Loading…
Loading…
Tender Value
Refer Docs
Closing Date
11 Jun 2026, 3:00 pm4d left
Registrar BBAU
Registrar BBAU
Construction of Green House M.S. frame structure for orchard of dragon fruit of Dr. Sutanu Maji Dept of Horticulture
2026_BBAU_911459_1
BBAU/Civil/2026/377
Limited
Civil Works
30 days
BBAU
Please refer Tender documents.
1 document required · 1 mandatory
₹0
Exempted
4 Jun 2026
4 Jun 2026
12 Jun 2026
4 Jun 2026
11 Jun 2026
4 Jun 2026
4 Jun 2026 - 6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 2,600 | kg | 133.7 | ₹3,47,620 | BI01010001010000000000000515BI0100001113 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | 6.08 | cum | 177.5 | ₹1,079.2 | BI01010001010000000000000515BI0100001114 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 6.08 | cum | 7,878.5 | ₹47,901.28 | BI01010001010000000000000515BI0100001115 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_957914.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid