Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical REJECT |
| 4 | Rejected-Technical | Rejected-Technical Reject |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
16 Sept 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE, EUDC, MATHURA
SE, EUDC OFFICE, NEAR TANK CHAURAHA, MATHURA
Carrying out different electric line work under Full Deosit in the area of EE, EUDD I, Mathura in the jurisdiction of the Superintending Engineer, Electricity Urban Distribution Circle, Mathura
2022_DVVNL_725516_1
45/EUDC(M)/2022-23
Open Tender
Electrical Works
Item Wise
365 days
EE, EUDD I
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
dvvnl.org
₹20,000
1 Oct 2022
2 Sept 2022
16 Sept 2022
2 Sept 2022
16 Sept 2022
2 Sept 2022
180 days
Amount
Cartage of following material from Store centre, Mathura to work site.
ST Pole/PCC Pole (11/9/8.5 mtr. Long)
LT XLPE cable of size 3.5x240/150/95/70 sq.mm., 4x50 sq.mm.
LT PVC cable of size 1x630sq.mm.,
11KV XLPE cable of size 3x300/240/185/120/70 Sq.mm.
33 XLPE cable of size 3x120/185/50 Sq.mm.
Dog/Weasel Conductor
LT Aerial Bunch conductor.
Other line material such as cross arm, MS top channel, bottom channel, ACSR Dog/Rabbit/Weasel conductor, insulator, clamps, nut & bolts etc.
Digging of pit & erection of new single support ST Pole (11/9mtr. long) for 33KV line including grouting of pole and fixing of all clamps, cross arm, pin/disc insulator & other accessories as per relevant drawings. Any fabrication if required for above support.
Digging of pit & erection of new 11/9 mtr. Double ST Pole structure for 33KV line including grouting of pole and fixing of top channel, dropper channel, insulators & other accessories as per relevant drawings & any fabrication if required for above support.
Digging of pit & erection of new 11/9 mtr. triple ST Pole structure for 33KV line including grouting of pole and fixing of top channel, dropper channel, insulators & other accessories as per relevant drawings & any fabrication if required for above support.
Digging of pit & erection of new single support ST Pole (11/9 mtr. long) for 11KV line including grouting of pole and fixing of all clamps, cross arm, pin/disc insulator & other accessories as per relevant drawings. Any fabrication if required for above support.
Digging of pit & erection of new single support PCC pole (8.5mtr. long) for 11KV line including grouting of pole and fixing of all clamps, cross arm, pin/disc insulator & other accessories as per relevant drawings. Any fabrication if required for above support.
Digging of pit & erection of new Double ST Pole structure(11/9 mtr. long) for 11KV line/transformer including grouting of pole and fixing of top channel, dropper channel, insulators & other accessories as per relevant drawings & any fabrication if required for above support.
Digging of pit & erection of new Triple ST Pole structure(11/9 mtr. long) for 11KV line including grouting of pole and fixing of top channel, dropper channel, insulators & other accessories as per relevant drawings & any fabrication if required for above support.
Digging of pit & erection of new four ST Pole structure(11/9 mtr. long) for 11KV line including grouting of pole and fixing of top channel, dropper channel, insulators & other accessories as per relevant drawings & any fabrication if required for above support.
Digging of pit & erection of new single support ST Pole (11/9 mtr.) for LT line on ABC including grouting of pole and fixing of all clamps, insulator & other accessories as per relevant drawings. Any fabrication if required for above support.
Digging of pit & erection of new single support PCC Pole (8.5 mtr.) for LT line on ABC including grouting of pole and fixing of all clamps, insulator & other accessories as per relevant drawings. Any fabrication if required for above support.
Earthing of ST pole by M.S earth rod.
Painting of ST pole.
Digging of pit & erection of Stay rod with grouting cement sand and brick ballast including Nuzzling, binding Complete.
Laying of 33/11KV line on Dog/weasel conductor on erected poles.
Guarding of 33/11KV line.
Fixing of 33 KV Fuse Set
33 KV Fuse Set Structure
Providing and Fixing of 33 KV Cable Jointing Kit O/D & I/D 3x120/185 sqmm.
Providing and Fixing of 33 KV Cable Straight Through 3x185 sqmm.
Providing and Fixing of LT XLPE Cable 3.5x240/150/50 sq.mm. Straight through
Line Isolator 800 Amp.
Structure for Line Isolator 800 Amp.
33 KV Post Isolator
11 KV D.O. Fuse Set
Providing and Fixing of Aluminium Lug 240/150/50/630 sq.mm.
Laying of AB conductor for LT line on erected poles.
Laying of LT XLPE Cable
Providing & laying of HDPE pipe of dia 160 mm through trenchless method for laying of cable by horizontal boring machine below the ground level of 1.0 to 1.5 mtr.
Laying of Underground 33/11KV XLPE cable of size (3x300/240/185/120/70 Sq.mm) inside HDPE pipe.
Digging of Trench by excavation of earth 0.90/1.5 Mtr. deep put brick on both side, filling of sand, laying of cable, put the sand & bricks on cable & earth ramming and dressing properly with complete job for laying 11 KV/33 KV XLPE and LT cables in trench.
Installation of Distribution box on ST Pole/PCC Pole for AB Conductor.
Providing & fixing of G.I Pipe of diameter 6 inch for riser.
Jointing of cable with another cable/overhead line at the D/P structure through 33/11 KV outdoor cable jointing kit
Stringing of LT/HT XLPE Cable.
Installation of 33 KV VCB I/C CTR 800A /750 MVA
The Construction of new Plinth of Size 5’X5’X4’ above ground level and one ft. below the ground level for 400/250 KVA transformer
Removal of old transformer (400/250KVA) with all connecting accessories from existing plinth and shifting & installation of transformer with all connecting accessories to the newly constructed plinth including jumpering etc.
Removal of old transformer(100/63/25/16 KVA) with all accessories from existing double pole and shifting & installation of transformer with all connecting accessories to the newly constructed Double pole including jumpering etc.
Installation of following transformer on Plinth/Double pole with all connecting accessories jumering etc. including carriage of transformers from store centre, Mathura to work site.
33/0.4 KV, 250 KVA Transformer on Plinth
400 KVA Transformer on Plinth.
250 KVA Transformer on Plinth.
100 KVA Transformer on Double Pole structure.
63 KVA Transformer on Double Pole structure.
25 KVA Transformer on Double Pole structure.
Installation of 11 KV CT/PT combined unit on erected double pole structure.
Installation of pilfer proof metering cubicle.
Construction of M.S angle fencing of size (3M x3M x2M) around the plinth of 400/250KVA transformer and gap between the M.S angle should not be more than 65mm.
Complete chemical earthingof 11/0.4 KV, 250/400 KVA Distribution Transformer by digging pits 6” dia upto 3 mtr. deep including chemical filled pipe in between (pipe-in-pipe) ISI mark B Grade & connecting with G.I strip of size 50mm X 6mm with neutral/body of 11/0.4 KV distribution transformer to above pipe-in-pipe (PIP) and filling of chemical crystalline conductive mixture containing highly conductive material around the (pipe-in-pipe) up to 3 Mtr. including making of chamber at the top of the earthing. Other details are as below:- 1. Earth pipe material – mild steel, Galvanized. 2-Main Electrode diameter – 42.4mm. 3-Auxiliary Electrode pipe, Diameter – 76mm. 4-Wall Thickness of main Electrode: - 2.6mm. 5-Wall thickness of auxiliary hole: - 3.2mm. 6- Length of earthing electrode (PIP):- 3 Meter.
Earthing of Indoor Unit of 33/11 KV VCB Pannel, 33/0.4 kv, 250 kva T/F by digging of pit up to water level depth Approx. 90 feet. into the boring 1-1/4" dia GI pipe of "B" grade,conforming to the requirement of IS specification and then connecting the top of the inserted pipe and Distribution Transformer body earthing through M.S. strip of size 50x6mm with the help of Electric welding Lum Sum Rate. It includes the cost of all material, labour, T&P, Carrier etc. required for proper completion of work.
Dismantling of single support ST Pole/ PCC (11/9/8.5mtr.) pole with complete accessories and cartage of material from work site to Store Center, Mathura.
Dismantling of 33/11KV line and cartage of material from work site to Store Centre, Mathura.
Dismantling of LT line and cartage of material from work site to Store Centre, Mathura.
H R P ASSOCIATE
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .