauli
EE WR Division Karauli
Repair and renovation anicut of bahrai dande ke pas
2026_WRDAS_567117_3
NIT 02/2026-27
Open Tender
Civil Works
274 days
under jurisdiction of EE Karauli Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
as per nit
₹1.1 L
Yes
11 Jun 2026
11 Jun 2026
22 Jun 2026
11 Jun 2026
20 Jun 2026
11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor aftercutting. Thick | 3,000 | Sqm | 2.5 | ₹7,500 |
| 2 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect. Hard / dense soil | 1,248.75 | cum | 95 | ₹1,18,631.25 |
| 3 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985) | 11,771.35 | Kg. | 89 | ₹10,47,650.15 |
| 4 | Centering and shuttering for slabs, beams, lintels Columns, trough with or without caps and base including propping and remove | 396.1 | Sqm | 225 | ₹89,122.5 |
| 5 | Providing and Laying in position of Cement concrete Nominal mix (1:1.5:3) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto | 432.98 | cum | 6,091 | ₹26,37,281.18 |
| 6 | Dismantling old plaster or skirting, racking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 m lead, inclusive of de-watering wherever required. | 186 | Sqm | 20 | ₹3,720 |
| 7 | Plaster in cement sand mortar 1:4 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials of thickness: | 186 | Sqm | 314 | ₹58,404 |
| 8 | Dry boulder filling in required profile with filling of voids etc. complete including all lead & lifts, and well finished surface | 112.5 | cum | 1,286 | ₹1,44,675 |
| 9 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. Add extra for each subsequent lead of 500m or part, there of beyond ½ Km and up to 5 km ( source available at 3.25 km) | 1,200 | cum | 181.25 | ₹2,17,500 |
| 10 | Watering of earth including cost of carriage of water when source of water is up to 1 Km | 1,200 | cum | 12.6 | ₹15,120 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_1008852.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid