Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.8 LAccepted-Finance | 1 | Accepted-Finance satisfied | |
| 2 | Rejected-Technical 2 222 B PONNAGAR METTUR DAM 636401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | - | Rejected-Technical BQR NOT SATISFIED |
Tender Value
₹2.5 L
EMD Value
₹2,500
Closing Date
19 Jan 2023, 2:00 pmClosed
SE/M-II/MTPS-I
Superintending Engineer Mechanical-II Mettur Thermal Power Station-I Mettur Dam- 636406 Salem District
MTPS I M II Circle OAHS SUB DN III Servicing Calibration and stamping of 1 No 100 tonne capacity electronic weigh bridge installed at silo area and servicing of computer system and weigh bridge equipments
2023_EB_278576_1
SE M II MTPS I OAHS OT 95 2022 2023
Open Tender
Miscellaneous Works
Works
365 days
MTPS-I
As per Tender Specification
6 documents required · 6 mandatory
₹0
₹2,500
Yes
23 Jan 2023
4 Jan 2023
20 Jan 2023
4 Jan 2023
19 Jan 2023
4 Jan 2023
Amount
Charges for inspection and servicing of control panel, indicator and circuits of computer hardware’s of 100 tonne capacity Electronic Weighbridge with 8 nos. load cells installed in the silo area.
Charges for calibration & obtaining annual statutory stamping for the weighbridge installed in the silo area from the Assistant controller of Legal Metrology, Salem inclusive of providing necessary assistance.
Charges for dismantling the Monitor, CPU, Printer and other allied system, thorough cleaning, assembling and putting into service and checking the computer system of the Weighbridge.
Charges to arrest the excessive movement of the platform by providing new supports / strengthening of pumpers of all eight locations and strengthening of side frame / end frames. (Plates, Angles/ Channels will be provided by TANGEDCO)
Charges for replacement of defective load cell by lifting of platform, realigning of both insulating pads of all 8 Nos. of load cell and repositioning. Disconnecting the both sides of the load cell control cable, checking healthiness of the cable, and termination with junction box, Carrying out an ‘end- middle-end’ test for Rebalance the weigh bridge.
T&P and Consumables such as spanners, multi meter, wire brush, cotton waste etc. for item Sl. No. 5.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .