RequiredExperience with Government
RequiredAnnual Turnover
RequiredCertificate (Requested in ATC)
RequiredOEM Authorization Certificate Bid to RA enabled No Octagonal Pole With Single Arm Or Double Arm Brackets ( 13 set ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Bid Requirement (Allowed Values) GENERIC The Octogonal pole Designing
RequiredEngineering
RequiredFabrication and testing before despath with required height and required no. of light Yes Yes 1/7 fittings with luminaire carriage etc.
Requiredfor illumination of open areas Height of Octogonal pole (in Meters) 7 7 Type of bracket for suitable fitment of luminare on the Octagonal pole Single Arm Single Arm Each bracket length (in mm) 1000 500
Required1000
Required1500 No. of LED Luminaires can be fitted in the bracket of each octagonal pole (in Nos.) 1 1 Installation
Requiredtesting and demonstration Including Civil work at site Including Civil work at site On site warranty (in Months) 12 12 OCTAGONAL POLE CONSTRUCTION Material of Octagonal pole Grade 355 as per IS:5986:2011 latest Grade 355 as per IS:5986:2011 latest
RequiredGrade 355 as per IS:5986:2011 latest
RequiredGrade 420 as per IS:5986:2011 latest
RequiredGrade 490 as per IS:5986:201 1 latest
RequiredGrade 560 as per IS:5986:2011 latest No.of section (in Nos.) 1 1 Cross section of Octagonal pole (no of sides) 8 sided polygon 8 sided polygon Internal distance between parallel faces at the base of pole 130 130
Required135
Required155
Required175
Required200
Required210 Internal distance between parallel faces at the top of pole 70 70
Required90
Required100 Octagonal pole sheet thickness 3 3
Required4
Required5 Type of welding Seamless Single longitutinal Saw weld (No circumference weld allowed) Seamless Single longitutinal Saw weld (No circumference weld allowed) 2/7 No of longitudinal welds (in Nos) 1 1 No. of stiffners per pole No 4
RequiredNo Metal protection treatment of fabircated mast section Hot dip Galvanised
Requiredas per IS:4759 latest: 460 g/m2 * Luminaire carriage brackets Fabricated suitably and hot dip galvanized for fixing and holding required no. of light fixtures * Door opening on base of the pole (opening permits clear access to equipment like MCB
RequiredSwitches
Requiredcables
Requiredetc.
Required) Door opening: 500 mm height from base plate
RequiredSize: 100 mm x 500 mm with Gasket Door opening: 500 mm height from base plate
RequiredSize: 100 mm x 500 mm with Gasket
RequiredWithout door opening Type of locking arrangement for door Pad lock with key Pad lock with key
RequiredWithout door opening BASE PLATE Base plate material Grade: E250
RequiredQuality:BR (as per IS:2062:2011 latest) Grade: E250
RequiredQuality:BR (as per IS:2062:2011 latest)
RequiredGrade: E275
RequiredQuality:BR (as per IS:2062:2011 latest)
RequiredGrade:E300
RequiredQuality:BR (as per IS:2062:201 1 latest)
RequiredGrade:E350
RequiredQuality:BR (as per IS:2062:201 1 latest)
RequiredGrade:E450
RequiredQuality:BR (as per IS:2062:201 1 latest)
RequiredGrade:E550
RequiredQuality:BR (as per IS:2062:201 1 latest)
RequiredGrade:E600
RequiredQuality:BR (as per IS:2062:201 1 latest) Base plate size - ( Length in mm x Width in mm x Thickness in mm) 200x200x12 200x200x12
Required225x225x16
Required250X250X16
Required275/275/16
Required300X300X16
Required300x300x20 Necessary accessories on each pole Suitable foundation Bolts
RequiredNuts and Washers and instruction manual Suitable foundation Bolts
RequiredNuts and Washers and instruction manual Each pole shall be Yes Yes 3/7 supply with suitable foundation bolts
Requirednuts and washers
RequiredInstruction manuals Foundation Bolt type J-Type J-Type No. of Bolts x No. of Nuts per Bolt x No.of Washers per Bolt for each pole (in Nos.) 4x3x3 4x3x3 Bolt size M16x500 M16x500
RequiredM16x600
RequiredM20x600
RequiredM20x700
RequiredM24x750 Conformity of specification for Bolts and Nuts as per IS:1367 (Part 2)
RequiredGrade A as per IS:1367 (Part 2)
RequiredGrade A
Requiredas per IS:1367 (Part 2)
RequiredGrade B
Requiredas per IS:1367 (Part 2)
RequiredGrade C Galvanization of foundation bolts and nuts and octagonal pole shall be Galvanized As per IS:4759 latest As per IS:4759 latest Earthing terminals on the base of the pole
Requiredfor lightning and electrical protection Using 12 mm dia SS Bolts of suitable length Using 12 mm dia SS Bolts of suitable length WIND LOAD Compliance to wind velocity test for the pole structure IS 875:1987 part 3 latest IS 875:1987 part 3 latest Regional wind withstand capacity which the pole structure support is suitable to withstand (in m/s) 33 33
Required39
Required44
Required47
Required50
Required55 Gust Factor 1.15 1.15 The designed Life of the Pole shall be (in Years) 25 25 ADD ON ITEMS Galvanized lightning finial for each pole (in Nos) 1 No. with 1.2 m length with Bolt and Nuts 1 No. with 1.2 m length with Bolt and Nuts
RequiredWithout Lightning Finial Aviation obstruction lights on top of each pole with vertical stand and with LED/GLS (in Nos) 1 No. LED 1 No. LED Junction box on the Yes Yes
RequiredNo 4/7 Carriage Assembly as required
Requiredfrom which the interconnections for the designed number of the light fixtures on the carriages Material of Junction Box Mild steel Cast aluminium
RequiredMild steel
RequiredGalvanized iron
RequiredWithout Junction Box Ingress protection class of Junction Box IP 66 (as per IS/IEC60529:2001 latest) IP 65 (as per IS/IEC60529:2001 latest)
RequiredIP 66 (as per IS/IEC60529:2001 latest)
RequiredIP 67 (as per IS/IEC60529 :2001 latest)
RequiredWithout Junction Box Cable (ISI Marked Cable) connections from the top junction box to the individual luminaries of each pole 2 C x 1.5 Sq.mm
RequiredCopper cable
RequiredFR Category as per IS:694 2 C x 1.5 Sq.mm
RequiredCopper cable
RequiredFR Category as per IS:694
Required2 C x 2.5 Sq.mm
RequiredCopper cable
RequiredFR Category as per IS:694
Required2 C x 4 Sq.mm
RequiredCopper cable
RequiredFR Category as per IS:694
Required3 C x 1.5 Sq.mm
RequiredCopper cable
RequiredFR Category as per IS:694
Required3 C x 2.5 Sq.mm
RequiredCopper cable
RequiredFR Category as per IS:694
Required3 C x 4 Sq.mm
RequiredCopper cable
RequiredFR Category as per IS:694
RequiredWithout Cable Connection Cable (ISI Marked Cable) connections from the Bottom of the pole i.e. from pole's door opening (Base compartment) to top junction box of each pole 2 C x 4 Sq.mm
RequiredCopper cable
RequiredFR Category as per IS:694 2 C x 4 Sq.mm
RequiredCopper cable
RequiredFR Category as per IS:694
Required2 C x 6 Sq.mm
RequiredCopper cable
RequiredFR Category as per IS:694
Required2 C x 10 Sq.mm
RequiredCopper cable
RequiredFR Category as per IS:694
Required2 C x 16 Sq.mm
RequiredCopper cable
RequiredFR Category as per IS:694
Required3 C x 4 Sq.mm
RequiredCopper cable
RequiredFR Category as per IS:694
Required3 C x 6 Sq.mm
RequiredCopper cable
RequiredFR Category as per IS:694
Required3 C x 10 5/7 Sq.mm
RequiredCopper cable
RequiredFR Category as per IS:694
Required3 C x 16 Sq.mm
RequiredCopper cable
RequiredFR Category as per IS:694
RequiredWithout Cable Connection Terminal Box with Circuit breakers and backlite sheet for cable termination at door opening (Base compartment) for each pole MCB
Required6A
Required1P
Required240V
RequiredAC MCB
Required5A
Required1P
Required240V
RequiredAC
RequiredMCB
Required6A
Required1P
Required240V
RequiredAC
RequiredMCB
Required10A
Required1P
Required240V
RequiredAC
RequiredMCB
Required16A
Required1P
Required240V
RequiredAC
RequiredWithout MCBs No.of MCB per Junction Box (in Nos.) 1 1
Required2
Required3
Required4
RequiredWithout MCBs Suitable winch mechanism (raising and lowering mechanism) according to pole height and according to no.of LED luminaires with necessary interlocking
Requiredwires and ropes for maintenance Manual Operated. Load carrying capacity: Min.750 Kg Manual Operated. Load carrying capacity: Min.750 Kg
RequiredWithout Winch Mechanism CERTIFICATIONS Availability of type test reports for the entire system including for Pole construction
Requiredwind load (velocity) tests
RequiredWinch Mechanism
Requiredfrom Central Govt.
RequiredLab/NABL.ILAC acreediated lab to prove conformity of the specification Yes Yes Test report Number - * Test Report date - * Name of lab - * Laboratory address - * Agreed to furnish all the test reports and certificates to buyer consignee on demand Yes * * Specifications highlighted in bold are the Golden Parameters. * Bidders may note that In respect of non-golden Parameters
Requiredthe specifications 'Values' chosen by Buyer will generally be preferred over 'Bid requirement ( allowed Values) by the Buyer. 6/7 Additional Specification Documents