| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.5 LAdmitted-Finance 93 SOUTH ZONE COIMBATORE CORPORATION | ERODE | TAMIL NADU | 638459 | ₹33.5 L | L1 | Admitted-Finance |
| 2 | L2₹37.3 L+₹3.7 L (11.1%)Admitted-Finance | ₹37.3 L+₹3.7 L (11.1%) | L2 | Admitted-Finance |
| 3 | L3₹37.3 L+₹3.8 L (11.2%)Admitted-Finance 93 SOUTH ZONE COIMBATORE CORPORATION | TIRUPPUR | TAMIL NADU | 638459 | ₹37.3 L+₹3.8 L (11.2%) | L3 | Admitted-Finance |
| 4 | L4₹39.8 L+₹6.3 L (18.8%)Admitted-Finance COIMBATORE CORPORATION | ₹39.8 L+₹6.3 L (18.8%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | P. K. SHANMUGAM L4 | NMS ENGINEERS L2 | SHARVESH AND COMPANY L1 | R KANNAN L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in ordinary soil, light black cotton sandy loam and dry silt including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead and lift | 604 | Cum | 100 ₹60,400 Lowest | 120 ₹72,480 | 180 ₹1,08,720 | 190 ₹1,14,760 |
| 2.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 82 | Cum | 5,400 ₹4,42,800 | 5,000 ₹4,10,000 Lowest | 5,500 ₹4,51,000 | 5,300 ₹4,34,600 |
| 3.00Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | |||||||
| 3.01 | Centering without strutting-for drain | 1,125 | Sqm | 500 ₹5,62,500 | 500 ₹5,62,500 | 350 ₹3,93,750 Lowest | 500 ₹5,62,500 |
| 3.02 | Centering for soffits of RC slab including strutting | 448 | Sqm | 900 ₹4,03,200 | 500 ₹2,24,000 Lowest | 500 ₹2,24,000 Lowest | 650 ₹2,91,200 |
| 4.00 | Plain Cement Concrete 1:3:6 (one cement, three crushed Stone Sand (MSand) and six coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 181 | Cum | 6,500 ₹11,76,500 | 6,200 ₹11,22,200 | 5,500 ₹9,95,500 Lowest | 6,000 ₹10,86,000 |
| 5.00 | Supplying, fabrication and placing in position of steel reinforcement using mild steel of Ribbed tor steel rods, for all RCC works as per the design given by the departmental officers including cost of steel and binding wore and all labour charges for cutting, bending & tying etc., complying with standard specifications | 39 | Qtl | 9,000 ₹3,51,000 | 9,500 ₹3,70,500 | 8,500 ₹3,31,500 Lowest | 8,500 ₹3,31,500 Lowest |
| 6.00 | Reinforced Cement concrete 1:1.5:3 (one cement,one and half M.sand & three course aggregate) using 20mm gauge hand broken / and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 64 | Cum | 9,000 ₹5,76,000 | 9,000 ₹5,76,000 | 9,000 ₹5,76,000 | 8,500 ₹5,44,000 Lowest |
| 7.00 | Plastering in Cement Morter 1: 5 Mix using 12 mm Thick including Curing and all Labour Charges as per the Direction of the Departmental officers Etc., Complete | 328 | Sqm | 179 ₹58,712 | 300 ₹98,400 | 150 ₹49,200 Lowest | 300 ₹98,400 |
| 8.00 | Conveying the excavated earth from the site from 0 to 2 km lead including loading and unloading charges etc., completed. | 363 | Cum | 150 ₹54,450 | 4 ₹1,452 Lowest | 80 ₹29,040 | 90 ₹32,670 |
Tender Value
₹50 L
EMD Value
₹50,000
Closing Date
2 Sept 2026, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Contruction of Storm Water Drain and Culvert at Lorry Petai Anna Nagar, Ponvizha Nagar Main and Cross Road, Rose Park Main and Cross Roads in Ward No 86, South Zone,
2026_MAWS_694703_6
e60/2026-sz two cover
Open Tender
Civil Works
Works
180 days
Coimbatore corporation
As per tender doucuments
5 documents required · 5 mandatory
₹0
₹50,000
Yes
18 Sept 2026
17 Aug 2026
3 Sept 2026
17 Aug 2026
2 Sept 2026
17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in ordinary soil, light black cotton sandy loam and dry silt including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead and lift | 604 | Cum | - | - |
| 2 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 82 | Cum | - | - |
| 3Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | |||||
| 3.01 | Centering without strutting-for drain | 1,125 | Sqm | - | - |
| 3.02 | Centering for soffits of RC slab including strutting | 448 | Sqm | - | - |
| 4 | Plain Cement Concrete 1:3:6 (one cement, three crushed Stone Sand (MSand) and six coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 181 | Cum | - | - |
| 5 | Supplying, fabrication and placing in position of steel reinforcement using mild steel of Ribbed tor steel rods, for all RCC works as per the design given by the departmental officers including cost of steel and binding wore and all labour charges for cutting, bending & tying etc., complying with standard specifications | 39 | Qtl | - | - |
| 6 | Reinforced Cement concrete 1:1.5:3 (one cement,one and half M.sand & three course aggregate) using 20mm gauge hand broken / and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 64 | Cum | - | - |
| 7 | Plastering in Cement Morter 1: 5 Mix using 12 mm Thick including Curing and all Labour Charges as per the Direction of the Departmental officers Etc., Complete | 328 | Sqm | - | - |
| 8 | Conveying the excavated earth from the site from 0 to 2 km lead including loading and unloading charges etc., completed. | 363 | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
Building.pdf
Tender Documents • 0.94 MB
ITB.pdf
Additional Documents • 0.20 MB
BOQ_835378.xls
BOQ • 0.32 MB
FeeCorrigendum.pdf
PDF • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .