Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹68,495.24 RMO DG Set, WSP, FFS, FAS and AC units installed at Meterological office Bldg, Sector 39 C, Chandigarh SH Comprehensive Maintenance of Split, Window System | RMO DG Set, WSP, FFS, FAS and AC units installed at Meterological office Bldg, Sector 39 C, Chandigarh SH Comprehensive Maintenance of Split, Window System | L1 | |
| 2 | L2₹69,163.10+₹667.86 (0.98%) RMO DG Set, WSP, FFS, FAS and AC units installed at Meterological office Bldg, Sector 39 C, Chandigarh SH Comprehensive Maintenance of Split, Window System | RMO DG Set, WSP, FFS, FAS and AC units installed at Meterological office Bldg, Sector 39 C, Chandigarh SH Comprehensive Maintenance of Split, Window System | L2 | |
| 3 | L3₹71,094.87+₹2,599.63 (3.80%) RMO DG Set, WSP, FFS, FAS and AC units installed at Meterological office Bldg, Sector 39 C, Chandigarh SH Comprehensive Maintenance of Split, Window System | RMO DG Set, WSP, FFS, FAS and AC units installed at Meterological office Bldg, Sector 39 C, Chandigarh SH Comprehensive Maintenance of Split, Window System | L3 |
| Sl No | Description | Qty | Unit | PEE CEE REFRIGERATION L1 | ARUN KUMAR L2 | MONIKA L3 |
|---|---|---|---|---|---|---|
| 1 | As Per Schedule of Work | - | - | -4.62 ₹68,495.24 Lowest | -3.69 ₹69,163.1 | -1 ₹71,094.87 |
Tender Value
₹71,813
EMD Value
₹1,436
Closing Date
14 Apr 2026, 3:00 pmClosed
AE- E -4
Sanjay Jharbade
CCESD-IV CPWD
RMO DG Set, WSP, FFS, FAS and AC units installed at Meterological office Bldg, Sector 39 C, Chandigarh SH Comprehensive Maintenance of Split, Window System
148841
158/2025-26/CCED/CHD/SD-IV 2nd Call
OPEN
Electrical Works
NCB
7 months
Chandigarh, Chandigarh
8 documents required · 8 mandatory
₹1,436
Not Applicable
14 Apr 2026
7 Apr 2026
14 Apr 2026
14 Apr 2026
13 Apr 2026
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT+CPWD6AnnexureCPWD7ScheduleReceiptm.doc
document • 1.47 MB
Circular+PG+will+be+5+percent+of+ECPT.pdf
document • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .