| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.3 LAdmitted-Finance | -34.88% | ₹8.3 L | L1 | Admitted-Finance |
| 2 | L2₹8.8 L+₹52,099.80 (6.31%)Admitted-Finance | -30.77% | ₹8.8 L+₹52,099.80 (6.31%) | L2 | Admitted-Finance |
| 3 | L3₹8.8 L+₹55,268.88 (6.70%)Admitted-Finance | -30.52% | ₹8.8 L+₹55,268.88 (6.70%) | L3 | Admitted-Finance |
| 4 | L4₹8.9 L+₹63,508.51 (7.69%)Admitted-Finance | -29.87% | ₹8.9 L+₹63,508.51 (7.69%) | L4 | Admitted-Finance |
| 5 | L5₹9.0 L+₹76,058.10 (9.21%)Admitted-Finance | -28.88% | ₹9.0 L+₹76,058.10 (9.21%) | L5 | Admitted-Finance |
Tender Value
₹12.7 L
EMD Value
₹25,360
Closing Date
6 Jul 2026, 6:00 pmClosed
EE, PWD Dn I Pratapgarh
EE, PWD Dn I Pratapgarh
2) CD Repair Work Bhairvi to Ramakhedi
2026_CEPWD_571502_2
EE, PWD Dn I, Pratapgarh NIT No 06/2026-27
Open Tender
Civil Works
Percentage
90 days
Pratapgarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EE, PWD Dn I Pratapgarh by eGRAS Challan
₹25,360
Yes
10 Jul 2026
27 Jun 2026
7 Jul 2026
27 Jun 2026
6 Jul 2026
27 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 15 | Cum | 515 | ₹7,725 |
| - | Stone masonry in cement mortar for substructure complete as per drawing & MoRTH specification Clauses 1402, 1405 & 2200 and including Weepholes as per MoRTH specifications Clauses 2706 For All Rajasthan except Hanumangarh Random rubble masonry In 1:5 cement mortar | 110.83 | Cum | 2,600 | ₹2,88,158 |
| - | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2905. 1000 mm dia | 52.5 | Rmt | 3,864 | ₹2,02,860 |
| - | Back filling behind abutment, wing wall and return wall in 150mm layers, with mechanical compaction, complete with all lead and lift as per drawing and technical specification as per MoRTH Specification : Clause : 304 Gravelly material | 146 | Cum | 513 | ₹74,898 |
| - | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 R.C.C grade M 20 | 8.28 | Cum | 2,959 | ₹24,500.52 |
| - | Plastering with cement mortar (1:4), 20 mm thick on Stone work. | 170 | Sqm | 132 | ₹22,440 |
| - | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening & binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 1 as per MoRTH Specification Clause 404. For All Rajasthan except Bikaner, Churu, Hanumangarh and Sri
Ganganagar Using Crusher Broken Aggregate By Mechanical Means | 18.75 | Cum | 928 | ₹17,400 |
| - | Supplying, fitting, and placing HYSD bar reinforcement (Primary Steel) in Foundation, Substructure and superstructure at any level complete as per drawing and MoRTH specifications
Clauses 1009,1600 and 2302 | 0.9 | P.MT. | 80,077 | ₹72,069.3 |
| - | Construction of un-reinforced , plain cement concrete pavement M30 (Grade), thickness as per design, over a prepared sub base, with 43/53 grade cement as per Clause 602, coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a in fully automatic Batching Plant and transported to site in transit mixer for having continuous agitated mixer, manufactured as per approved mix design including pumping of R.M.C. from transit mixer to site of laying , with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge laid with a Fixed Form Paver (laying and fixing of 150 micron thick polythene Film and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments (Dowel Bars will be paid seprately). | 67.5 | Cum | 5,160 | ₹3,48,300 |
| - | Supply & Fixing of flood gauge (water Gauge) as per I.R.C. 67 standard 200 cm long fixed on angle iron posts 50x50x6 mm, 2.6M. long. | 2 | Nos. | 1,921 | ₹3,842 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tendernotice_2.pdf
PDF • 29.79 MB
BOQ_1016924.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .