Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance BOGDANG | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹9.8 L
EMD Value
₹19,560
Closing Date
19 Feb 2021, 4:00 pmClosed
Executive Engineer SSD Nobra
Office of the Executive Engineer SSD Nobra
Extension of link road Bogdang by way of B/wall and R/wall from RD 500mtr on wards under capex.
2021_PWD_2192_6
SSD/N/22 of 2020-21
Open Tender
Civil Works - Roads
Item Rate
45 days
Nobra
Please refer to tender document.
6 documents required · 6 mandatory
₹500
Yes
Payable To Executive Engineer SSD Nobra
₹19,560
Yes
3 Mar 2021
5 Feb 2021
22 Feb 2021
6 Feb 2021
19 Feb 2021
6 Feb 2021
Amount
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. a.All kinds of soil :
b. Ordinary Rock
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with:Cement mortar 1:6 (1 Cement : 6 coarse sand)Nallah incl carriage of cement.
Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone. Nallah
Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete incl carriage of cement.
Dry stone pitching (any thickness) excluding cost of stones. On Horizontal
Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)incl carriage of cement.
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
providing and laying of MS pipe for x-ing including trench excavation laying of pipe in proper slope refilling and making the surface good in carriage and cost of pipe complete job.(200mm dia).
Carriage of materials by M.T from source to site loading, unloading complete job. a. Sand and stone agg 05 km.
b. Stone an avg lead 7 km
b. Earth an avg lead 1 km
M/S IBRAHIM ALI
M/S MOHD IBRAHIM
M/S MOHAMMAD MOSSA
M/S ABDUL ALI
M/S HAJI MOHAMMAD ALI
M/S MEHDI ALI
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .